HomeMy WebLinkAbout1987-068-05/19/1987-CENTRE FOR ADVANCED TECHNOLOGY SID RESOLUTION 87- 68
OF THE COUNCIL OF THE CITY OF FORT COLLINS ACCEPTING THE
PETITIONS OF PROPERTY OWNERS REGARDING THE INITIATION OF A
SPECIAL IMPROVEMENT DISTRICT, STATING THE NEED FOR, THE NATURE
OF, AND THE LOCATION OF THE IMPROVEMENTS TO BE MADE, DESCRIBING
THE AREA TO BE ASSESSED FOR THE SAME, AND DIRECTING THE DIRECTOR
OF PUBLIC WORKS TO PREPARE AND PRESENT TO THE CITY COUNCIL THE
NECESSARY INFORMATION FOR THE FORMATION OF SAID DISTRICT.
WHEREAS, the Council of the City of Fort Collins , Colorado
(the "Council" ) , has received Petitions from affected property
owners in the area (the "Petitioners" ) of the proposed Centre for
Advanced Technology Special. Improvement District ( the "District" )
requesting that said Council initiate proceedings for the
creation of the District for the purpose of acquiring ,
constructing, and installing street pavement, curb, gutters ,
sidewalks , street lighting , landscaping, landscaped median
islands, water mains, sanitary sewer lines, storm drainage
improvements and other necessary appurtenances in the City of
Fort Collins, Colorado (the "City" ) ; and
WHEREAS , the Council has received the Petitions , accepts the
same, and desires to proceed with the formation of the District.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
FORT COLLINS :
Section 1 . That the Petitions, as submitted by the
Petitioners requesting the formation of the District, are hereby
received and accepted.
Section 2 . That the improvements to be constructed will
consist generally of street pavement , curb, gutters , sidewalks,
street lighting, landscaping, landscaped median islands, water
mains, sanitary sewer lines, storm drainage improvements and
other necessary appurtenances. Such improvements are needed in
order to provide adequate access for vehicles and pedestrians to
the properties abutting the street to be improved, and in order
to provide water and sewer utility service, adequate storm
drainage, and landscaping amenities to properties within the
District .
Section 3 . That it is hereby recognized that the street
pavement, curb, gutters, sidewalks , street lighting, landscaping,
landscaped median islands, water mains , sanitary sewer lines ,
storm drainage improvements and other necessary appurtenances
will confer special benefits on the real property in the District
and general benefits to the City at large.
Section 4 . That the nature and location of the improvements
to be made in the District are generally as set forth on Exhibit
"A" attached hereto and by this reference incorporated herein and
more specifically in the District Engineering Report on file with
the City Clerk of the City.
Section 5 . That the Director of Public Works is hereby
directed to prepare and present to the Council the following:
a . Preliminary plans and specifications of the
improvements described herein; and
b. An estimate of the probable total cost of such
improvements, including the cost of planning , constructing , or
otherwise acquiring the same; engineering, legal and advertising
costs; interest during construction and until assessments are
made by ordinance against the properties benefited, and other
incidental costs incurred in the District; and
C. A map of the District to be assessed for the cost
of the improvements .
Section 6 . That the area to be assessed for the District
improvements which are described on Exhibit "A" hereto shall be
as set forth in the Petitions heretofore submitted by Petitioners
and on file with the City Clerk and in accordance with the
provisions of the ordinance creating and organizing the District .
Section 7. That the District shall be known as the Centre
for Advanced Technology Special Improvement District No. 90 .
Passed and adopted at a regular meeting of the City Council
held this 19th day of May, 1987.
Ma
ATTEST:
it Cle
2
EXHIBIT "A"
Nature and Location of District Improvements
Generally, improvements in the District will consist of
major improvements to Shields Street from Windtrail Condominiums
P.U.D. south to Drake Road including asphalt, base course, curb,
gutters, street lighting, landscaping and sidewalks with related
water , storm drainage and sanitary sewer improvements . District
improvements will also consist of internal street, water ,
sanitary sewer and storm drainage improvements within certain
District properties all as set forth more particularly as
follows :
PHASE 1 IMPROVEMENTS
Shields Street Improvements - Phase 1
Shields Street improvements will consist of the following:
( 1 ) The realignment , regrading , construction and
installation of Shields Street from the northern boundary of
Colorado State University Research Foundation' s property in the
District south approximately 1700 feet to a width of seventy feet
from flow line to flow line and including asphalt, base course,
curb, gutters , street lighting, landscaping (tree removal , tree
planting, reseeding and irrigation) and detached sidewalks five
feet in width;
( 2) The removal of an existing box culvert at the New
Mercer Ditch crossing and replacement with a five foot by twenty
foot concrete box culvert approximately ninety feet in length;
and
(3 ) The extension eastward approximately fifteen feet of an
existing box culvert at Larimer No. 2 Ditch crossing.
Interior Improvements - Colorado State University Research
Foundation ( "CSURF" ) Property
Interior improvements to the property owned by CSURF in the
District will consist of street, storm drainage, water and
sanitary sewer improvements as follows :
( 1) Streets
A. Construction of Center Avenue to City collector street
standards with asphalt, base course, curb, gutters, street
lighting and sidewalks beginning from the center of Meadowlark
Avenue within the development, northwest, to the curb return of
Meadowlark, a distance of approximately 50 lineal feet to the
eastern most point of the property.
