Loading...
HomeMy WebLinkAbout115 - 11/16/2010 - AMENDING CHAPTER 26 OF THE CITY CODE TO REVISE ELECTRIC DEVELOPMENT FEES AND CHARGES ORDINANCE NO. 115, 2010 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT COLLINS TO REVISE ELECTRIC DEVELOPMENT FEES AND CHARGES WHEREAS, the City Council is empowered and directed by Article XII, Section 6, of the City Charter to fix, establish, maintain and provide for the collection of such rates, fees or charges for utility services furnished by the City as will produce revenues sufficient to pay the costs, expenses and other obligations of the electric utility, as set forth therein; and WHEREAS, the City Council has determined that it is appropriate for new development to contribute its proportionate share of providing capital improvements; and WHEREAS, Section 26-471 of the City Code requires that the electric development fees be reviewed annually by the City Manager and that the fees be presented to the City Council for approval no less than biennially; and WHEREAS,on October 20,2009,the City Council adopted Ordinance No. 118,2009,which established the electric development fees now in effect; and WHEREAS,the City Manager and staff have recommended to the City Council a reduction in the electric development fees and charges for all invoices paid on or after January 1, 2011; and WHEREAS, on October 6, 2010, the Electric Board considered the Electric Utility's proposed 2011-2012 budget,as well as the 2011 monthly rate increases and the proposed reduction in 2011 development fees, and rejected a motion which would have recommended Council's approval of these items; and WHEREAS,the Board members' vote was based upon the following concerns: (1)that the energy efficiency budget,as proposed,should be revised so as to reduce the proposed 2011 monthly rate increase and; (2) that the 2011 budget does not provide the funding necessary to attract and retain quality, experienced Electric Utility employees; and WHEREAS, the City Council believes it is in the best interests of the Electric Utility rate payers to amend Chapter 26 of the City Code to revise the electric development fees and charges. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That Section 26-472(b) and (c) of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-472. Residential electric development fees and charges. (b) The ECF shall be the total of the site footage charge, dwelling charge and systems modification charge, to be determined as follows: (1) . The site footage charge shall be the combined total of: a. Four and nine hundred fifty-four thousandths cents ($0.04954) per square foot of developed site square footage, including all applicable tracts but excluding the area dedicated public rights-of-way; and b. Eight dollars and seventy-eight cents ($8.78) per lineal foot of the developed site abutting a dedicated street or roadway. (2) The dwelling unit charge shall be as follows: a. For a single-family panel size with one-hundred-fifty-amp service (nonelectric heat), one thousand two hundred eighty- five dollars ($1,285.) per dwelling unit; b. For a single-family panel size with two-hundred-amp service or with one-hundred-fifty-amp service (electric heat), two thousand one hundred seventy-six dollars ($2,176.) per dwelling unit; C. For a multi-family panel size with one-hundred-fifty-amp service (nonelectric heat), eight hundred fifty-six dollars ($856.) per dwelling unit; d. For a multi-family panel size with two-hundred-amp service or with one-hundred-fifty-amp service (electric heat), one thousand five hundred twenty-six dollars ($1,526.) per dwelling unit. (3) A system modifications charge will apply when a new or modified service will require infrastructure in addition to or different from the standard base electrical system model. The differential costs associated with such system modifications will be included in the calculated ECF. (c) A Building Site Charge("BSC") for any new or modified residential service shall be paid prior to issuance of a building permit for the related construction or modification. The BSC shall be based upon the current rates as of the time of issuance of the building permit. The BSC shall be the total of the secondary service charges, and any additional charges, determined as follows: (1) The secondary service charge shall be as follows: -2- Secondary Charge (up to 65 feet) Plus Per Foot Charge For Each Service Size Foot Over 65 1/0 service $639.00 $4.66/Foot 4/0 service $813.00 $5.83/Foot 350 kCM Service $830.00 $6.56/Foot 1/0 Mobile Home $499.00 N/A Service 4/0 Mobile Home $638.00 N/A Service (2) Actual special costs to the utility of installation of secondary service resulting from site conditions shall be included in the BSC as additional charges. Such conditions may include, but are not limited to, frozen or rocky soil, concrete cutting and asphalt replacement. Section 2. That Section 26-473 (b) and (c) of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-473. Nonresidential electric development fees and charges. (b) The ECF shall be the total of the site footage charge,kVA service charge and systems modification charge, to be determined as follows: (1) The site footage charge shall be the combined total of: a. Four and nine hundred fifty-four thousandths cents ($0.04954)per square foot of developed site square footage, including all applicable tracts but excluding the area of dedicated public rights-of-way; and b. Thirty-eight dollars and zero cents($38.00) per lineal foot of the developed site abutting a dedicated street or roadway. (2) The kVA service charge shall be determined as follows. a. For customer electric loads served by the utility the kVA service charge shall be: i. Utility owned transformers: The kVA service charge shall be fifty-nine dollars and six cents ($59.06) per kilovolt-amp (kVA) of service load rating. -3- ii. Customer owned transformers: The kVA service charge shall be forty-eight dollars and sixty-one cents ($48.61) per kilovolt-amp (kVA) of service load rating. b. For the utility to receive customer generation in excess of the customer's electric service provided by the utility, the following KVA service charge will also apply: i. Utility owned transformers: The kVA service charge shall be forty-eight dollars and sixty-four cents ($48.64) per , kilovolt-amp (kVA) of generation service rating in excess of the service load rating as paid per subparagraph (2)a.i. above. Such ratings shall be determined by the General Manager. ii. Customer owned transformers: The kVA service charge shall be thirty-eight dollars and nineteen cents ($38.19) per kilovolt-amp (kVA) of generation service rating in excess of the service load rating paid per subparagraph (2)a.ii.above. Such ratings shall be determined by the General Manager. (3) A system modifications charge will apply when a new or modified service will require infrastructure in addition to or different from the standard base electrical system model. The differential costs associated with such system modifications will be included in the calculated ECF. (c) A Building Site Charge ("BSC") for extending primary circuitry to the transformer for any new or modified nonresidential service shall be invoiced and paid in the same manner and at the same time as the ECF is invoiced and paid pursuant to Subsection(a) of this Section. The BSC shall be the total of the primary circuit charge,transformer installation charge and any additional charges,determined as follows: (1) The primary circuit charge for service from the utility source to the transformer shall be as follows: a. For single-phase service, a charge of eight dollars and seventy-six cents ($8.76) per foot of primary circuit; b. For three-phase service, a charge of eighteen dollars and forty-three cents ($18.43) per foot of primary circuit. -4- (2) The transformer installation charge shall be as follows: a. For single-phase service, a charge of one thousand three hundred eighteen dollars ($1,318.)per transformer; b. For three-phase service, a charge of two thousand four hundred twenty-one dollars ($2,421.)per transformer. (3) Actual special costs to the utility of installation of service resulting from site conditions shall be included in the BSC as additional charges. Such conditions may include,but are not limited to,frozen or rocky soil, concrete cutting and asphalt replacement. Section 3. That the amendments to Chapter 26 of the City Code contained herein shall go into effect for all invoices paid on or after January 1, 2011. Introduced, considered favorably on first reading, and ordered published this 2nd day of November, A.D. 2010, and to be presented for final passage on t 6th day of November, A.D. 2010. May r ATTEST: _ 1 'City Clerk Passed and adopted on final reading on the I6th day of ov ber, A.D. 2010. Mayo ATTEST: _ Chief Deputy City Clerk L -5-