Loading...
HomeMy WebLinkAbout139 - 11/17/2020 - AMENDING CHAPTER 26 OF CITY CODE TO REVISE ELECTRIC RATES, FEES, AND CHARGES ORDINANCE NO. 139, 2020 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT COLLINS TO REVISE ELECTRIC RATES, FEES, AND CHARGES WHEREAS, the City Council is empowered and directed by Article XII, Section 6, of the City Charter to fix, establish, maintain and provide for the collection of such rates, fees or charges for utility services furnished by the City as will produce revenues sufficient to pay the costs, expenses and other obligations of the electric utility, as set forth therein; and WHEREAS, the rates, fees or charges for utility services set forth herein are necessary to produce sufficient revenues to provide the utility services described herein; and WHEREAS, revenues from the rates, fees or charges for utility services set forth herein shall be used to defray the costs of providing such utility services as required by the Charter and the City Code; and WHEREAS, the City purchases bulk wholesale electric power from Platte River Power Authority ("PRPA") pursuant to an Amended Contract for Supply of Electric Power and Energy, dated May 30, 2019; and WHEREAS,Utilities staff has determined the increased local distribution costs will require an additional average 3% rate increase in 2021 in order to remain consistent with Article XII, Section 6, of the City Charter; and WHEREAS, the Energy Board considered the proposed electric rates and methods of application at its September 10, 2020 and October 8, 2020 regular meetings, and provided recommendations of approval of proposed rate sets to City Council; and WHEREAS, the City Council Finance Committee considered the proposed electric rates and methods of application at its October 19, 2020 regular meeting, and provided recommendations of approval of proposed rate sets to the full City Council; and WHEREAS, the City Manager and staff have recommended to the City Council the following electric rate adjustments and City Code rate language clarifications for all billings issued with meter readings on or after January 1, 2021; and WHEREAS, based on the foregoing, it is the desire of the City Council to amend Chapter 26 of the City Code to revise the electric rates, fees and charges as set forth herein. NOW,THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That the City Council hereby makes and adopts the determinations and findings contained in the recitals set forth above. -1- Section 2. That Sections 26-464 (c) through (f), (p), and (r) of the Code of the City of Fort Collins are hereby amended to read as follows: Sec. 26-464. - Residential energy service, schedule R. (c) Monthly rate. The monthly rates for this schedule shall be the sum of the following charges applied to all energy consumption on or after January 1, 2021. Component Billed Charge Description Unit Charge (including PILOT) a. Payment in lieu of taxes (PILOT) and franchise. A charge 6 percent based on all component charges pursuant to this Section ____ j b. Fixed Charge Per $8.10 $8.59 account c. Distribution facilities charge (applied to Per kWh $0.0275 energy charges in d.1. and d.2. below) d. Wholesale Energy Charge (combined energy and demand costs) 1. Summer. For billings based on consumption during the months of May,June, July, August, and September (a) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding per kWh $0.2201 $0.2624 holidays) (b) Off-Peak Per kWh $0.0404 $0.0719 2. Non-summer. For billings based on consumption during the months of January through April and October through December. (a) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding Per kWh $0.1840 $0.2242 holidays) (b) Off-Peak W Per kWh $0.0404 $0.0719 'e. Energy efficiency tier charge, per kilowatt $0.0232 $0.0246 hour for total consumption over 700 kWh in a Per kWh billing month (regardless of on-peak or off-peak) f. Income-qualified assistance discount. Discount applied to ' effective monthly charges in "a.", "b.", "c." and "d." for IQAP participating residential customers, as further 23 percent described in Section 26-724 of the Code. -2- (d) Medical assistance program. r (3) a. Durable Medical Equipment(DME). The discounted monthly rates for customers with electrical durable medical equipment only shall be the sum of the following charges, applied to all energy consumption on or after January 1, 2021: Component Billed Charge Description Unit Charge (including PILOT) 1. Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section 12. Fixed Charge Per $8.10 $8.59 account 3. Distribution facilities charge (applied to energy per kWh $0.0275 charges in 4.a) and 4.b) below) 4. Energy and demand charge— a) Summer. For billings based on consumption during the months of May, June,July, August, and September (i) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding per kWh $0.1541 $0.1924 holidays) (ii) Off-Peak Per kWh $0.0283 $0.0591 b) Non-summer. For billings based on consumption during the months of January through April and October through December. (i) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding per kWh $0.1288 $0.1656 holidays) (ii) Off-Peak Per kWh $0.0283 $0.0591 5. Energy efficiency tier charge, per kilowatt hour $0.0232 $0.0246 for total consumption over 700 kWh in a billing Per kWh i month (regardless of on-peak or off-peak) (4) a. Air Conditioning (A/C). The discounted monthly rates for customers with medical needs requiring air conditioning only shall be the sum of the following charges, applied to all energy consumption on or after January 1, 2021: Component Billed Charge I Description Unit I (including 1 Charge PILOT) 1. Payment in lieu of taxes (PILOT) and franchise. 6 percent —i -3- A charge based on all component charges pursuant to this Section r er 2. Fixed Charge account i $5.10 $8.59 '3. Distribution facilities charge (applied to; Per kWh $0.0275 energy charges in 4.a) and 4.b) below) ` j 4. Energy and demand charge a) Summer. For billings based on consumption during the months of May, June,July, August, and September (i) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding Per kWh $0.0404 $0.0719 holidays) (ii) Off-Peak Per kWh $0.0404 $0.0719 b) Non-summer. For billings based on consumption during the months of January through April and October through December. (i) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding Per kWh $0.1840 $0.2242 holidays) _ T I 1 Fi) Off-Peak Per kWh T $0.0404 $0.0719 15. Energy efficiency tier charge, per kilowatt Per kWh $0.0232 $0.0246 hour for total consumption over 700 kWh in a billing month (regardless of on-peak or off- peak) (5) a. Durable Medical Equipment (DME) & A/C. The discounted monthly rates for customers with electrical durable medical equipment and medical needs requiring air conditioning shall be the sum of the following charges,applied to all energy consumption on or after January 1, 2021: Component Balled Charge Description Unit (including Charge PILOT) 1. Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section I'-----____-- 2. Fixed Charge Per $8.10 $8.59 account 3. Distribution facilities charge (applied to Per kWh $0.0275 energy charges in 4.a) and 4.b) below) 4. Energy and demand charge -4- a) Summer. For billings based on consumption during the months of May, June, July, August, and September (i) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding Per kWh $0.0404 $0.0719 holidays) (ii) Off-Peak Per kWh $0.0283 $0.0591 b) Non-summer. For billings based on consumption during the months of January through April and October through December. (i) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding Per kWh $0.1288 $0.1656 holidays) J (ii) Off-Peak Per kWh $0.0283 $0.0591 5. Energy efficiency tier charge, per kilowatt Per kWh $0.0232 $0.0246 hour for total consumption over 700 kWh in a billing month (regardless of on-peak or off- peak) (e) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at the premium per kilowatt hour set forth in this Subsection (e). The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. Billed Unit Component Charge Charge (including I PILOT) Per kWh $0.015 $0.016 (f) Excess capacity charge. The monthly capacity charge kilowatt set forth in this Subsection (f) may be added to the above charges for service to intermittent loads in accordance with the provisions of the Electric Service Standards. Billed Unit Component Charge Charge (including PILOT) Per kW _ - - - $2.39 $2.53 J (p) Net metering. -5- (5)The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rates under Subsection (c) of this Section. The energy produced by the customer-generator shall be credited to the customer monthly as follows, applied to all generation returned to the grid on or after January 1, 2021. Description Unit Component Bill Credit Credit 1. Distribution facilities credit (applied to credits in 2. and Per kWh ' $0.0217 3. below) 2. Energy and demand credit - For billings based on generation during the months of May, June, July, August and September a) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding holidays) I Per kWh $0.2201 $0.2418 b) Off-Peak Per kWh $0.0404 $0.0621 -3. Energy and demand credit - For billings based on generation during the months of January through April and October through December a) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding holidays) Per kWh $0.1840 $0.2057 b) Off-Peak Per kWh $0.0404 $0.0621 (r) Net metering—Community solar projects. (3) The customer's consumption of energy from the utility and interest in the production of energy that flows into the utilities' distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rates under Subsection (c) of this Section. The method used to measure energy produced and issue credits under this Section shall be the same for