Loading...
HomeMy WebLinkAbout023 - 03/15/1977 - ASSESSING THE COST OF IMPROVEMENTS IN STREET IMPROVEMENT DISTRICT NO 69 LEAP - ELIZABETH TO RIVERSIDE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 2 of 4 NAME AMID ADDRESS DESCRIPTION AM1XNT A4O NT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $10 3289 @ $ 9 3172 Rainey, Robert L Com 30 ft W & 167 8/12 ft S of NE cor of SE of $3,343 16 $3,015.70 $ 6,358 86 Virginia H NE 13-7-69, W 615 8/12 ft, S 311 2/12 ft, New Driveways + 877.61 700 Dawn Ave E 617 ft to cc rd, N 323 8/12 ft to POB, $ 7,236.47 Fort Collins, Colorado 80521 FTC. 97131-00-027 FRONTAGE IN FEET 323 67 D & E Investment Company Beg at pt 549 12 ft N & 30 ft W of SE oor $ 929 60 $ 838 55 $ 1,768 15 300 Vallejo of NE 13-7-69, th N 89 38' W 151 ft, S 0 New Driveway + 245 88 Denver, Colorado 80200 25' W 99 12 ft, N 89 38' W 479 ft, N 0 25' One sewer service stub + 190 00 97131-00-046 E 189 12 ft, S 89 38' E 630 ft, S 0 25' W FF Nn GE IN FEET 90 0 90 ft to beg, FTC $ 2,204 03 Nelbar, Inc Beg at pt 100 ft W of E 1/4 oor 13-7-69, th $ 619 73 $ 559 03 $ 1,178 76 1080 E Elizabeth W 110 ft, N 200 ft, E 180 ft, S 60 ft, W New Driveway + 266.13 Fort Collins, Colorado 80521 70 ft, S 140 ft to beg, FTC less Bk 1694 $ 1,444 89 97131-00-051 Pg 673 FROWAGE IN FEET 60 0 First National Bank Beg at 1/16th cor known as NE oor of SE of $1,494 18 $1,347 83 $ 2,842.01 ATTN• Trust Dept NE 13-7-69 wh bears N 0 25' E 1319 93 ft New Driveway + 665 54 205 W Oak from E 1/4 cor, th S 0 25' W 167 67 ft, N Fort Collins, Colorado 80521 89 38' W 238 ft, N 0 25' E 160 ft, S 89 38' One sewer service stub + 190 00 97131-00-005 E 67 ft, N 0 25' E 157 77 ft to swrly In $ 3,697.55 F%NTAGE IN FEET 144 66 Riverside Ave, S 48 2131' E 227 53 ft to beg, exc erly 30 ft co rd & less Bk 1109 Pg 307, FTC D & E Investment Company Com at a pt 30 ft W & 639 12 ft N of SE cor $1,926 86 $1,738 12 $ 3,664.98 300 Vallejo of NE 13-7-69, th W 630 ft, N 31 05 ft, E 14 New Driveway + 439.28 Denver, Colorado 80200 1/3 ft, N 168 ft to cen to ditch, th E 615 78 One water service stub + 145.00 97131-00-006 ft alg ditch to co rd, S 186 55 ft to POB, $ 4,249 26 FROt?WE IN FEET 186 55 FTC I I r � ORDINANCE NO 23 , 1977 BEING AN ORDINANCE ASSESSING THE COST OF IMPROVE- MENTS IN STREET IMPROVEMENT DISTRICT NO 69 AND PROVIDING FOR THE PAYMENT AND COLLECTION THEREOF WHEREAS, heretofore by appropriate ordinances and resolutions duly adopted by the Council of the City of Fort Collins, there was established Street Improvement District No 69 for the purpose of installing curb, gutter, sidewalk, asphalt pavement and street lighting on certain streets and alleys in the City of Fort Collins, Colorado, all pursuant to Chapter 16 of the Code of the City of Fort Collins, and WHEREAS, pursuant to said ordinances and resolutions, said improvements have been installed and accepted by the City of Fort Collins, Colorado, and WHEREAS, upon accepting said improvements, the City Council adopted the report of the City Engineer respecting the cost of such improvements and the schedule of assessments prepared by the City Engineer and ordered notice to be published as provided in Chapter 16 of the Code of the City of Fort Collins, which said notice was duly published as therein provided, and WHEREAS, March 1, 1977, is the date set for the hearing of complaints and objections and the determinations of the same and for acting upon an ordinance assessing the cost of such improvements, and WHEREAS, all complaints and objections in writing filed by property owners within the District have been considered by the City Council. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS t i r Section 1 That the total cost of the improvements in Street Improvement District No 69, including the cost of engineering, legal, publication, interest during construction and collection, to-wit $894 , 522 78, less the portion of said cost to be paid by the City of Fort Collins , to-wit 1�504 887 18 is hereby assessed upon the real estate in said District in accordance with the provisions of Chapter 16 of the Code of the City of Fort Collins, and the proportion of said costs assessed upon each lot or tract of land in said District shall be as follows -2- LEMAY - ELIZABETH TO RIVERSIDE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 4 NAME AND ADDRESS DESCRIPTION AM)UNT AMXNT 'TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUPTER @ $ 103289 @ $ 93172 Michaels, E P/Thanet S Considering the W In of NW 18-7-68 as $3,013 36 $2,718 20 $ 3,542 99, 1609 Mathews bearing N & S & with all bearings herein New Driveway + 453 45 Fort Collins, Colorado 80521 relative thereto com at pt 1250 2 ft N $ 3, 996 43 87182-00-037 & 30 ft E of W h oor of sd sec 18, th S FRONTAGE IN FEET 291 74 350 ft, th E 133 9 ft to pt wh is wrly 50 ft radially from C/L of spur track of UP RR entering the former Roundhouse bldg, th nwrly alg a cur to L rad of wh is 1549 ft, 50 ft from & para to C/L of sd spur track 368 ft M/L to POB, FTC Jesser, Frank H/Prancis B Can at pt N 750 20 ft fran W 34 cor 18-7-68, $1,549 32 $1,397 58 $ 2,946 90 823 E Elizabeth St th N 150 ft, E 163 90 ft, srly 8 23' E New Driveway + 374 58 Fort Collins, Colorado 80521 151 62 ft, W 186 01 ft to beg, FTC One sewer service stub + 190 00 87182-00-044 $ 3,511 48 FRONTAGE IN FEET 150 0 Poudre Stations, Inc Tr in SW 'h NW 4 of 18-7-68, beg at pt wh $1,652 62 $1,490 75 $ 3,143 37 Boat 495 is N 89 15' E 50 ft from SW cor of NW ke of Credit for 160 LF of VC & - 1,415 23 Fort Collins, Colorado 80521 sd sec 18, (sd pt being part of intsec of G & Walk 87182-00-064 E In of Lamy Ave & N In of