Loading...
HomeMy WebLinkAbout1994-068-04/19/1994-CHOICES 95 DIRECTOR OF ENGINEERING RIGHT TURN LANES SHIELDS STREET IMPROVEMENT RESOLUTION 94-68 ACCEPTING THE REPORT OF THE DIRECTOR OF ENGINEERING AND DIRECTING STAFF TO PROCEED WITH THE CHOICES 95 SHIELDS STREET IMPROVEMENT PROJECTS WHEREAS, in March 1989, the voters approved a 1/4 cent sales and use tax to fund the Choices 95 Capital Improvements Program, which program included a number of streets/transportation projects to improve traffic safety and provide for increase capacity of major streets and intersections; and WHEREAS, among the Choices 95 streets/transportation project were two projects along Shields Street: the Prospect/Shields Intersection, and Shields-- Laurel to Prospect; and WHEREAS, the public improvements to be constructed in conjunction with these Shields Street projects are consistent with the Transportation Master Plan Policies adopted by the Council ; and WHEREAS, the proposed improvements generally promote the use of alternative modes of transportation and enhance the safety of bicyclists and pedestrians along Shields Street; and WHEREAS, the Council believes that such purposes would be better served by eliminating the proposed right turn lanes on Shields Street at the intersections of Shields and Laurel , Elizabeth and Prospect streets; and WHEREAS, the construction of the public improvements associated with these Shields Street projects necessitates the removal of a number of trees along Shields Street; and WHEREAS, the City has worked with the Prospect/Shields Neighborhood Association, Colorado State University, other property owners along Shields Street, and representatives of RELEAF to preserve as many of the existing trees along Shields Street as possible, given the scope of the public improvements to be constructed; NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS that the report of the Director of Engineering concerning the foregoing projects, dated April 13, 1994, is hereby accepted, and City staff is directed to proceed with the construction of the Shields Street projects as outlined in that report; provided, however, that the right turn lanes proposed for construction at the intersections of Shields Street and Laurel , Elizabeth and Prospect streets be eliminated from the project as proposed. Passed and adopted at a regular meeting of City:£ouncil thi 19th day of April , A.D. 1994. ATTEST: yulbw- City Clerk