HomeMy WebLinkAbout016 - 04/04/1974 - AMENDING SECTIONS 112-41, 112-42, AND 112-43 OF THE CITY CODE RELATING TO OVERSIZED WATER LINES r
� � v
ORDINANCE NO 16, 1974
BEING AN ORDINANCE AMENDING SECTIONS 112-41, 112-42,
AND 112-43 OF THE CODE OF THE CITY OF FORT COLLINS
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS
Section 1 That Section 112-41 of the Code of the City of Fort
Collins be, and the same hereby is, amended to read as follows
"Section 112-41 Extension of water mains, payment
of costs
"A When water mains are extended, the property owners
benefited thereby, as determined by the City, shall
pay all of the costs of extending such mains insofar
as such costs relate to the size main required to
serve the property benefited In the event the
City requires that such main be of a size larger
than that necessary to serve the property for which
the main is extended, the City water utility shall
pay the additional costs incurred on such account
"B The City Manager shall propagate rules and regulations
setting forth the method of determining the portion
of the cost of main extension to be borne by the City,
which regulations shall be submitted to the City
Council for approval "
Section 2 That Section 112-42 of the Code of the City of Fort
Collins be, and the same hereby is, amended to read as follows
I
"Section 112-42 Extension of water mains in subdivisions
"All water mains required to serve a platted subdivision,
including cross connecting mains shall be installed by
the subdivider The subdivider shall install mains
to the farthest point or points of his subdivision The
City may participate in the cost of installing such mains
as provided in Section 112-41 "
Section 3 That Section 112-43 of the Code of the City of Fort
Collins be, and the same hereby is, amended to read as follows
"Section 112-43 Reimbursement of subdivider for water
main extension
"When a suodivider finds it necessary to bring water
service fr„- the existing water system through vacant
property to his platted subdivision, or to construct
_ 4 J
w
lines on the perimeter of said subdivision the subdivider
shall be responsible for the installation of all of such
mains as shall be necessary and required by the City
The size of the mains shall be determined by the City,
and the City may participate in the cost of installing
such mains in accordance with the provisions of Section
112-41 At the time of annexation, or as the property
abutting said water main is developed and connections
are made to the said water main, the City may collect
a charge assessed in relation to the benefit to the
affected property based upon the original construction
cost, and if so collected, the City shall reimburse the
original subdivider to the extent of the collection so
made In no event shall the actual amount so paid to
the subdivider by the City exceed the original cost to
the subdivider of the excess extension It
Introduced, considered favorably on first reading, and ordered
published this 21st day of March, A D 1974, and to be presented for
final passage on the 4th day of April, A D 1974
ATTEST Mayor
City CNN-
Passed and adopted on final reading this 4th day of April,
A D 1974
ATTEST Mayor
City Clerk
-2-