Loading...
HomeMy WebLinkAbout077 - 07/21/2009 - AMENDING CHAPTER 26, ARTICLE VI, DIVISION 4 OF THE CITY CODE RELATING TO EXCESS CIRCUIT CHARGE ORDINANCE NO. 077, 2009 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 26, ARTICLE VI, DIVISION 4 OF THE CODE OF THE CITY OF FORT COLLINS RELATING TO EXCESS CIRCUIT CHARGE WHEREAS,the City's electric utility has large commercial and industrial customers that are interested in obtaining immediate backup service in the event electric service to a customer facility is disrupted; and WHEREAS, the City's electric utility is able to provide uninterruptible and immediate backup service to its large commercial and industrial customers at a rate that accounts for the increased electric utility operations,maintenance,and infrastructure costs associated with providing such service; and WHEREAS, staff has proposed revisions to the City Code in order to clarify the terms, conditions and rates for this service. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That Section 26-467 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-467. General service 50, schedule GS50. (a) Availability. The general service 50,schedule GS50 shall be available within the corporate limits of the City and the suburban fringe. (b) Applicability. This schedule applies to customers served at the established secondary voltage of the City's distribution system. This schedule applies only to individual services with an average metered demand not less than fifty(50)kilowatts and not greater than seven hundred fifty(750) kilowatts. (c) Monthly rate. The monthly rates for this schedule are as follows: (1) Fixed charge, per account: Twenty-five dollars and zero cents ($25.). An additional charge of forty dollars and zero cents ($40.) may be assessed if telephone communication service is not provided by the customer. (2) Coincident demand charge, per kilowatt: Thirteen dollars and twelve cents ($13.12) but not less than one cent($.01) per kilowatt-hour. (3) Distribution facilities demand charge, per kilowatt: Four dollars and thirty- one cents ($4.31). (4) Energy charge, per kilowatt-hour: One and eighty-six one-hundredths cents ($0.0186). (5) In lieu of taxes and franchise: a charge at the rate of six and zero-tenths(6.0) percent of all monthly service charges billed pursuant to this Section. (d) Reneivable resource. Energy generated by the power of wind may be available at a premium price in accordance with the provisions of a special services agreement between the utility and the customer, as such agreements are authorized in this Section. (e) Excess capacity charge. A monthly capacity charge of two dollars ($2.) per kilowatt may be added to the above charges for service to intermittent loads in accordance with the provisions of the electric service rules and regulations. (f) Standby service charges. Standby service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable service demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) Standby distribution charge. a. The monthly standby distribution charge shall be three dollars and sixty-two cents($3.62)per kilowatt of contracted standby service.This charge shall be in lieu of the distribution facilities charge. For all metered kilowatts in excess of the contracted amount, the standby distribution charge shall be ten dollars and eighty-six cents($10.86)per kilowatt. b. In the event the contractual kilowatt amount is exceeded,the beginning date of the contract period will be reset. The first month of the new contract period will become the current billing month and such month's metered demand shall become the minimum allowable contract demand for the standby service. Requests for standby service may be subject to a waiting period. An operation and maintenance charge may be added for special facilities required to provide standby service. (2) Standby generation and transmission charge. All charges incurred by the utility under Platte River Power Authority's applicable tariffs, as may be amended from time to time, will be billed to the customer as a standby generation and transmission charge. (g) Excess circuit charge. In the event a utility customer in this rate class desires excess circuit capacity for the purpose of controlling the available electric capacity of a backup circuit connection, this service, if available, will be provided on an 2 annual contract basis at a level at least sufficient to meet probable backup demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) The excess circuit charge shall be seventy-five cents ($0.75) per contracted kilowatt of backup capacity per month. For any metered kilowatts in excess of the contracted amount, the excess circuit charge shall be two dollars and twenty-five cents ($2.25) per kilowatt. (2) In the event the contractual kilowatt limit is exceeded,a new annual contract period will automatically begin as of the month the limit is exceeded. The metered demand in the month of exceedance shall become the minimum contracted demand level for the excess circuit charge. Section 2. That all subsequent