Eliz St, FTC) $ 1,728 14 FRONTAGE IN FEET 160 0 th alg E In of Lamy Ave N 0 06' E 160 ft, N 89 15' E 150 ft, S 0 06' W 160 ft to N In of E11z St, th alg N In of E11z St, S 89 15' W 150 ft to POB, FTC R X Lands Tr in NW 4 of 18-7-68, beg at pt wh bears c% Ttmbleson, Bryce N 0 06' E 160 ft from W # cor of sd sec 18, $3,875 51 $3,495 91 $ 7,371 42 2604 Harvard Ave th N 0 06' E 590 21 ft alg sd W In of sd Fort Collins, Colorado 80521 NW ;4 th S 89 54' E 186 01 ft, S 08 17' E 87182-00-075 151 78 ft, S 89 54' E 101 08 ft, S 01 40' FRONTAGE IN FEET 375 21 57" W 295 70 ft, S 89 15' W 101 08 ft, S 0 06' W 140 ft, S 89 15' W 200 ft to POB less Sagebrush & less Lemay LTD 1st, FTC i ! U LEMAY - ELIZABEPH TO RIVERSIDE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 3 of 4 NAME AND ADDRESS DESCRIPTION ANDUNr AMOUNT TGTAL FOR FOR ASSESSMENT PAVEMENT N]T CURB AND GUITER @ $ 10 3289 @ $9.3172 Eggleston, Glenn/Marjorie Can 30 ft W & 450 ft N of SE cor of NE $1,023 80 $ 923 52 $ 1,947 32 907 State Street 13-7-69, W 151 ft, N 99 12 ft, E 151 ft, New Driveway + 222.77 Lamed, Kansas 67550 S 99 12 ft to beg, FTC One water service stub + 145 00 97131-00-007 One sewer service stub + 190 00 FRCNTAGE IN FEET 99 12 $ 2,505.09 Pope, Warren R/Alma Ruth Oan 350 ft N & 30 ft W of SE cor of NE $1,032 88 $ 931 72 $ 1,964.60 837 Lemay 13-7-69, rum W 630 ft, N 100 ft, E 630 New Driveways + 561.35 Fort Collins, Colorado 80521 ft, S to beg, FTC One sewer service stub + 190 00 97131-00-008 $ 2,715 95 FRONTAGE IN FEET 100 0 Harder, Paul F Can 30 ft W & 200 ft N of E 1/4 cor 13- $1,549 34 $1,397 58 $ 2,946 92 Conlon, Robert M 7-69, W 355 1/2 ft, N 150 ft, E 355 1/2 New Driveway + 213 46 1032 Luke Street ft, S 150 ft to beg, FTC One 6" sewer service stub + 190.00 Fort Collins, Colorado 80521 One 2" water service stub + 582 17 97131-00-009 $ 3,932 55 FF0NTAGE IN FEET 150 0 Randleman, Gertrude D Can at a pt 30 ft W of E 1/4 cor 13-7- $1,446 05 $1,304 41 $ 2,750 46 1090 E Elizabeth 69, th W 70 ft, N 140 ft, E 70 ft, S Credit for 140 LF of C & G - 1,238 33 Fort Collins, Colorado 80521 140 ft to beg, FTC & W 97131-00-010 One sewer service stub + 190 00 FRONTAGE IN FEET 140 0 $ 1,702 13 Crauningham, Wayne E Ict 1, Ikgey LTD 1st, FTC Hancock, William R $ 774 66 $ 698 79 $ 1,473 45 816 I may Ave Credit for 75 LF of ex C & - 663 39 Fort Collins, Colorado 80521 G & W 87182-11-001 Credit for streetlight payment- 37 73 FRONTAGE IN FEET 75 0 $ 772 33 I STREET 114PROVEMENT DISTRICT NO 69 ASSESSMENT ROLE IEI+A.Y - ELIZABEi'H TO RIVERSIDE Page 4 of 4 NAME AND ADDRESS DESCRIPTION AMOUNT ANDUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $10 3289 @ $ 9.3172 Frick & Frack, Inc Lot 1, Sagebrush, FTC $1,446 04 $1,304 41 $ 2,750 45 Hasler, T W Credit for streetlight payment- 70 43 Po Box 433 credit for 139 IF of C & G & W-1,229 48 Fort Collins, Colorado 80522 87182-06-001 $ 1,450 54 FRONTAGE IN FEET 140 0 Total Assessable $148, 518 26 City of Fort Collins Non-Collectable Assessments ••$ -0- Construction Cost $ 69 , 378 37 TOTAL COST OF STREET $117,896 63 I ' LEMAY - STUART M PROSPECT STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 3 NAME AND ADDRESS DESCRIPTION AMOUNT AMDUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $10 43668 @ $ 8 91418 Spring Creek Farms, Inc Beg at W 1/4 oor 19-7-68, th N 1348 4 $1,529 39 $1,306 28 $ 2,835.67 1744 Lemay ft to TPOB, th E 224 84 ft, th N O1 54' W Credit for 16 LF of walk - 73.38 Fort Collins, Colorado 80521 141 62 ft, th N 88 22' W 220 23 ft, th S not constructed $ 2,762.29 87190-00-014 A to POB, FTC F%2dIIGE IN FEET 146 54 nternatinnal Investment Beg at W 1/4 cor 19-7-68, th N 1348 4 ft, Perks, B & Waferration E 224 84 ft, N O1 54' W 141 62 ft, N 88 22' New Dr 58 $1,822 33 $ 3,870 91 Perkins, 2055 S Lxust #117 W 220 23 ft, N 202 99 ft, E 372 79 ft, S 56 New Driveways + 70 38 Denver, Colorado 80222 0' E 153 46 ft, S 295 ft, E 451 38 ft, th alg $ 4,826 29 87190-00-016 arc of 424 14 ft rad cur to R 233 18 ft lg FRONTAGE IN FEET 204 43 chord of wh bears S 74 15' E 230 26 ft, S 58 30' E 375 19 ft, th alg arc of 560 ft rad cur to L 302 96 ft, lg chord of wh bears S 73 59' E 299 29 ft, S 89 29' E 645 55 ft, S 87 31' E 164 95 ft, S 0 06' W 956 70 ft, S 89 49' W 2589 22 ft to POB International Investment Beg at NW cor 19-7-68, th N 89 41' E 1497 15 $6,278 50 $5,362 59 $ 11,641.09 c% Perkins, B & Waferration ft, S 0 18' E 90 ft, th alg arc of 400 ft rad New Driveway + 223 32 2055 S Iocust #117 cur to R 230 38 ft, lg chord of wh bears S $ 11,864 41 Denver, Colorado 80222 16 11' W 227 21 ft, S 32 41' W 68 61 ft, S 97190-00-016 87 10' W 182 25 ft, S 65 30' W 547 ft, S 56 ' R24TAGE IN FEET 601 58 0' W 273 ft, N 53 40' W 291 ft, S 69 30, W ' 274 ft N 670 ft to POB (90 3513 acres M/L) less Bk 1533 Pg 846 less Spring Creek Village, FvfC, less 1681-749 Urban Development & et al Lot 1, Spring Creek Village 2n3, F'iC $2,987 62 $2,551 95 $ 5,539 77 c/o Related Housing 405 Park Avenue New York, New York 10022 87192-07-001 F'RCNTAGE IN FEET 286 28 LEMAY - STUART TO PROSPECT STREET DIP%JVEMENT DISTRICT' NO 69 ASSESSN= ROLE Page 2 of 3 NAME AND ADDRESS DESCRIPTION AM= A4DUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $10.43668 @ $8 91418 Schrader, Wayne K E 118 65 ft of N 140 ft of Lot 5, E acres, $1,148 03 $ 980 56 $ 2,128 59 PO Box 495 FTC Credit for 110 IF of ex C - 972 97 Fort Collins, Colorado 80521 & G & W $ 1,155 62 97241-05-001 FRONTAGE IN FEET 110.0 Johnson, Duane K/Esther M Tr 6 less E 207 27 ft of N 78 ft, E acres, 1623 Lemay FIC $ew Dr 57 $1,399.53 $ 3,643 10 Fort Collins, Colorado 80521 New Driveways + 643 90 97241-06-006 $ 3,682 00 FRCNTAGE