HomeMy WebLinkAbout147 - 11/05/2013 - AMENDING CHAPTER 26 OF THE CITY CODE TO REVISE THE ELECTRIC DEVELOPMENT FEES AND CHARGES ORDINANCE NO. 147, 2013
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE THE ELECTRIC DEVELOPMENT FEES AND CHARGES
WHEREAS, the City Council is empowered and directed by Article XII, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or
charges for utility services furnished by the City as will produce revenues sufficient to pay the
costs, expenses and other obligations of the electric utility, as set forth therein; and.
WHEREAS, the City Council has determined that it is appropriate for new development
to contribute its proportionate share of providing capital improvements; and
WHEREAS, Section 26-471 of the City Code requires that the electric development fees
be reviewed annually by the City Manager and that the fees be presented to the City Council for
approval no less than biennially; and
WHEREAS, on November 6, 2012, the City Council adopted Ordinance No. 115, 2012,
which established the electric development fees now in effect; and
WHEREAS, the City Manager and staff have recommended to the City Council the
following adjustments to the electric development fees and charges for all invoices paid on or
after January 1, 2014; and
WHEREAS, based on the foregoing, it is the desire of the City Council to amend Chapter
26 of the City Code to revise electric development fees and charges.
NOW. THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That Section 26-474 (b) and (c), "Residential electric development fees
and charges" of the Code of the City of Fort Collins is hereby amended to read as follows:
See. 26-474. Residential electric development fees and charges.
(b) The ECF shall be the total of the site footage charge, dwelling charge and systems
modification charge, to be determined as follows:
(1) The site footage charge shall be the combined total of:
a. five and thirty-six thousandths cents ($0.05036) per square foot of
developed site square footage, excluding the area of dedicated public
rights-of-way; and
- 1 -
b. ten dollars and thirty-five cents ( $10.35) per lineal foot of the
developed site abutting a dedicated street or roadway.
(2) The dwelling unit charge shall be as follows:
a. For a single-family panel size with one-hundred-fifty-amp service
(nonelectric heat), one thousand three hundred and ninety-eight dollars
($1;398) per dwelling unit;
b. For a single-family panel size with two-hundred-amp service or
with one-hundred-fifty-amp service (electric heat), two thousand three
hundred twenty-nine dollars ($2,329) per dwelling unit;
C. For a multi-family panel size with one-hundred-fifty-amp service
(nonelectric heat), nine hundred thirty-three dollars ($933) per dwelling
unit;
d. For a multi-family panel size with two-hundred-amp service or
with one-hundred-fifty-amp service (electric heat), one thousand six
hundred thirty-eight dollars ( $1,638) per dwelling unit.
(3) A system modifications charge will apply when a new or modified service
will require infrastructure in addition to or different from the standard base
electrical system model. The differential costs associated with such system
modifications will be included in the calculated ECF.
(c) A Building Site Charge (BSC") for any new or modified residential service shall
be paid prior to issuance of a building permit for the related construction or modification.
The BSC shall be based upon the current rates as of the time of issuance of the building
permit. The BSC shall be the total of the secondary service charges, and any additional
charges, determined as follows:
(1) The secondary service charge shall be as follows:
Secondary Service Size Charge (up to 65 feet) Plus Per Foot Charge
for Each Foot Over 65
1/0 service $672.00 $4.93/Foot
4/0 service $810.00 $5.68/Foot
- 2 -
350 kCM Service $ 903 . 00 $ 7 . 24/Foot
1 /0 Mobile Home Service $ 524 . 00 N/A
4/0 Mobile Home Service $640 , 00 N/A
(2) Actual special costs to the utility of installation of secondary service resulting
from site conditions shall be included in the BSC as additional charges . Such
conditions may include, but are not limited to, frozen or rocky soil, concrete cutting
and asphalt replacement.
Section 2 . That Section 26-475 (b) and (c), "Nonresidential electric development fees
and charges" of the Code of the City of Fort Collins is hereby amended to read as follows :
Sec. 26-475. Nonresidential electric development fees and charges.
(b) The ECF shall be the total of the site footage charge, kVA service charge and
systems modification charge, to be determined as follows :
( 1 ) The site footage charge shall be the combined total of:
a. five and thirty-six thousandths cents ($0 .05036) per square foot of
developed site square footage, excluding the area of dedicated public
rights-of-way; and
b . forty-one dollars and twenty-five cents ($41 . 25 ) per lineal foot of
the developed site abutting a dedicated street or roadway.
(2) The kVA service charge shall be determined as follows .
a. For customer electric loads served by the utility the kVA service
charge shall be :
1 . Utility owned transformers : the kVA service charge shall be
sixty-four dollars and thirty-two cents ($64 . 32) per kilovolt-amp
(kVA) of service load rating.
2 . Customer owned transformers : the kVA service charge shall be
fifty-three dollars and eighty-seven cents ($ 53 . 87) per kilovolt-
amp (kVA) of service load rating.
- 3 -
b. For the utility to receive customer generation in excess of the
customer's electric service provided by the utility, the following KVA
service charge will also apply:
i. Utility owned transformers: the kVA service charge shall be
fifty-three dollars and eighty-seven cents ($53.87) per kilovolt-amp
(kVA) of generation service rating in excess of the service load
rating as paid per subparagraph (2) a.i. above. Such ratings shall
be determined by the Utilities Executive Director.
ii. Customer owned transformers: the kVA service charge shall be
forty-three dollars and thirty-seven cents ($43.37) per kilovolt-amp
(kVA) of generation service rating in excess of the service load
rating paid per subparagraph (2) a.ii. above. Such ratings shall be
determined by the Utilities Executive Director.
(3) A system modifications charge will apply when a new or modified service
will require infrastructure in addition to or different from the standard base
electrical system model. The differential costs associated with such system
modifications will be included in the calculated ECF.
(c) A Building Site Charge (BSC) for extending primary circuitry to the
transformer for any new or modified nonresidential service shall be invoiced and paid in
the same manner and at the same time as the ECF is invoiced and paid pursuant to
Subsection (a) of this Section. The BSC shall be the total of the primary circuit charge,
transformer installation charge and any additional charges, determined as follows:
(1) The primary circuit charge for service from the utility source to the
transformer shall be as follows:
a. for single-phase service, a charge of nine dollars and fifty-three
cents ($9.53) per foot of primary circuit; `
b. for three-phase service, a charge of eighteen dollars and thirty-
three cents ($18.33) per foot of primary circuit.
(2) The transformer installation charge shall be as follows:
a. for single-phase service, a charge ,of one thousand three hundred
seventy-two dollars ($1,372) per transformer;
b. for three-phase service, a charge of two thousand four hundred
forty-two dollars ($2,442) per transformer.
(3) Actual special costs to the utility of installation of service resulting from
site conditions shall be included in the BSC as additional charges. Such
- 4 -
conditions may include, but are not limited to, frozen or rocky soil,
concrete cutting and asphalt replacement.
Section 3. That the amendments to Chapter 26 of the City Code contained herein
shall go into effect for all invoices paid on or after January 1, 2014.
Introduced, considered favorably on first reading, and ordered published this 15th day of
October, A.D. 2013, and to be presented for final passage on the 5th day of November, A.D.
2013.
OF FORTCC!!' Ma or
ATTEST: V, •:u,
SEAL
City Clerk CRh'
Passed and adopted on final reading on the 5th day of November, A.D. 2013.
� - Mryor ro Taut
ATTEST: }:ZZV OF FOR
n
�
.•O
•r"'Y :r
co
City Clerk (0.1
R '00
5