Loading...
HomeMy WebLinkAbout016 - 04/04/1974 - AMENDING SECTIONS 112-41, 112-42, AND 112-43 OF THE CITY CODE RELATING TO OVERSIZED WATER LINES r � � v ORDINANCE NO 16, 1974 BEING AN ORDINANCE AMENDING SECTIONS 112-41, 112-42, AND 112-43 OF THE CODE OF THE CITY OF FORT COLLINS BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS Section 1 That Section 112-41 of the Code of the City of Fort Collins be, and the same hereby is, amended to read as follows "Section 112-41 Extension of water mains, payment of costs "A When water mains are extended, the property owners benefited thereby, as determined by the City, shall pay all of the costs of extending such mains insofar as such costs relate to the size main required to serve the property benefited In the event the City requires that such main be of a size larger than that necessary to serve the property for which the main is extended, the City water utility shall pay the additional costs incurred on such account "B The City Manager shall propagate rules and regulations setting forth the method of determining the portion of the cost of main extension to be borne by the City, which regulations shall be submitted to the City Council for approval " Section 2 That Section 112-42 of the Code of the City of Fort Collins be, and the same hereby is, amended to read as follows I "Section 112-42 Extension of water mains in subdivisions "All water mains required to serve a platted subdivision, including cross connecting mains shall be installed by the subdivider The subdivider shall install mains to the farthest point or points of his subdivision The City may participate in the cost of installing such mains as provided in Section 112-41 " Section 3 That Section 112-43 of the Code of the City of Fort Collins be, and the same hereby is, amended to read as follows "Section 112-43 Reimbursement of subdivider for water main extension "When a suodivider finds it necessary to bring water service fr„- the existing water system through vacant property to his platted subdivision, or to construct _ 4 J w lines on the perimeter of said subdivision the subdivider shall be responsible for the installation of all of such mains as shall be necessary and required by the City The size of the mains shall be determined by the City, and the City may participate in the cost of installing such mains in accordance with the provisions of Section 112-41 At the time of annexation, or as the property abutting said water main is developed and connections are made to the said water main, the City may collect a charge assessed in relation to the benefit to the affected property based upon the original construction cost, and if so collected, the City shall reimburse the original subdivider to the extent of the collection so made In no event shall the actual amount so paid to the subdivider by the City exceed the original cost to the subdivider of the excess extension It Introduced, considered favorably on first reading, and ordered published this 21st day of March, A D 1974, and to be presented for final passage on the 4th day of April, A D 1974 ATTEST Mayor City CNN- Passed and adopted on final reading this 4th day of April, A D 1974 ATTEST Mayor City Clerk -2-