IN FEET 157 0 Laufer, David/Pauline The S 120 ft of E 207 3 ft of Lot 5, E acres, $1,252 41 $1,069 70 $ 2,322 11 1607 Lamy FTC Credit for ex C & G - 511 06 Fart Collins, Colorado 80521 New Driveway + 198 83 97241-06-016 FRONTAGE IN FEET 120 0 $ 2,009 88 Stephens, Vernon E Por of tr 7, E acres, FTC, beg at pt wh $ 923 12 $ 788 46 $ 1,711 58 Margie E bears S 495 ft & again N 89 59' W 30 ft, fran New Driveway + 171 39 621 E Iowa NE cor of sec 24 & th N 89 591 W 168 17 ft, Rapid City, South Dakota 57701 S 0 02' W 110 32 ft, N 82 09' E 169 83 ft, $ 1,882 97 97241-06-028 N 87 07 ft, to POB I7TAGE IN FEET 88 45 Jacobsen, Earl J/Sybel A E 207 27 ft of N 78 ft of tr 6, E acres, $ 814 06 $ 695 31 $ 1,509 37 Allen, Steven D FTC New Driveway + 303 45 1619 Lsmy $ 1,812 82 Fort Collins, Colorado 80521 ,97241-06-030 FRONTAGE IN FEET 78 0 J LEMY - STUART TO PROSPECT STREET INIPF2l7VEIIENT DISTRICT' NO 69 ASSESSMENT ROLE Page 3 of 3 NAME AND ADDRESS DESCRIPTION AMXNr A4YM TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $10 43668 @ $8 91418 Geriatrics, Inc Lot 1, Replat of Springmeadows on Spring $6,578 35 $5,618 70 $ 12,197 05 PO Boa 1448 fix, FTC Credit for streetlight payment- 317 11 Greeley, Colorado 80631 Credit for ex C & G & W -4,484 52 97241-15-001 $ 7,395 42 FPLNPAGE IN FEED 630 31 Hahn, Jack R/Donna L Lot 2, replat of Springmeadows on Spring $ 631 42 $ 539 31 $ 1,170 73 1639 Lenny Avenue Creek, FTC Fort Collins, Colorado 80521 97241-15-002 FROI7PAGE IN FEET 60 50 Total Assessable $ 44,102.20 City of Fort Collins Non-Collectable Assessments $ -0- Construction Costs $ 57, 749 98 TOTAL COST OF STREET ..$101,852 18 t a y LEMAY - DARfl4DLM TO STUART STREET IMP%JVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 1 NAME AND ADDRESS DESCRIPTION AM)UNT + AMWNT TI )TAL FOR MR ASSESSMENT PAVEMENT CURB AND GUTTER @ $ 12 56198 @ $4 71673 International Investment Beg at W 1/4 cor 19-7-68, th N 1348 4 ft, $10,971 63 $ 4,119.59 $ 15,091 22 Perkins, B & Wafferration E 224 84 ft, N O1 54' W 141 62 ft, N 88 2055 S Locust #117 22' W 220 23 ft, N 202 99 ft, E 372 79 ft, Denver, Colorado 80222 S 56 0' E 153 46 ft, S 295 ft, E 451 38 87190-00-016 ft, th alg arc of 424 14 ft rad cur to R FF NTACE IN FEET 873 4 233 18 ft lg chord of wh bears S 74 15' E 230 26 ft, S 58 30' E 375 19 ft, th alg arc of 560 ft rad cur to L 302 96 ft, lg chord of wh bears S 73 59' E 299 29 ft, S 89 29' E 645 55 ft, S 87 31' E 164 95 ft, S 0 06' W 956 70 ft, S 89 49' W 2589 22 ft to POB First Assembly of God Beg at pt N 873.40 ft & E 50 ft from W $ 5,087 60 $ 1,910 28 $ 6,997 88 Church 1/4 cor 19-7-68, th N 390 ft, th alg arc of Less credit for low valuation -1,997 88 525 W Oak a 15 ft rad cur to R 23 56 ft, the lg chord Fort Collins, Colorado 80521 wh bears N 45 0' E 21 21 ft, th E 425 ft, $ 51000 00 87190-00-019 th alg arc of a 15 ft rad cur to R 23 56 F%NTAGE IN FEET 405 0 ft, th lg chord wh bears S 45 0' E 21 21 ft, th S 115 ft, th alg arc of a 180 30 ft rad cur to R 97 55 ft, th lg chord wh bears S 15 30' W 96 37 ft, th S 31 0' W 308 ft, th N 59 0' W 158 96 ft, th W 134 36 ft to POB, FTC (cont 4 048 acres M/L) I I Total Assessable $ 20,091 22 City of Fort Collins Non-Collectable Assessments ... $ 1,997.88 Construction Costs $ 4,056.92 TOTAL COST OF STREET $ 26,146 02 I RIVERSIDE - MULBERRY TO LEMAY STREET 1MPR7VfT`ENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 1 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GOITER @ $10 67296 @ $8 91862 a S First National Bank Beg at 1/16th cor known as NE cor of SE of $ 368 54 $ 307.96 $ 676 50 AWN Trust Dept NE 13-7-69 wh bears N 0 25' E 1319 93 ft from 205 W Oak E 1/4 cor, th S 0 25' W 167 67 ft, N 89 38' W Fbrt Collins, Colorado 80521 238 ft, N 0 25' E 160 ft, S 89 38' E 67 ft, 97131-00-005 N 0 25' E 157 77 ft to swrly In Riverside Ave, FRONTAGE IN FEET 34 53 ft S 48 211�' E 227 53 ft to beg, exc erly 30 ft co rd & less Bk 1109 Pg 307, FTC Thmipson, Alfred D, Jr Tr in 13-7-69, beg at a pt wh bears S 0 25' W -0- $1,529.10 $ 1,529.10 Helen S 167 67 ft & again N 89 38' W 238 ft from 712 Oxford Lane 1/16th oor known as NE cor of SE of NE of sec Credit for existing C & G & W - 633 67 Fort Collins, Colorado 80521 13, wh sd 1/16th oor bears N 0 25' E 1319 93 New Driveways + 238 06 97131-00-045 ft from E 1/4 cor sec 13, N 89 38' W 405 77 FRONTAGE IN FEEL 17d. 45 ft ft, N 0 25' E 210 ft, S 89 42' E 331 40 ft, Credit for street light payment- 86 26 N 0 54' E 229 75 ft, S 48 21' 30" E 171 45 ft, $ 1,047.23 S 0 42' W 170 70 ft, N 89 44' 10" W 54 66 ft, S 0 25' W 156 ft to pob, FIC, Miller, James A/Irving Beg at NE oor of SE of NE 13-7-69 wh bears $1,453 55 $1,214 63 $ 2,668.18 2260 W Elizabeth N 0 25' E 1319 93 ft from E 1/4 cor sec 13, New Driveways + 752 68 Fort Collins, Colorado 80521 N 89 34' 20" W 171 ft N 0 25' E 170 70 ft to 97131-00-049 swrly In of Riverside Ave, S 48 21h' E 241 25 One sewer service stub + 190 00 1 FRMCAGE IN FEET 136 19 ft ft to beg, exc E 30 ft for co rd, FIC Credit for irregular lot -1,203 62 $ 2,407 24 Total Assessable $ 4,130.97 City of Fort Collins Non-Collectable Assessments .. $ 1,203 62 Construction Costs . . $ 31,167.87 iTOTAL COST OF STREET $ 36,502 46 I STREET IMPR[.WEMENT DISTRICT NO 69 ASSESSMENT ROLE RIVERSIDE - LEMAY TO PROSPECT Page 1 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GLITTER @ $9 66403 @ $9 17722 Betz, E R/Helen I Beg at pt on E In of Co Rd R/W wh pt bears $10, 843 81 $10, 297 58 $21, 141 39 Johnson, Don N 89 08' E 30 ft fran W 1/4 cor 18-7-68, th 290 Rossmoore Leisure Wld alg sd R/W In, N 900 20 ft, E 133 90 ft to Mesa, Arizona 85206 W In of R/W of UP spur track, th