subsections of Section 26-467 shall be renumbered accordingly. Section 3. That Section 26-468 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-468. General service 750, schedule GS750. (a) Availability. The general service 750, schedule GS750 shall be available within the corporate limits of the City and the suburban fringe. (b) Applicability. This schedule applies to customers served at the primary voltage of the City's electric system,thirteen thousand two hundred/seven thousand six hundred twenty (13,200/7,620) volts nominal for three-phase power. This schedule applies only to individual services with an average metered demand of seven hundred fifty (750) kilowatts or greater. The General Manager, at his or her option, may enter into individual, written agreements with customers having an aggregated connected load of one thousand (1,000) kilowatts or more, which agreements shall establish the services to be provided and the amount to be charged to such customers. (c) Monthly rate. The monthly rates for this schedule are as follows: (1) Fixed charge, per account: Thirty dollars and sixty cents ($30.60). a. Additional charge for each additional metering point: Twenty-five dollars and ninety-two cents ($25.92). b. An additional charge of forty dollars and zero cents ($40.) for each metering point may be assessed if telephone communication service is not provided by the customer. -3- (2) Coincident demand charge,per kilowatt:Twelve dollars and ninety-two cents ($12.92) but not less than one cent ($0.01) per kilowatt-hour. (3) Distribution facilities demand charge, per kilowatt: a. First seven hundred fifty(750)kilowatts: Four dollars and twenty-five cents ($4.25). b. All additional kilowatts: Two dollars and ninety-one cents ($2.91). (4) Energy charge,per kilowatt-hour:One and eighty-three one-hundredths cents ($0.0183). (5) In lieu of taxes and franchise: a charge at the rate of six and zero-tenths(6.0) percent of all monthly service charges billed pursuant to this Section. (d) Renewable resource. Energy generated by the power of wind may be available at a premium price in accordance with the provisions of a special services agreement between the utility and the customer, as such agreements are authorized in this Section. (e) Excess capacity charge. A monthly capacity charge of two dollars ($2.)per kilowatt may be added to the above charges for service to intermittent loads in accordance with the provisions of the electric service rules and regulations. (f) Standby service charges. Standby service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable service demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) Standby distribution charge. a. The monthly standby distribution charge shall be two dollars and eighty-four cents ($2.84) per kilowatt of contracted standby service. This charge shall be in lieu of the distribution facilities charge. For all metered kilowatts in excess of the contracted amount, the standby distribution charge shall be eight dollars and fifty-two cents($8.52)per kilowatt. b. In the event the contractual kilowatt amount is exceeded,the beginning date of the contract period will be reset. The first month of the new contract period will become the current billing month and such month's metered demand shall become the minimum allowable contract demand for the standby service. Requests for standby service may be subject to -4- a waiting period. An operation and maintenance charge may be added for special facilities required to provide standby service. (2) Standby generation and transmission charge. All charges incurred by the utility under the Platte River Power Authority's applicable tariffs, as may be amended from time to time, will be billed to the customer as a standby generation and transmission charge. (g) Excess circuit charge. In the event a utility customer in this rate class desires excess circuit capacity for the purpose of controlling the available electric capacity of a backup circuit connection, this service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable backup demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) The excess circuit charge shall be fifty-nine cents ($0.59) per contracted kilowatt of backup capacity per month. For any metered kilowatts in excess of the contracted amount, the excess circuit charge shall be one dollar and seventy-seven cents ($1.77) per kilowatt. (2) In the event the contractual kilowatt limit is exceeded,a new annual contract period will automatically begin as of the month the limit is exceeded. The metered demand in the month of exceedance shall become the minimum contracted demand level for the excess circuit charge. Section 4. That all subsequent subsections of Section 26-468 shall be renumbered accordingly. Introduced,considered favorably on first reading,and ordered published this 7th day of July, A.D. 2009, and to be presented for final passage on the 21st da ly, A.D. 2009. i Mayo ATTEST• De ty Ci Cl rk -5- Passed and adopted on final reading on the 21st day of July, A.D. 2009. May ' ATTEST: City"Clerk -6-