HomeMy WebLinkAbout1990-107-07/17/1990-GREENHORNE AND OMARA INC PROFESSIONAL ENGINEERING SPRING CREEK STUART STOVER CHANNELIZATION RESOLUTION 90- 107
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROVING A PROFESSIONAL SERVICES AGREEMENT
WITH GREENHORNE & O'MARA, INC. FOR
PROFESSIONAL ENGINEERING SERVICES FOR THE
STUART/STOVER CHANNELIZATION PROJECT
WHEREAS, on September 20, 1988, the City Council adopted the Spring
Creek Basin Master Drainageway Plan; and
WHEREAS, the Spring Creek Basin Master Drainageway Plan identified
Spring Creek between Stuart Street and Stover Street as requiring
reconstruction and channelization; and
WHEREAS, there exists the opportunity to construct a bikeway in
conjunction with this project; and
WHEREAS, the State has granted funds for the reconstruction of the
Stover Street Bridge contained within this project; and
WHEREAS, in March of 1990, the City issued a Request for Proposals for
the above described services; and
WHEREAS, the Selection Committee reviewed thirteen proposals,
interviewed the top three firms and selected Greenhorne & O'Mara as the
most qualified firm for this project; and
WHEREAS, the design has been divided into two phases: Phase I,
preliminary design of the entire project and final design of the Stover
Bridge, bike underpass, and 500 feet of channel and bike trail ; Phase II
final design of the remainder of the project to include the Stuart Bridge,
bike underpass, and 1100 feet of channel and bike trail ; and
WHEREAS, the fee for Phase I shall not exceed $106, 103; Phase II
design services will be negotiated upon completion of Preliminary Design;
and Engineering Services during construction for either or both phases is
optional and negotiable; and
WHEREAS, funds for Phase I have been budgeted and appropriated and are
available in the Capital Projects Funds; and
WHEREAS, Section 8-129 of the Code of the City of Fort Collins ("the
Code") authorizes contracts for services of a professional , technical or
consulting nature, the major result of which would yield to the City a
report, a plan or a similar document upon approval of the City Manager
after evaluation in accordance with the procedure for selection of
professionals; and
WHEREAS, the Purchasing Agent has determined that Professional
Engineering Services for the Stuart/Stover Channelization Project comes
with the purview of this Section of the Code; and
WHEREAS, the City Manager has approved contracting for professional
services for Stuart/Stover Channelization Project; and
WHEREAS, Section 8-129 of the Code requires approval of the City
Council for any professional services agreement in excess of $20,000.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT
COLLINS that the professional services agreement with Greenhorne & O'Mara,
Inc. for the performance of Professional Engineering Services for the
Stuart/Stover Project is hereby approved.
Passed and adopted at a regular meeting of the Council of the City of
Fort Collins held this 17th day of July, A.D. 1990.
4
Mayor
ATTEST:
. hi-fi
City Clerk ^T— I Q