alg sd In 87182-00-035 S 08 23' E 303 33 ft, E 101 40 ft to E In of FRCNPAGE IN FEET sd R/W, th N 08 23' W 126 51 ft, E 615 77 ft W. side Riverside = 493.58' to swrly In of R/W of FTC branch of UP RR, E side Riverside = 528 50 th alg sd In S 61 42' E 1897 60 ft, S 0 03' E 431 54 ft, N 64 50' 30" W 1471.81 ft S 89 08' W 1215.92 ft to pob less 12 ft easement as in Bk 1105 Pg 395, less Betz 1st & less the fol Bks & Pgs 1044-147, 1401-827, 1418- 525, 1421-241, 1440-651 & 1442-336, FTC, also beg SW oor of NW 1/4 18-7-68, th N 150 ft, E 1245 92 ft, S 150 ft, W 1245 92 ft to beg less st, less Riverside 1st, 2nd, 3rd, & 5th & less the fol Bks & Pgs 1366-927, 1401-827, 1421-241, 1429-779, 1440-651, 1520-408, 1591- 221 & 1621-453, FTC Sandler, Lawrence/Samuel Beg at pt wh bears N 725 21 ft & again E $ 2,838.13 $ 2,695 17 $ 5,533 30 Box 2147 272 71 ft from W 1/4 oor of 18-7-68, th E Denver, Colorado 80201 79.77 ft, N 31 24' 30" E 228 83 ft to pt on New Driveways + 900 99 87182-00-036 swrly In of Riverside Ave, ext, th alg sd $ 6,434 29 FR7MT M IN FEET 293 68' swrly In on arc of 1171 ft rad cur to R 272 48 ft the lg chord of wh bears N 56 06' 30" W 271 88 ft, th alg sd swrly In N 49 26' 30" W 23 52 ft, S 83 49' W 7 72 ft, S 08 14' E 365 ft to pob (1 130 acres MA) , F1C i �� i STREET II-TFMEMENT DISTRICT NO 69 ASSESSMENT ROLE RIVERSIDE - LF2'Y�Y lU PROSPFF)✓TT Page 2 Of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AM)UDPT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $9 66403 @ $9 17722 Well, Donald B Beg at pt on S In of NW 18-7-68 wh bears $ 2,342 17 $ 2,224.19 $ 4,566 36 Wilmarth, Elery N 89 15' E 750 ft from W 1/4 cor, th N 0 06' PO Box 506 E 160 ft, N 89 15' E 431 56 ft to pt on wrly Fort Collins, Colorado 80521 side Riverside Ave, th alg sd wrly side on 87182-00-073 arc on a 676 62 ft rad cur to L, 17 27 ft lg FIgNTAGE IN FEET 242 36 chord of wh bears S 62 20' 52" E 17 27 ft, th alg wrly In of McHugh St S 26 51' 30" W 171.27 ft to on S In sd NW, S 89 15' W 369 76 ft to pob, FLC & also beg at pt on S In of NW 1/4 of 18-7-68 wh bears N 89 15' E 700 ft from W 1/4 cor of sd sec 18, th N 0 06' E 300 ft, N 89 15' E 304.54 ft to wrly side of Riverside Ave, th alg sd wrly side on arc of 676 62 ft rad cur to L 225 09 ft, lg chord of wh bears S 52 05' E 224 06 ft, S 89 15' W 431 56 ft, S 0 06' W 160 ft, S 89 15' W 50 ft to pob, FM less E Elizabeth & less the fol Bks & Pgs 1509-119, 1554-429, 1564-523 & 1658-498 Collins Cashway Lumber, Inc All Riverside 1st, FTC $ 3,480 40 $ 3,305 08 $ 6,785 48 1200 Riverside Credit for 360 14 LF of C,G,W -3,185 51 Fbrt Collins, Colorado 80521 Credit for Streetlight Payment- 181 19 87182-07-001 FRONTAGE IN FEET 360 14 $ 3,418 78 Fort Collins Newspapers, Inc Lots 1 thru 3, Riverside 2nd, FIC $ 5,571 60 $ 5,290 94 $ 10,862 54 PO Box 1577 Credit for 576 53 LF of C,G,W- 5,099 52 Fort Collins, Colorado 80522 87182-09-001 Credit for 1257 65 SY of FXNTACE IN FEET 576 53 2" asphalt & 7" base - 4,326 07 Credit for streetlight Payment- 290 05 $ 1,146 90 Page RIVERSIDE - LFI4a,Y TO PROSPECT STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Pa 3 of 8 NAME AND ADDRESS DESCRIPTION AMRINT AMANT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $9 66403 @ $9 17722 Fort Collins Glass & Paint Co Lot 1, Riverside 5th, FTC $ 1,014 72 $ 963.61 $ 1,978 33 139 Linden Fort Collins, Colorado 80521 New Driveways + 440 11 87182-13-001 $ 2,418.44 FRONTAGE IN FEET 105 00 Fart Collins Glass & Paint Co Lot 2, Riverside 5th, FTC $ 289.92 $ 275 32 $ 565.24 139 Linden Fort Collins, Colorado 80521 87182-13-002 FF4NTAGE IN FEET 30 00 Benedict Upholstery Lot 3, Riverside 5th, FTC $ 289 92 $ 275 32 $ 565 24 1320 Riverside Fort Collins, Colorado 80521 Credit for streetlight payment - 15 09 87182-13-003 $ 550 15 FRONTAGE IN FEET 30 00 Benedict Upholstery Lot 4, Riverside 5th, FTC $ 1,015 78 $ 964 62 $ 1,980 40 1320 Riverside New Driveways + 509 46 Fort Collins, Colorado 80521 Credit for streetlight payment - 52.88 87182-13-004 FRONTAGE IN FEET 105 11 $ 2,436 98 Betz, E R/Helen I All Riverside 3rd, FTC $14,242.27 $13,524 83 $ 27,767 10 Johnson, Don Credit for low valuation -18,800 44 290 Rossmoore Leisure Wld Mesa, Arizona 85206 $ 8,966 66 87183-15-001 FRONTAGE IN FEET 1473 74 i RIVERSIDE - LEMAY TO PROSPECT STREET II11PIbOVEMSr DISTRICT NO 69 ASSESSMENT ROLE Page 4 of 8 NAME AND ADDRESS DFSCRIPTICN AMOUNT AM(A]NT j TOM FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $ 9 66403 @ $ 9 17722 Stave-It Venture, LTD o m fran S 1/4 cor 18-7-68, th N 88 59' $ 2,066 75 $ 1,962 64 $ 4,029 39 PO Box 1481 04" E 1050 95 ft, th N 811 47 ft, th N Fort Collins, Colorado 80522 83 52' 40" E 10 06 ft to pob, th N 213 86 New Driveways + 747.50 87184-00-002 ft, th E 373 37 ft to W In of UP RR; th $ 4,776.89 FRONTAGE IN FEET 213.86 S 9 15' 30" E 173 52 ft, th S 83 52' 401; W 403 38 ft to pob Pc,--ze Plastics, Inc Beg at pt wh bears N 88 59' 40" E 1050 95 $ 1,364.47 $ 1,295 73 $ 2,660.20 1626 Riverside ft, N 0 03' 20" W 1026 39 ft from S 1/4 Fort Collins, Colorado 80521 cor 18-7-68, th N 0 03' 20" W 20.74 ft, th New Driveways + 425.37 87184-00-008 alg arc of 995 ft rad cur to L 119 26 ft $ 3,085.57 FRONTAGE IN FEET 141 19 the lg chord of wh bears N 03 29' 20" W 119 18 ft, N 83 04' 40" E 321 74 ft, S 16 i 03' 20" E 185 36 ft, S 89 56' 40" W 363.37 ft to pob, FTC. 4 Prospector Group, Inc Beg at pt N 0 03' 50" W 1202 47 ft fzun S $ 5,897 86 $ 5,600 77 $ 11,498.63 P 0 Box 280 1/4 cor 18-7-68, th N 0 03' 50" W 1002 15 Fort Collins, Colorado 80521 ft, S 63 21' 20" E 559 49 ft, th alg arc of ' 87184-00-010 995 ft cur to R 1038 30 ft, lg chord of wh bears FRONTAGE