B. Construction of a portion of the east half of Meadowlark
Avenue to City collector street standards with asphalt, base
course, curb, gutters, street lighting and sidewalks, beginning
at its intersection with Center Avenue southeast to its
intersection with West Drake Road, a distance of approximately
1710 lineal feet. Improvements will also consist of construction
of the west half of Meadowlark Avenue to City collector street
standards with asphalt, base course, curb, gutters, street
lighting and sidewalks from its intersection with West Drake
Road, north, a distance of approximately 600 feet.
( 2 ) Water
Water improvements will consist of a water main distribution
system under Meadowlark from its intersection with West Drake
Road north 600 feet and one-half of the water main system from
600 feet north of West Drake Road along Meadowlark to its
intersection with Center Avenue and including necessary
appurtenances thereto.
( 3 ) Storm Drainage
The storm drainage improvements will consist of a storm
drain system under Meadowlark Avenue from its intersection with
West Drake Road north 600 feet and a storm drain system
( including 1/4 of the box culvert at the New Mercer Ditch
Crossing) from the intersection of Center Avenue and Meadowlark
Avenue north along the proposed future alignment of Center Avenue
to its intersection with Spring Creek.
(4) Sanitary Sewer
Sanitary sewer improvements will consist of a sanitary sewer
collection system under Meadowlark from its intersection with
West Drake Road north 600 feet and one-half of the sanitary sewer
main system from 600 feet north of West Drake Road along
Meadowlark to its intersection with Center Avenue and including
necessary appurtenances thereto. The improvements will also
include a sanitary sewer collection system from the intersection
of Meadowlark and Center Avenues north along the future alignment
of Center Avenue a distance of 1060 feet then due north to its
intersection with the existing Spring Creek sanitary sewer .
Interior Improvements - Everitt Enterprises Limited Partnership
No. 1 ( "Everitt" )
Interior improvements to the property owned by Everitt in
the District will consist of street, storm drainage, water and
sanitary sewer improvements as follows :
(1) Streets
A. Construction of Center Avenue to City collector street
standards with asphalt, base course, curb, gutters, street
2
lighting , landscaping and sidewalks , beginning at its
intersection with Meadowlark Avenue southwest a distance of
approximately 2 , 220 lineal feet to its intersection with Shields
Street.
B. Construction of a portion of the west half of Meadowlark
Avenue to City collector street standards with asphalt, base
course, curb, gutters, street lighting and sidewalks, beginning
at its intersection with Center Avenue southeast, a distance of
approximately 1 , 070 lineal feet.
C. Construction of Worthington Avenue to City collector
street standards with asphalt, base course, curb, gutters , street
lighting and sidewalks , beginning at its intersection with Drake
Road, north to its intersection with Center Avenue, a distance of
approximately 1 , 166 lineal feet .
( 2) Water
Water improvements will consist of a water main distribution
system under Center and Worthington Avenues within the Everitt
property in the District and one-half of the water system
improvements along Meadowlark adjacent to the same property and
will also include necessary appurtenances thereto.
( 3 ) Storm Drainage
The storm drainage improvements will consist of a storm
drainage collection system under portions of Center Avenue
including a box culvert (3/4 of which will be assessed to Everitt
and 1/4 of which will be assessed to CSURF) .
(4 ) Sanitary Sewer
The sanitary sewer improvements will consist of a sewer main
collection system under Center and Worthington Avenues within the
Everitt property in the District and one-half of the sewer main
collection system improvements along Meadowlark adjacent to the
same property and will also include necessary appurtenances
thereto.
PHASE 2 IMPROVEMENTS
Shields Street Improvements - Phase 2
Phase 2 Shields Street improvements will consist of the
realignment, regrading, construction and installation of the east
half of Shields Street adjacent to Windtrail Condominiums P.U. D.
in the District to a width of thirty-five feet from flow-line to
flow-line and including asphalt , base course, curb, gutters,
street lighting , landscaping ( tree removal , tree planting ,
reseeding and irrigation) , a deceleration lane and detached
sidewalks five feet in width.
3
Interior Improvements - Seattle First National Bank and the
Federal Deposit Insurance Corporation ( "Seattle/FDIC" ) Property
Interior improvements to the property owned by
Seattle/FDIC in the District will consist of street, water , storm
drainage and sanitary sewer improvements as follows :
( 1 ) Streets
Street improvements will consist of construction of Stuart
Street improvements to collector street standards with asphalt,
base course, curb, gutters , landscaping, street lighting and
sidewalks in Windtrail Condominiums P.U.D. beginning from the
point at which it intersects with Shields Street then tapering to
a local street standard width at its intersection with Hobbit
Street, a total distance of approximately 1, 400 lineal feet.
( 2 ) Water
Water improvements will consist of approximately 2 , 100 feet
of 8 inch water main under Stuart Street to be improved within
the District and including necessary appurtenances thereto.
( 3 ) Storm Drainage
Storm drainage improvements will consist of the construction
of miscellaneous drainage structures and appurtenances , including
minor storm sewer systems, channels and various culverts ,
beginning approximately 180 feet east of Shields Street at its
intersection with Stuart Street, south to Spring Creek.
(4) Sanitary Sewer
Sanitary sewer improvements will consist of approximately
1 , 000 feet of 8 inch sanitary sewer main under Stuart Street to
be improved within the District and including manholes, plugs and
other necessary appurtenances thereto.
4