subscriber- owned facilities and dedicated program-managed facilities. The energy produced by the customer-generator shall be credited to the customer monthly as follows, applied to all generation returned to the grid on or after January 1, 2021. Description Unit Component Bill Credit Credit 1. Distribution facilities credit(applied to credits in 2. Per kWh $0.0109 and 3. below) 2. Energy and demand credit - For billings based on generation during the months of May, June, July, August and September -6- a) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding Per kWh $0.2201 $0.2310 holidays) 'b) Off-Peak Per kWh $0.0404 7 $0.0513 3. Energy and demand credit- For billings based on generation during the months of January through April and October through December a) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding Per kWh $0.1840 $0.1949 holidays) b) Off-Peak Per kWh $0.0404 0.0513 Section 4. That Sections 26-465 (c) through (f), (q), and (r) of the Code of the City of Fort Collins are hereby amended to read as follows: Sec. 26-465. - All-electric residential service,schedule RE. (c) Monthly rate. (1) The monthly rates for this schedule shall be the sum of the following charges, applied to all energy consumption on or after January 1, 2021. Component Billed Charge Description Unit ` Charge (including PILOT) ,a, Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section b. Fixed Charge Per account $8.10 $8.59 c. Distribution facilities charge (applied to Per kWh $0.0354 charges in d.1. and d.2. below) d. Energy and demand charge 1. Summer. For billings based on consumption during the months of May,June, July and August, and September a) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding per kWh $0.22017 $0.2708 holidays) ` b) Off-Peak Per kWh $0.0404 $0.0804 2. Non-summer. For billings based on consumption during the months of January through April and October through December. a) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding per kWh $ 0.1840 $0.2326 holidays) -7- b) Off-Peak Y Per kWh $0.0404 $0.0804 e. Income-qualified assistance program ("IQAP")discount. 23 percent Discount applied to monthly charges in "b.", "c." and "d" above for IQAP participating residential customers, as further described in Section 26-724 of the Code (d) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at the premium per kilowatt hour set forth in this Subsection (d). The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. Component Billed Charge Unit Charge (including PILOT) Per kWh $0.015 $0.016 (e) Excess capacity charge. The monthly capacity charge kilowatt set forth in this Subsection (e) may be added to the above charges for service to intermittent loads in accordance with the provisions of the Electric Service Standards. Component Billed Charge Unit (including Charge PILOT) _ Per kW $2.39 f $2.53 (f) Standby service charges. Standby service, if available,will be provided on an annual contract basis at a level at least sufficient to meet probable service demand(in kilowatts)as determined by the customer and approved by the utility according to the following: (1) Monthly standby distribution charge: Billed Charge Description Unit Component p Charge (including _ PILOT) Contracted s tandby service, this charge shah—Per kW $2.41 $2.55 'in lieu of the distribution facilities charge For all metered kilowatts in excess of the Per kW $7.21 $7.64 contracted amount i (q) Net metering. (5) The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rates under Subsection (c) of this Section. The energy produced by the customer-generator shall be credited to the customer monthly as follows, applied to all generation returned to the grid on or after January 1, 2021. Description Unit Component! Bill Credit Credit ' 1. Distribution bution facilities credit (applied to credits in 2. and Per kWh $0.0279 3. below) 2. Energy and demand credit - For billings based on generation during the months of May, June, July, August and September a) On-Peak (Mon-Fri, 2 pm to 7 pm, excluding holidays) Per kWh $0.2201 $0.2480 fib) Off-Peak Per kWh $0.0404 $0.0683 ? 3. Energy and demand credit-For billings based on generation during the months of January through April and October through December a) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding holidays) Per kWh $0.1840 $0.2119 b) Off-Peak Per kWh $0.0404 $0.0683 J (r) Net metering- community solar projects. (3) The customer's consumption of energy from the utility and interest in the production of energy that flows into the utilities' distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rates under Subsection (c) of this Section. The method used to measure energy produced and issue credits under this Section shall be the same for subscriber- owned facilities and dedicated program-managed facilities. The energy produced by the customer-generator shall be credited to the customer monthly