IN FEET 610 29 S 33 37' 40" E 991 84 ft, th S 89 56' 40" W 469 76 ft, N 73 59 ft, W 579 27 ft to pob, cunt 17 885 acres M/L less Prospect Est 3rd & less Eastgate 1st, F7C. -r RIVERSIDE - LEMAY ID PRDSPECP STREET DTR0VEMU DISTRICT NO 69 ASSESSMENT ROLE Page 5 of 8 NAME AND ADDRESS DESCRIPTION AMXW A147UPPr TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER _ @ $9 b6403 @ $9 17722 Fort Collins N O Nelson Co Tr in SE 1/4 18-7-68 beg at pt on early ln $ 2,367 49 $ 2,248 24 $ 4,615 73 PO Box 527 of Riverside Ave wh bears N 88 59' 40" E New Driveway +1,882 45 Fort Collins, Colorado 80522 1050.95 ft & again N 0 03' 20" W 1047 13 ft 87184-00-013 & again N 03 29' 20" W 119.18 ft & again N $ 6,498 18 FRMnMGE IN FEET 244 98 83 04' 40" E 10 ft frcm S 1/4 cor, th alg sd erly ln alg arc of 1005 ft rad cur to L 244 98 ft, th lg chord wh bears N 13 54' 20" W 244 98 ft; th N 70 49' 20" E 270 81 ft to pt on wrly R/W ln of UP RR, th alg wrly In alg arc of 1587 28 ft rad cur to R 315 89 ft, th lg chord wh bears S 24 52' 05" E 315 36 ft, th S 83 04' 40" W 332 11 ft to pob, FTC Prospector Group, Inc Tr 'A' & 'B' , Eastgate 1st, FTC $ 6,830 44 $ 6,486 37 $ 13,316 81 PO Box 280 Fort Collins, Colorado 80521 87184-07-001 FR27MM IN FEET Tract "A" = 687.28 Tract "B" = 19 51 Public Service Cc of Tr in SE 1/4 18-7-68, County of Iaruner, wh $ 7,354 24 $ 6,983 77 $ 14,338 01 Colorado considering S In of sd SE 1/4 as N 88 59' 40" E Credit for existing C,G,W & - 2,498 53 209 S Meldrnm and all bearings relative thereto, is contained Drive Fort Collins, Colorado 80521 within lines wh begin at pt wh bears N 88 59' 87184-00-006 40" E 1050 95 ft from SW cor of sd SE 1/4 and New Driveways + 1,098 71 FRC DYM IN FEET 760 99 th N 88 59' 40" E 420 06 ft to pt on wesrly ROW Credit for 746 01 Sy of 2" - 2,566 13 ]n of the UP RR, th N 0 03'20" W 680 43 ft along asphalt & 7" base sd wesrly ROW ln, th alg the arc of a 1587 28 ft $ 10,372 06 radius curve to L 168 07 ft, the ing chord bears N 03 05' 20" W 167 99 ft alg sd wesrly ROW ln, th S 83 52' 40" W 420 00 ft, th alg the arc of 3-167 28 ft rad curve to R 123 60 ft, the long chord bears S 03 05' 20" E 123 54 ft, th S 0 03' 20" E 687 39 ft to pt of begin, Can 8 0008 acres, M/L & sub to RW Co Rd on southerly 30 ft I STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE RIVERSIDE - LEMAY TO PROSPECT STREET 6 of 8 � y NAME AND ADDRESS DESCRIPTION AMOUNT A 4OLM TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND A GUI= $9 66403 @ $9 17722 Collins Cashway Lurber Co All of Riverside 6th subd $ 1,450 19 $ 1,377 13 $ 2,827.32 1200 Riverside Ave Fort Collins, Colorado 80521 New Driveways + 268.88 87182-14-001 $ 3,096.20 F%NTAGE IN FEET 150 06 Homoka, Gene/E Charlene lot 1, Riverside 4th subd $ 972 01 $ 923 04 $ 1,895.05 1400 longs Peak Dr Credit for 100 58' of C,G,W - 889.65 Fbrt Collins, Colorado 80521 Credit for streetlight payment- 50.60 87182-12-001 F%NTAGE IN FEET 100 58 $ 954.80 United Bank of Fort Collins Lot 2, Riverside 4th subd 401 S College Ave $ 2,187 55 $ 2,077 36 $ 4,264 91 Fort Collins, Colorado 80521 87182-12-002 FFCNTAGE IN FEED 226 36 Tleledyne Industries Inc lot 1, Teledyne Aqua Tec Subd 1730 E Prospect $10,462 10 $ 9,935 07 $ 20,397 17 Fort Collins, Colorado 80521 Credit for ex drives - 835 18 87184-00-007 New Drives + 939 88 FRCNCTTACE IN FEET 1,082 58 Credit for 909 23 SY of 2" - 3,127 57 asphalt & 7" Base Riverside Ltd Lot 1-4, Riverside 7th Subd Credit for 419 52 IF of C & G- 1,786 65 Bob Martin $ 15,587.65 C Rhoades, Inc $ 1,183 65 $ 1,124 03 $ 2,307.68 Oak & Howes Savings Bldg Fort Collins, Colorado 80521 87184-09-001 thru 004 F NTAGE IN FEED 122 48 I i RIVERSIDE - LEMAY TO PROSPECT STREET INIPROVEVENT DISTRICT NO. 69 ASSESSMENT ROLE Page 7 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT 'DOTAL FOR FOR ASSESSMENT TT PAVEMENT CURB AND GUrrER @ $ 9 66403 @ $ 9 17722 Sessions, H Ted & Lot 5-10, Riverside 7th Subd. $ 1,775.86 $ 1,686 41 $ 3,462.27 Rice, Edgar Jr. 420 Irish Dr Fort Collins, Colorado 80521 87184-09-005 thri 010 Fr"WAGE IN FEET 183 76 Wright, Willard Lots 11-12, Riverside 7th Subd. $ 1,679 71 $ 1,595 09 $ 3,274.80 326 Walnut Fort Collins, Colorado 80521 87184-09-011 & 012 FRONTAGE IN FEET 173 81 Billeter, Dwight & Jean Lot 13, Riverside 7th Subd. $ 839.90 $ 797 59 $ 1,637 49 154 Crestmore P1 Drive relocation + 65 99 Fort Collins, Colorado 80521 New Driveway + 418.21 87184-09-013 $ 2,121.69 ET40WAGE IN FEET 86 91 Murphy, Richard J, Lot 14, Riverside 7th Subd. $ 1,213 51 $ 1,152.38 $ 2,365 89 Ray, Keith W & Michaels, Judy Meyer 7 i Lake Street F�_c Collins, Colorado 80521 87184-09-014 FRONTAGE IN F= 125.57 Chapwan, Laurimere W. & Lots 15-24, Riverside 7th Subd. $ 3,021 94 $ 2,869 72 $ 5,891.66 Chapman, Katherine D. 1909 Yorktown Fort Collins, Colorado 80521 87184-09-015 thru �� 70 EMUAGE IN FEET -- - RIVERSIDE - LEMAY TO PROSPECT STREET IMPFCVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 8 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMMYNT TOTAL EDR FOR ASSESSMENT PAVEMENT CURB AND GLITTER @ $9 66403 @ $9 17722 Murphy, Harry J Lots 25-30, Riverside 7th Subd $ 1,813 17 $ 1,721 83 $ 3,535 00 P O Box 280 Windsor, Colorado 87184-09-025 thru 030 FRiNTAGE IN FEET 187 62 Murphy, J.D Lots 31-34, Riverside 7th Subd $ 1,205 30 $ 1,144 58 $ 2,349 88 P.O. Box 280 Windsor, Colorado 87184-09-031 thru 034 FI%NTACE IN EEEL' 124 72 t 14 Investment Group All of Peverley's Riverside Subd $ 1,063 04 $ 1,009 50 $ 2,072.54 Mr Lee H Cooper New Driveway + 407 45 3706 Gull Way $ 2,479 99 Fort Collins, Colorado 80521 87183-16-001 F%NTAGE IN FEET 110 00 - - - Total Assessable $15 , 288 751 City of Fort Collins Non-Collectable Assessments .