Loading...
HomeMy WebLinkAbout129 - 11/07/1995 - AMENDING CITY CODE SETTING RATES AND CHARGES FOR ELECTRIC SERVICE ORDINANCE NO. 129, 1995 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 26, ARTICLE VI, DIVISION 4 OF THE CODE OF THE CITY OF FORT COLLINS SETTING RATES AND CHARGES FOR ELECTRIC SERVICE WHEREAS, the Council of the City of Fort Collins has determined that the service charge for initiating new electric accounts should be reduced in order to reflect efficiencies that have been incorporated into the Electric Utility operating procedures which have resulted in a lower cost to provide such service; and WHEREAS, the Council has further determined that the Electric Utility should be empowered to provide certain special services to customers and charge for such services by contract between the customer and the Electric Utility; and WHEREAS, the Council has further determined that the Code should be amended to reduce the threshold at which the Electric Utility may establish contractual rates for large customers in order to afford the Utility increased flexibility to meet customer needs. NOW,THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS that Chapter 26,Article VI, Division 4 of the Code of the City be and hereby is, amended as follows: Section 1. That Sec. 26-464 (Residential energy services, schedule R) of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (e) and add a new subparagraph (h) (Special services) to read as follows, and to reletter existing subparagraphs (h) through (k) as subparagraphs (1) through (1) respectively: (e) Service charge. There shall be a service charge of ten dollars and sixty-five cents ($10.65) for the processing of a request for electrical service under this schedule except where-the refuest_ismade for-after-hours-service, in whichcase the service charge shall be forty dollars and sixty-four cents ($40.64). The service charge is further applicable for a special meter reading and/or fractional period billing. (h) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terns for the provision of such special services and capabilities. Section 2. That Sec. 26-465 (Residential demand service, schedule RD) of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (e) and add a new subparagraph (h) (Special services) to read as follows, and to reletter existing subparagraphs (h) through (1) as subparagraphs (1) through (m) respectively: (e) Service charge. There shall be a service charge of ten dollars and sixty-five cents ($10.65) for the processing of a request for electrical service under this schedule except where the request is made for after-hours service, in which case the service charge shall be forty dollars and sixty-four cents($40.64). The service charge is further applicable for a special meter reading and/or fractional period billing. (h) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 3. That Sec. 26-466 (Residential time-of-demand, schedule RT) of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (e) and add a new subparagraph (h) (Special services) to read as follows, and to reletter existing subparagraphs (h) through (m) as subparagraphs (I) through (n) respectively: (e) Service charge. There shall be a service charge of ten dollars and sixty-five cents ($10.65) for the processing of a request for electrical service under this schedule except where the request is made for after-hours service, in which case the service charge shall be forty dollars and sixty-four cents ($40.64). The service charge is further applicable for a special meter reading and/or fractional period billing. (h) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service, provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 4. That Sec. 26-467 (General service, schedule GS) of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (e) and add a new subparagraph (I) (Special services) to read as follows, and to reletter existing subparagraphs (I) through (m) as subparagraphs 0) through (n) respectively: (e) Service charge. There shall be a service charge of ten dollars and sixty-five cents ($10.65) for the processing of a request for electrical service under this schedule except where the request is made for after-hours service, in which case the service charge shall be forty dollars and sixty-four cents ($40.64).The service charge is further applicable for a special meter reading and/or fractional period billing. (1) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such 2 special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 5. That Sec. 26-468 (General service time-of-demand, schedule GST) of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (k) (Special services) to read as follows, and to reletter existing subparagraphs (k) through (o) as subparagraphs (1) through (p) respectively: (e) Service charge. There shall be a service charge of ten dollars and sixty-five cents ($10.65) for the processing of a request for electrical service under this schedule except where the request is made for after-hours service, in which case the service charge shall be forty dollars and sixty-four cents ($40.64). The service charge is further applicable for a special meter reading and/or fractional period billing. (k) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 6. That Sec. 26-469 (General service 50, schedule GS50) of the Code of the City of Fort Collins is hereby amended to add subparagraph (k) (Special services)to read as follows, and to reletter existing subparagraphs (k) through (o) as subparagraphs (1) through (p) respectively: (k) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 7. That Sec. 26-470(General service time-of-demand,schedule GS50T)of the Code of the City of Fort Collins is hereby amended to add subparagraph (in) (Special services) to read as follows, and to reletter existing subparagraphs (m) through (q) as subparagraphs (n) through (r) respectively: (m) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges 3 associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 8. That Sec. 26-471 (General service 750, schedule GS750) of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (b) and add a new subparagraph (k) (Special services) to read as follows, and to reletter existing subparagraphs (k) through (o) as subparagraphs (1) through (p) respectively: (b) Applicability. This schedule applies to customers served at the primary voltage of the city's electric system, thirteen thousand two hundred/seven thousand six hundred twenty (13,200/7,620) volts nominal for three-phase industrial power and combined lighting and power. This schedule applies only to those services with an average metered demand of seven hundred fifty (750) kilowatts or greater. The Director ofthe Electric Utility, at his orher option;may enter into individual, written agreements with customers having an aggregated connected load of one thousand (1,000) kilowatts or more, which agreements shall establish the services to be provided and the amount to be charged to such customers. (k) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service,provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 9. That Sec. 26-472_(General service-750 tinie-of-demand, schedule GS750T)-of the Code of the City of Fort Collins is hereby amended to revise the wording of subparagraph (b) and add a new subparagraph On) (Special services) to read as follows, and to reletter subparagraphs (in) through (q) as subparagraphs (n) through (r) respectively: (b) Applicability. This schedule applies to customers served at the primary voltage of the city's electric system, thirteen thousand two hundred/seven thousand six hundred twenty (13,200/7,620) volts nominal, for three-phase industrial power and combined lighting and power. This schedule applies only to those services with an average metered demand of seven hundred fifty (750) kilowatts or greater. The Director of the Electric Utility, at his or her option, may enter into individual, written agreements with customers having an aggregated connected load of one thousand (1,000) kilowatts or more, which agreements shall establish the services to be provided and the amount to be charged to such customers. (m) Special services. The Electric Utility is authorized to provide special services and capabilities which are beyond those required for basic service, provided that such special services and capabilities are described in a written agreement between the Utility and the customer, which agreement shall also set forth the utility charges 4 associated with the provision of such special services and capabilities. The Director of the Electric Utility shall establish the charges and payment terms for the provision of such special services and capabilities. Section 10. That the amended rates and charges recited herein shall be imposed on all billings rendered on or after January I, 1996. Introduced, considered favorable on first reading, and ordered published in summary form this 17th day of October, A.D. 1995, and to be presented for passage on d i da of November, A.D. 1995. Mayor ATTEST: _ �)P�ity Clerk�� Passed and adopted on final reading this 7th day of No e A.D. 1995 Mayor ATTEST: City Clerk 5