as follows, applied to all generation returned to the grid on or after January 1, 2021. Description Unit ComponentT Bill Credit Credit 1. Distribution facilities credit (applied to credits in 2. and Per kWh $0.0141 3. below) 2. Energy and demand credit- For billings based on generation during the months of May, iJune, July, August and September a) On-Peak(Mon-Fri, 2 pm to 7 pm, excluding holidays) Per kWh ' $0.2201 $0.2342 -9- b) Off-Peak Per kWh $0.0404 $0.0545 3. Energy and demand credit - For billings based on generation during the months of January through April and October through December a) On-Peak (Mon-Fri, 5 pm to 9 pm, excluding holidays) Per kWh $0.1840 $0.1981 b) Off-Peak Per kWh $0.0404 $0.0545 Section 5. That Sections 26-466 (c), (d), (e), (q), and (r) of the Code of the City of Fort Collins are hereby amended to read as follows: Sec. 26-466. - General service,schedule GS. (c) Monthly rate. The monthly rates for this schedule shall be the sum of the following charges: Billed Description Unit Component Charge Charge (including PILOT) (1) Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section N (2) Fixed Charge a. Single-phase, two-hundred-ampere service Per account $5.25 $5.56 b. Single-phase, above two-hundred-ampere Per account f $15.50 $16.43 service + 1 C. Three-phase, two-hundred-ampere service Per account $8.00 $8.48 Id. Three-phase, above two-hundred-ampere Per account $18.96 $20.10 service (3) Distribution facilities charge (added to Per kWh $0.0356 Y demand and energy charges below for`Billed Charge" shown in (5)) (4) Demand charge a. Summer. For billings based on meter Per kWh $0.0330 readings in the months of June,July, August, and September -1 b. Non-summer. For billings based on meter Per kWh $0.0200 readings in the months of January through May and October through December c. The meter reading date shall generally determine the summer season billing months; however, no customer shall be billed more than four(4) full billing cycles at the summer rate (5) Energy charge a. Summer. For billings based on meter Per kWh $0.0404 $0.1156 readings in the months of June, July, August, and September T b. Non-summer. For billings based on meter Per kWh $0.0404 $0.1018 readings in the months of January through May and October through December c. The meter reading date shall generally r determine the summer season billing months; however, no customer shall be billed more than four(4) full billing cycles at the summer rate - (d) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at the premium per kilowatt hour set forth in this Subsection (d). The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. Unit Component Charge Billed Charge i (including PILOT) Per kWh $0.015 1 $0.01 b (e) Excess capacity charge. The monthly capacity charge per kilowatt set forth in this Subsection (e) may be added to the above charges for service to intermittent loads in accordance with the provisions of the Electric Service Standards. Unit Component Charge Billed Charge k (including PILOT) Per kW $2.39 $2.53 -11- (q) Net metering. (5) The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rate as outlined in Subsection (c) of this Section. The energy produced by the customer-generator shall be credited to the customer monthly as follows: Description _ Unit _T Component Credit a. Energy credit for billings based on generation Per kWh $0.0404 during the months of June, July, August, and September (r) Net metering—community solar projects. (3) Both the customer's con%umption of energy from the utility and interest in the production of energy that flows into the utilities'distribution system shall be measured on a monthly basis. The energy from Fort Collins Utilities consumed by the customer shall be billed at the applicable seasonal tiered rate as outlined in Subsection (c) of this Section. The energy produced by the customer's portion of the qualifying facility shall be credited to the customer monthly as follows: f Description Unit Component Credit a. Energy and demand credit Per kWh $0.0404 Section 6. That Sections 26-467 (c) through (f) and (r) of the Code of the City of Fort Collins are hereby amended to read as follows: Sec. 26-467. - General service 25,schedule GS25. (c) Monthly rate. The monthly rates for this schedule shall be the sum of the following charges: Billed Description Unit Component Charge Charge (including PILOT) 1.Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section -I2- 2. Fixed Charge { a. Single-phase, two-hundred-ampere service Per account $5.54 $5.87 b. Single-phase,above two-hundred-ampere service Per account $16.33 �$17.31 ,c. Three-phase, two-hundred-ampere service Per account $8.44 $8.94 d. Three-phase, above two-hundred-ampere service Per account $19.98 $21.18 3. Distribution facilities charge (applied to energy Per kWh $ 0.0286 charges in 5. below) 4. Demand charge a. Summer. For billings based on meter readings 1 Per kW $10.20 Y $10.81 in the months of June, July, August, and September b. Non-summer. For billings based on meter Per kW $5.75 $6.10 readings in the months of January through May and October through December c. The meter reading date shall generally determine the summer season billing months; however, no customer shall be billed more than four(4) full billing cycles at the summer rate 5. Energy charge y a. Summer. For billings based on meter readings Per kWh T $0.0404 $0.0731 in the months of June,July, August, and September b. Non-summer. For billings based on meter Per kWh $0.0404 �l $0.0731 readings in the months of January through May and October through December (d) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at the premium per kilowatt hour set forth in this Subsection (d). The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. Unit Component Charge Billed Charge (including PILOT) Per kWh $0.015 $0.016 (e) Excess capacity charge. The monthly capacity charge kilowatt set forth in this Subsection (e) may be added to the above charges for service to intermittent loads in accordance with the provisions of the Electric Service Standards. -13- Unit Component Charge Billed Charge (including PILOT) Per kW $2.39 $2.53 (f) Standby service charges. Standby service,if available,will be provided on an annual contract basis at a level at least sufficient to meet probable service demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) Monthly standby distribution charge Billed Description Unit Component Charge i Charge (including _T PILOT) Contracted standby service, this charge shall be in Per kW $4.38 $4.64 lieu of the distribution facilities charge For all metered kilowatts in excess of the Per kW j $13.15 $13.94 (contracted amount (r) Net metering . (5) The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rate as outlined in Subsection (c) of this Section. The energy produced by the customer-generator shall be credited to the customer monthly as follows: Description Unit FBil'I'Credit a. Energy credit for billings based on generation during the months of Per kWh $0.0404 June, July, August, and September ' Section 7. That Sections 26-468 (c) through(g),and (u)of the Code of the City of Fort Collins are hereby amended to read as follows: -14- Sec. 26-468. - General service 50,schedule GS50. (c) Monthly rate. The monthly rates for this schedule shall be the sum of the following charges: Billed Description Unit Component Charge Charge (including PILOT) (1) Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section (2). Fixed Charge Per account $14.64�Y $15.52 (3) Coincident demand charge �a. Summer. For billings based on meter readings in Per kW $14.57 $15.44 the months of June, July, August, and September b. Non-summer. For billings based on meter Per kW $11.56 T$12.25 readings in the months of January through May and October through December — c. The meter reading date shall generally determine the summer season billing months; however, no customer shall be billed more than four (4) full billing cycles at the summer rate (4) Distribution facilities charge Per kW $10.08 $10.69 (5) Energy charge T a. Summer. For billings based on meter readings in Per kWh $0.0404 $0.0428 the months of June, July, August, and September b. Non-summer. For billings based on meter Per kWh $0.0404 $0.0428 readings in the months of January through May and October through December (d) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at the premium per kilowatt hour set forth in this Subsection (d). The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. -15- Component Billed Charge Unit (including Charge PILOT) - I Per kWh $0.015 $0.016 (e) Excess capacity charge. The monthly capacity charge per kilowatt set forth in this Subsection (e) may be added to the above charges for service to intermittent loads in accordance with the provisions of the Electric Service Standards. Component Billed Charge Unit (including Charge PILOT) Per kW $2.39 $2.53 (f) Standby service charges. Standby service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable service demand(in kilowatts) as determined by the customer and approved by the utility according to the following: (1) Standby distribution charge. a. Monthly standby distribution charge shall be the sum of the following charges: Billed Component Charge Description Unit F . Charge (including I PILOT) Contracted standby service, this charge shall be in lieu Per kW $5.62 $5.96 of the distribution facilities charge For all metered kilowatts in excess of the contracted Per kW $16.40 $17.38 amount (g) Excess circuit charge. In the event a utility customer in this rate class desires excess circuit capacity for the purpose of controlling the available electric capacity of a backup circuit connection, this service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable backup demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) Monthly charge shall be the sum of the following charges: -1 6- Billed Description Unit Component Charge Charge (including PILOT) Contracted backup capacity per month Per kW $1.14 �i $1.21 Metered kilowatts in excess of the contracted amount Per kW $3 46 $3.67 (u) Net metering. (5) The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy from the utility consumed by the customer-generator shall be billed at the applicable rate as outlined in Subsection (c) of this Section. The energy produced by the customer-generator shall be credited to the customer monthly as follows: Description T Unit Bill Credit a. Energy credit for billings based on generation during the months of Per kWh $0.0404 June, July, August and September Section 8. That Sections 26-469 (c) through (g) and (v) of the Code of the City of Fort Collins are hereby amended to read as follows: Sec. 26-469. - General service 750, schedule GS750. (c) Monthly rate. The monthly rates for this schedule shall be the sum of the following charges: Component Billed Charge Description Unit (including Charge PILOT) � I (1) Payment in lieu of taxes (PILOT) and franchise. 6 percent :A charge based on all component charges pursuant to this Section (2) Fixed Charge Per j account $28.75 $30.48 -17- a. Additional charge for each additional metering Per point account $17.54 $18.59 (3) Coincident demand charge t a. Summer. For billings based on meter readings in Per kW the months of June, July, August, and September $13.55 $14.36 } b. Non-summer. For billings based on meter Per kW T w E readings in the months of January through May and $10.75 $11.40 October through December c. The meter reading date shall generally determine w the summer season billing months; however, no customer shall be billed more than four (4) full billing cycles at the summer rate (4) Distribution facilities charge T F First seven hundred fifty (750) kilowatts Per kW $11.08 $11.75 1b. All additional kilowatts Per kW $6.55 $6.94 (5) Energy charge a. Summer. For billings based on meter readings in Per kWh i� $0.0398 $0,0422 the months of June, July, August, and September b. Non-summer. For billings based on meter Per kWh $0.0398 $0.0422 readings in the months of January through May and October through December (d) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at the premium per kilowatt hour set forth in this Subsection (d). The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. Billed Unit Component Charge Charge (including I PILOT) Per kWh $0.015 T $0.016 (e) Excess capacity charge. The monthly capacity charge per kilowatt set forth in this Subsection (e) may be added to the above charges for service to intermittent loads in accordance with the provisions of the Electric Service Standards. -18- Billed Unit Component Charge Charge (including PILOT) Per kW $2.39 $2.53 (f) Standby service charges. Standby service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable service demand (in kilowatts) as determined by the customer and approved by the utility according to the following: (1) Standby distribution charge. a. Monthly standby distribution charges shall be paid in the following amounts I Billed Description Unit Component Charge Charge (including PILOT) Contracted standby service, this charge shall be in lieu Per kW $3.88 $4.12 of the distribution facilities charge. For all metered kilowatts in excess of the contracted Per kW $11.68 $12.38 amount (g) Excess circuit charge. In the event a utility customer in this rate class desires excess circuit capacity for the purpose of controlling the available electric capacity of a backup circuit connection, this service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable backup demand (in kilowatts) as determined by the customer and approved by the utility at the following rates: (1) Monthly charge. Billed Description Unit Component Charge Charge (including L -- PILOT) 1 Contracted backup capacity per month Per kW $0.80 $0.85 Metered kilowatts in excess of the contracted amount Per kW $2.40 T $2.54 -19- (v) Net metering. (5) The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy consumed from the utility by the customer-generator shall be billed at the applicable rate as outlined in Subsection (c) of this Section. The energy produced by the customer- generator shall be credited to the customer monthly as follows: Description Unit Bill Credit a. Energy credit for billings based on generation during the Per kWh $0.0398 months of June, July, August, and September Section 9. That Sections 26-470 (c), (d), (e), and (s) of the Code of the City of Fort Collins are hereby amended to read as follows: Sec. 26-470. - Substation service, schedule SS. (c) Monthly rate. The monthly rates for this schedule shall be the sum of the following charges: Component Billed Charge Description Unit Charge (including PILOT) (1) Payment in lieu of taxes (PILOT) and franchise. 