$ 18,800.44 Construction Costs $11 3 14-9 36 TOTAL COST OF STREET $284,835.55 i PROSPECT - LEMAY TO TDv=INE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 8 NAME AND ADDRESS DFSCRIPTION AMXNT AMOUNT TOTAL FOR FUR ASSESSMENT PAVEMENT CURB AND GUTTER ; @ $13 55499 @ $9 67861 Highlander Hts, Inc W 60 acres of S T of SW 18-7-68, less 2 41 $12,267 82 $ 8,759 53 $ 21,027 35 1404 Pitkin acre co rd, less bk 1065 pg 465, 1120-265, Credit for streetlight payment- 455 33 Fort Collins, Colorado 80521 1173-81, 1267-282 & less Highlander Hts llth 87183-00-001 & 12th, FX $ 20,572 02 FR(NTT.GE IN F1;ET 905 04 Ctevrcn Oil Company Beg at SW cor of 18-7-68, th N 0 0' E 160 $1,625 25 $ 1,160 47 $ 2,785.72 Property Tax & Insurance ft, N 89 42' 45" E para to S In of sd SW Credit for 119 9 IF of VC & - 1,060.54 PO Box 599 40 ft to E R/W In of Lemay St, the TPOB, th G & Walk Denver, Colorado 80201 N 89 42' 45" E 120 ft, S 0 0' W 120 ft to N $ 1,725.18 87183-00-002 R/W In of Prospect St, th S 89 42' 45" W FFaUAGE IN FEET 119 90 alg sd R/W In of Prospect St 99 90 ft, th alg arc of 20 ft rad cur to R lg chord of wh bears N 45 08' 40" W 28 36 ft, N 0 0' E 99 90 ft alg E R/W In of Lemay St to TPOB, Fort Collins Him, George L/Ooris K Lot 224, Highlander Hts llth, FTC $ 14459.47 $ 1,042 10 $ 2,501 57 1315 Kirkwood Credit for 107 67 LF of VC & - 952 36 Fort Collins, Colorado 80521 G & Walk 87183-05-224 Credit for streetlight payment- 54 17 FRONTAGE IN FEET 107 67 $ 1,495 04 Peak Land Investment, Inc Lot 237, Highlander Hts llth, FTC $ 1,457 17 $ 1,040 45 $ 2,497 62 5545 S Clarkson Credit for 107 5 IF of VC & - 950 86 Littleton, Colorado 80110 G & Walk 87183-05-237 Credit for streetlight payment- 54 08 FFtN1RkGE IN FEET 107 50 $ 1,492 68 Mcomb, Thomas M/Nancy D Lot 1, Prospect Est, FIC 1513 E Lake $ 2,373 89 $ 1,695 02 $ 4,068 91 Fbrt Collins, Colorado 80521 Credit to be paid by City - 4,068 91 87183-06-001 $ -0- FFYNTAGE IN FEET 175 13 PAOSPE7CT - LE MAY TO TIMBEIU= STREET IMPFME!,1ENT DISTRICT NO 69 ASSESSMENT ROLE Page 2 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR MR ASSESSI= PAVEMENT CURB AND GUTTER @ $ 13 55499 @ $9.67861 Weixelman, Donald B Lot 2, Prospect Est, FwIC Diane G $2,372 13 $1,693.76 $ 4,065 89 1509 E Lake St Credit to be paid by City - 4,065 89 $ Fort Collins, Colorado 80521 -0 87183-06-002 FRCNTAGE IN FEET 175 00 Maciel, Gary E/Maxane I Lot 3, Prospect Est, FIC 1501 E Lake St $2,372 13 $1,693 76 $ 4,065 89 Fort Collins, Colorado 80521 Credit to be paid by City $- 4,065 89 $ -0 87183-06-003 FRONTAGE IN FEET 175 00 Peak Land Investment, Inc Lot 238, Highlander Hts 12th, FTC 5545 S Clarkson $1,518 17 $1,084.00 $ 2,602 17 Littleton, Colorado 80110 Credit for streetlight payment- 56 35 87183-13-238 $ 2,545 82 FRONTAGE IN FEET 112 00 Peak Land Investment, Inc Lot 245, Highlander Hts 12th, FIC 5545 S Clarkson $1,491 06 $1,064 65 $ 2,555 71 Littleton, Colorado 80110 Credit for streetlight payment- 55 34 87183-13-245 $ 2,500 37 FRXUAGE IN FEED 110 00 r Peak Land Investment, Inc Lot 246, Highlander Hts 12th, FTC $1,565.61 $1,117 88 $ 2,683 49 5545 S Clarkson Littleton, Colorado 80110 Credit for streetlight payment- 25.38 87183-13-246 $ 2,625. FROWAGE IN FEET 115 50 I I PROSPECT - LEMAY TO TIMBERLINE STREET IIvIPFOVEMELN T DISTRICT' NO 69 ASSESSMENT ROLE Page 3 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR EK)R ASSFSS'4EPT PAVEMENT CURB AND GUTTER @ $13 55499 @ $9 67861 v Peak Land Investment, Inc Lot 253, Highlander Hts 12th, FTC 5545 S Clarkson $1,558.83 $1,113 04 $ 2,671 87 Littleton, Colorado 80110 Credit for streetlight payment - 57 86 87183-13-253 FRONTAGE IN FEET 115 00 $ 2,614 O1 Deuces, Maurice L Tr in N k of 19-7-68, beg at N 4 cor of sd $6,029 54 $4,305 24 $ 10,334 78 PO Box 1986 sec 19, th N 88 59 40 E & alg N In of NE Fort Collins, Colorado 80522 4 of sd sec 19, 1321 73 ft to W R/W In of New Driveway + 264 69 87190-00-011 UP RR, th S 0 03' 20" E & alg sd W RM ln, FRONTAGE IN FEET 444 82 413 24 ft, S 74 36' 40" W 790 81 ft, N 79 $ 10,599 47 16' 50" W 255.79 ft, N 86 32' 20" W 578 58 ft, N 55 54' 50" W 639 03 ft, N 0 18' 20" W 155 ft to N In of NW 4 of sd sec 19, th N 89 41' 40" E & alg N In of NW 4 of sd sec 19, 799 46 ft to POB, exc beg at pt. on N In of NE 4 19-7-68 wh bears N 88 59' 40" E 1321 73 ft fmm N 34 cor of sec 19, th S 88 59' 40" W 310 78 ft , S 0 03' 20" E 493 29 ft, N 74 36' 40" E 322 21 ft to W R/W In of UP RR, th N 0 03' 20" W alg sd " 413 24 ft to POB, less Edora Acres 1st, ETC Goble, Martin J Beg at pt on N In of NE h 19-7-68 wh bears $4,212 63 $3,007 92 $ 7,220.55 2410 Hawthorne N 88 59' 40" E 1321 73 ft from N � oor of Boulder, Colorado 80302 sec 19, th S 88 59' 40" W 310 78 ft, S 0 03' ` Driveway + 272 43 87190-00-012 20" E 493.29 ft, N 74 36' 40" E 322 21 ft to $ 7,492 98 FRONTAGE IN FEET 310 78 W R/W In of UP RR, th N 0 03' 20" W alg sd FVW 413.24 ft to POB, FTC Sutherland Lumber Co Imes only on Lot 1, Union Pacific Sub #1, FTC $2,304 77 $1,645 65 $ 3,950 42 Attn Ray Borden Credit for streetlight payment - 85 54 4000 Main Credit for 170 03 IF of VC & -1,503 95 Kansas City, Missouri 64111 G & Walk 87191-07-004 $ 2,360 93 FRONTAGE IN FEET 170 03 PROSPECT - LEMAY TO TIMBERLINE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 4 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR MR ASSESSMENT PAVEMENT CURB AND GUTTER @ $13 55499 @ $9 67861 International Investment Beg at NW oor 19-7-68, th N 89 41' E Perkins, B & Waferration 1497,15 ft, S 0 18' E 90 ft, th alg arc $19,209 46 $13,716 05 $ 32,925 51 2055 S Locust #117 of 400 ft rad cur to R 230 38 ft, lg Credit for 1417 15 LF of Denver, Colorado 80222 chord of wh bears S 16 11' W 227 21 ft, walk not constructed $- 6,499 62 87190-00-016 S 32 41' W 68 61 ft, S 87 10' W 182 25 $ 26,425.89 FRONTAGE IN FEET 1417 15 ft, S 65 30' W 547 ft, S 56 0' W 273 ft, = N 53 40' W 291 ft, S 69 30' W 274 ft N 670 ft to POB (90 3513 acres M/L) less bk 1533 pg 846 less Spring Creek Village, ETC less 1681-749 Sutherland Lumber Co InpS only on Lot 3, Union Pacific Sub c/o Ray Borden #1, FTC $ 1,959 25 $ 1,398 95 $ 3,358 20 4000 Main Credit for 144 54 LF of Vc & - 1,278 49 Kansas City, Missouri 64111 G & Walk 87191-07-005 Credit for streetlight payment- 72 72 FRONTAGE IN FEET' 144 54 $ 2,006 Widener, Leland D/Amah D Lot 24 & N 7 ft of lot 23 Blk 1, Edora $ 1;491.06 $ 1,064 65 $ 2,555 71 305 Kuxra Place Acres lst Credit for 110 0 IF of VC & - 972.97 Boulder, Colorado 80302 G & Walk 87191-05-024 Credit for streetlight payment- 55 34 FR%TM IN FEET 110 00 $ 1,527 40 Werner, Otto/Jeanette J Lot 1, blk 2, Edora Acres 1st 1601 Edora Road $ 1,491 06 $ 1,064 65 $ 2,555 71 Fort Collins, Colorado 80521 Credit for streetlight payment- 55.34 87191-06-001 Credit for 110 0 LF of VC & - 972 97 PRONTA[E IN FEET 110 00 C & Walk $ 1,527 40 STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE PROSPECr - LEMAY TO TIMBERLINE Page 5 of 8 NAME AND ADDRESS DESCRIPTION AMXW AMaM TCTTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $13 55499 @ $9 67861 Deuces Hone Inc Lot 7, blk 2, Edora Acres lst 517 W Drake Road $1,965 48 $1,403 40 $ 3,368.88 517 Drake, Colorado 80521 Credit for streetlight payment- 72 95 For87191-06-0n7 Credit for low valuation -1,845 93 FRONTAGE IN FEET 145 00 $ 1,450 00 Santini, Victor H Lot 8, blk 2, Elora Acres 1st, FTC $1,965 76 $1,403 59 $ 3,369 35 �Margaret H 1413 W Iake Credit for streetlight payment- 72 96 Fbrt Collins, Colorado 80521 $ 3,296 39 87191-06-008 FRONTAGE IN FEET 145 02 Hebbeln, James E Lot 1, blk 1, Edora Acres lst $2,033 26 $1,451 79 $ 3,485 05 1900 Mohawk Credit for streetlight payment - 75 47 Fbrt Collins, Colorado 80521 $ 3,409 58 87192-05-001 FRONTAGE IN FEET 150 00 Goble, Martin J Lot 3, partial replat of Flora Acres, $2,204 46 $1,574 03 $ 3,778 49 2410 Hawthorn 1st Credit for low valuation - 3,045 16 Boulder, Colorado 80302 87192-08-003 $ 733 33 FRONTAGE IN FEET 162 63 Goble, Martin J Lot 4, partial replat of Edora Acres, $1,756 87 $1,254 45 $ 3,011 32 2410 Hawthorn 1st Credit for low valuation $ -2,277 99 Boulder, Colorado 80302 $ 733 33 87192-08-004 FRONTAGE IN FEET 129 61 I I l '� PROSPECT - LEMAY TO TINIDER1,NE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 6 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $ 13.55499 @ $ 9 67861 Goble, Martin J Lot 6, partial replat of Edora Acres, $1,125 07 $ 803 33 $ 1,928 40 2410 Hawthorn 1st Credit for low vaulation -1,195 07 Boulder, Colorado 80302 $ 733.33 87192-08-006 FF42UAGE IN FEET 83 00 Goble, Martin J Lot 7, partial replat of Flora Acres, $2,452 92 $1,751 44 $ 4,204 36 2410 Hawthorn 1st Credit for low valuation - 3,471 03 Boulder, Colorado 80302 87192-08-007 $ 733.33 FRONTAGE IN FEET 180 96 Public Service Co of Tr in SE 14 18-7-68, County of Larim;;F, wh $5,693 92 $4,065 60 $ 9,759 52 Colorado considering S In of sd SE h as N 88 59' 40" E 209 S Meldnmm and all bearings relative thereto, is contained Fort Collins, Colorado 80521 within lines wh begin at pt wh bears N 88 59' 87184-00-006 40" E 1050 95 ft from SW cor of sd SE 4 and FICNTAGE IN FEET 420.06 th N 88 59' 40" E 420 06 ft to pt on wesrly ROW In of the UP RR, th N 0 03' 20" W 680 43 ft along sd wesrly ROW ln, th alg the arc of a 1587 28 ft radius curve to L 168 07 ft, th ing chord bears N 03 05' 20" W 167 99 ft alg sd wesrly ROW ln, th S 83 52' 40" W 420 00 ft, th alg the arc of 1167 28 ft rad curve to R 123 60 ft, the long chord bears S 03 05' 20" E 123 54 ft, th S 0 03' 20" E 687 39 ft to pt of begin, con 8 0008 acmes, M/L & sub to RW Co R3 on southerly 30 ft Teledyne Industries Inc Lot 1, Teledyne Aqua Tec Subd 1730 E Prospect $5,122 31 $3,657 45 $ 8,779 76 Fort Collins, Colorado 80521 Credit for ex C & G & W -1,714 85 87184-00-007 $ 7,064 91 FAC MACE IN FEET 377 89 PfIOSPDCP - LEMAY TO TIMBERLINE STREET TMPROVIIAEN'r DISTRICT NO 69 ASSESSMENT RDLE Page 7 of 8 NAME AND ADDRESS DESCRIPTION AM INT AM= TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUTTER @ $13.55499 @ $9 67861 Union Pacific Railroad Lot 2, Union Pacific Subd No 1 $1,158 83 $ 827 42 $ 1,986 25 K W Teague Credit for 85 49 LF of VC & - 756 18 1416 Dodge Street G & Walk Qnaha, Nebraska 68102 Credit for streetlight payment- 43 01 87191-07-003 FRCNTACZ IN FEET 85 49 $ 1,187 06 City of Fort Collins Substation 300 as described in Rk 1552, $10,306 55 $7,359.13 $ 17,665 68 300 LaPorte Ave Page 62-64, Larimer County Clerk, Colo Credit for 45 48 LF of C & - 402 27 Fort Collins, Colorado 80521 G & Walk not built 87190-00-017 Credit for 95 17 SY of 2" - 337 38 FRCNTAGE IN FEET 760 35 asphalt & 7'h" base not bui t $ 16,926 03 or u to ?x �f - 68 o Ci o 1 N f as 8 2 3 all %21 1,`Q36"7ue s t1 e1 or o 0 1 19, th 8 21 34 W 3 8 1 o VC87 9 - -0 t, 0 0 03" 0 ft th 2 ' & t - 8 IN 07 3 " 0 ft to N 9 $ 6 34 1 8 t, th g f a 1 to a ord s S 9 0 5 6 S 1 ' 3 W 15 5 f o a 14 4 rad R cho N 2 55" 9 B City of Fort Collins Edora Park as described in Bk 1382, Pg 158, 300 LaPorte Avenue Larimer County Clerk, Colorado $3,354 87 $2,395 46 $ 5,750 33 Fort Collins, Colorado 80521 87190-00-009 FRONTAGE IN FEET 247 50 t I I I J PRfSPDCT - LEMAY TO TUEERLINE STREET IIMPROVEPgNT DISTRICT NO 69 ASSESSMENT ROLE Page 8 of 8 NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL FOR FOR ASSESSMENT PAVEMENT CURB AND GUrIER @ $13 55499 @ $9 67861 Cienfuegos, Shirley E Lot 30, Prospect Estates, 2nd Filing $2,031 63 $1,450 63 $ 3,482.26 437 N Roosevelt Credit to be paid by City - 3,482 26 Fort Collins, Colorado 80521 $ 87184-05-030 FIUNTAGE IN FEET 149 88 Crabtree, Loreu W Lot 31, Prospect Estates, 3rd Filing $1,626 61 $1,161 43 $ 2,788.04 1609 E Lake Credit to be paid by City - 2,788 04 Fort Collins, Colroado 80521 87184-06-031 $ -0- F104TAGE IN FEET 120 00 Allison, Austin W/Rhoda G Lot 39, Prospect Estates, 3rd Filing. $1,558 83 $1,113 04 $ 2,671 87 1613 E Lake Credit to be paid by City - 2,671.87 Fort Collins, Colorado 80521 $ -0- 87184-06-039 FR(NTAGE IN FEET 115 00 Pool, Marlon B/Sylvia F Lot 40, Prospect Estates, 3rd Filing 1448 Pikes Peak $2,506 87 $1,789 96 $ 4,296 83 Fort Collins, Colorado 80521 Credit to be paid by City -4,296 83 87184-06-040 $ -0- FRONTAGE IN FEET 184 94 Total Assessable $139 , 288 701 City of Fort Collins Non-Collectable Assessments (Excluding City Property) $ 37,274 87 Construction Costs . . . $126 . 143. 08 1 TOTAL COST OF STREET $302,706 65 ,l R assessments herein provided for shall Section 2. All asse be due and payable within thirty (30) days after the final publication of this ordinance, without demand, provided that all such assessments may, at the election of the owners of the property assessed, be paid in ten (10) equal installments, the first installment being due on the first day of May, 1977 , and on the first day of May of each year thereafter until the full amount thereof has been paid, together with interest on the unpaid principal at the rate of six percent (6%) per annum, said interest to be payable at the time of the principal payments Failure to pay the whole of such assessment within thirty (30) days as aforesaid shall be conclusively considered and held as an election on the part of the persons interested, whether under disability or otherwise, to pay in such installments. Section 3. In the case of election of any person to pay in installments as aforesaid, the failure to pay any installment when due, whether on principal or interest, shall cause the whole of the unpaid principal to become due and payable immediately and the whole amount of unpaid prin- cipal and accrued interest shall thereafter draw interest at the rate of one percent (1%) per month until the date of sale as hereinafter provided, provided, however, that at any time prior to the date of sale, the owner of the property assessed may pay the amount of all unpaid and due install- ments, together with all interest that has accrued as afore- said, and all penalties accrued, and upon such payment shall be restored to the right to pay the installments in the same manner as if the default had not occurred The owners of any property not in default as to any installments or payments may at any time pay the entire unpaid balance of principal, together with interest accrued thereon, to the first day of the month following such payment Section 4 Payments may be made to the Director of Finance at any time within thirty (30) days after the final publication of this ordinance and in such event an allowance -3- of five percent (5%) as a discount shall be made on all payments during such period only. Section 5. In case of the default in the payment of any installment of principal or interest when due, all property concerning which such default is suffered shall be advertised by the County Treasurer and sold for the payment of the entire unpaid assessment thereon at the same time or times and in the same manner under all the same conditions and penalties and with the same effect as provided by law for the sale of real estate in default of the payment of general taxes, all as provided by Chapter 16 of the Code of the City of Fort Collins. Section 6. The Director of Finance shall prepare the foregoing assessment roll in proper form as provided in Chapter 16 of the Code of the City of Fort Collins, and shall keep a record of all payments made during the thirty- day period after the final publication of this ordinance and upon the expiration of said thirty-day period, he shall deliver said assessment roll to the County Treasurer of Larimer County with his warrant for collection of the same, all as provided in Chapter 16 of the Code of the City of Fort Collins. Section 7 All collections made by the County Treasurer on said assessment roll in any calendar month shall be accounted for and paid over to the Director of Finance on the first day of each and every month with separate statements for all such collections for each month in the same manner as general taxes are paid by the County Treasurer to the City. Section 8 The owner of any divided or undivided interest may pay his share of any assessment upon producing evidence of the extent of his interests satisfactory to the officers having the roll in their charge. -4- i i f i Section 9. If any property owner eligible therefor is , granted a deferment from the assessments made by this ordin- ance pursuant to the provisions of Ordinance No. 106, 1973, then the 1}en created on such owner' s property by this ordinance shall remain in full force and effect, but the same shall not be due or payable until the deferment granted pursuant to Ordinance No 106, 1973 has expired. Introduced, considered favorably on first reading, and ordered published this 1st day of March, A D 1977, and to ` be presented for final passage on the 15th day of March, A.D 1977. ayor ATTEST- City Clerk Passed and adopted on final reading this 15th day of March, A D 1977 OXII Mayor , A ES City Clerk -5-