6 percent A charge based on all component charges pursuant to this Section. (2) Fixed Charge Per $70.42 $74.65 account (3) Coincident demand charge a. Summer. For billings based on meter readings in Per kW $13.35 $14.15 the months of June, July, August, and September I b. Non-summer. For billings based on meter Per kW $10.59 $11.23 readings in the months of January through May and f October through December T c. The meter reading date shall generally determine the summer season billing months; however, no customer shall be billed more than four(4) full billing cycles at the summer rate -20- (4) Distribution facilities charge Per kW F $5.71 $6.05 (5) Energy charge a. Summer. For billings based on meter readings in Per kWh $0.0392 $0.0416 the months of June,July, August, and September b. Non-summer. For billings based on meter 'Per kWh $0.0392 $0.0416 readings in the months of January through May and October through December (d) Renewable resource. Renewable energy resources, including, but not limited to, energy generated by the power of wind, may be offered on a voluntary basis to customers at a premium per kilowatt hour. The utility may establish and offer voluntary programs designed to increase and enhance the use of energy generated by renewable energy resources in support of Council-adopted policy applicable to the utility. Billed Unit Component Charge Charge (including PILOT) Per kWh l $0.015 $0.016 (e) Standby service charges. Standby service, if available, will be provided on an annual contract basis at a level at least sufficient to meet probable service demand (in kilowatts)as determined by the customer and approved by the utility at the following rates: (1) Standby distribution charge. a. Monthly standby distribution charge: Billed Description Unit Component Charge Charge (including PILOT) Contracted standby service, this charge shall be in Per kW $2.89 $3.07 lieu of the distribution facilities charge. For all metered kilowatts in excess of the contracted Per kW $8.68 $9.20 amount -21Y (s) Net metering. (5)The customer-generator's consumption of energy from the utility and production of energy that flows into the utility's distribution system shall be measured on a monthly basis. The energy consumed from the utility by the customer-generator shall be billed at the applicable rate as outlined in Subsection (c) of this Section. The energy produced by the customer- generator shall be credited to the customer monthly as follows: Description Unit Bill Crediit—� a. Energy credit for billings based on generation during the months of Per $0.0392 June, July, August, and September kWh Section 10. That Section 26-471 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-471. - Special area floodlighting,schedule FL. (b) Monthly rate. The monthly rates (including a six (6) percent charge in lieu of taxes and franchise) are as follows: (1) Charge per lamp, mercury vapor: Component Billed Charge Description (including Charge PILOT) a. One hundred seventy-five(175) watt $19.23 $20.38 b. Two hundred fifty (250) watt $22.65 $24.01 c. Four hundred (400) watt $29.68 y $31.47 — - (2) Charge per lamp, high-pressure sodium: Component Billed Charge Description (including Charge PILOT) j a. Seventy (70) watt $8.13 $8.61 b. One hundred (100) watt $ $11.93 -22- ' $11.49 $12.18 c. One hundred fifty (150) watt $18.18 $19.27 d. Two hundred fifty (250) watt w $23.18 $24.57 e. Four hundred (400) watt $30.62 $32.46 (3) Charge per lamp, LED: Component Billed Charge Description (including Charge PILOT) a. Fifty-four(54) watt (Cobra) p $7.97 $8.45 b. Seventy-two (72) watt (Cobra) $9.27 $9.83 c. Eighty (80) watt (Cobra) $9.58 $10.16 d. Eighty-eight (88) watt (Cobra) $10.15 $10.76 e. Sixty-five (65) watt (Post Top) $12.47 $13.21 Section 11. That Section 26-472 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-472. - Traffic signal service,schedule T. (c) Monthly rate. The monthly rates (including a six (6) percent charge in lieu of taxes and franchise) shall be the sum of the following charges: Billed Description Unit Component Charge Charge (including PILOT) (1) Fixed charge Per account $83.08 $88.06 (2) Energy charge Per kWh $0.0773 $0.0819 (3) Service extensions and signal installations J made by the utility shall be paid for by the City General Fund, subject to material and installation costs at the time of installation Section 12. That the modifications set forth above shall be effective for all energy consumption on or after January 1, 2021. -?3- Introduced, considered favorably on first reading, and ordered published this 4th day of October, A.D. 2020, and to be presented for final passage on the 17th day of November, A.D. 2020. ATTEST: 07 FOR r SEAL ity Cle LoR Passed and adopted on final reading on the 17th day of Novemb .D. 2020. r ATTEST: ORt c�`I SEAL " .ity C rk °otaRPoo ..24-