ORDINANCE NO 4 1975
BEING AN ORDINANCE AMENDING ARTICLE III
OF CHAPTER 112 OF THE CODE OF THE CITY
OF FORT COLLINS RELATING TO THE CITY
ELECTRIC UTILITY AND RATES FOR SERVICES
FROM SUCH UTILITY
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS
Section 1 That Section 112-118 of the Code of the City of
Fort Collins be, and the_same hereby is amended by deletion thereof
and by subst ituting therefor the following
The following schedule of rates is hereby adopted and approved
which shall be the lawful rates for the City of Fort Collins to charge and
collect for all electrical service of every kind, but within and without
the corporate limits of the City of Fort Collins for customers connected
to the distributing system of the said City of Fort Collins being the
schedule of rates referred to in Section 112-117 of this Code
A Schedule No 1 Residential Service
(1 ) Applicability This schedule shall be applicable
within the corporate limits of Fort Collins and the
suburban fringe
(2) Availability single-family basis This schedule
is available to residential consumers for all domestic
uses in single-family private dwellings or individually
metered apartments and is not available for hotels
motels, fraternities, sororities clubs rooming houses ,
rest homes churches hospitals or for businesses
operated in conjunction with a residence
(3) Rates
Kilowatt-Hours Charges per
Used per Month Kilowatt-Hour
First 35 kilowatt-
hours per month $0 05
Next 40 kilowatt-
hours per month 04
Next 300 kilowatt-
hours per month 0223
All additional kilowatt-
hours per month 015
(4) Minimum charge The net minimum charge per meter
per month shall be one dollar and seventy-five cents
($1 75)
(5) Service charge A service charge of $7 25 will be
collected for the processing of a request for
electrical service under this Schedule
(6) Availability multifamily basis The foregoing rate
schedule is also available for multifamily residential
use by multiplying each step of the rate and the
minimum by the following factors
Type of Unit Multiplication Factor
Two-family 1 9
Three-family 2 7
Four-family 3 4
Five-family 4 1
More than five- 0 8 per unit
family add over 5 units
(7) Payment of charges The foregoing rates are net Bills
for electric service are due and payable within ten (10)
days from the date of billing
(8) Contract period All contracts under this schedule shall
be for a minimum period of thirty (30) days and there-
after until terminated upon three (3) days' written
notice to the city
(9) Rules and regulations
(a) A family unit is defined as living quarters for a
family as herein defined plus the space provided
for rent of sleeping rooms only without cooking
facilities for not exceeding two (2) roomers In
private residences where space is arranged to be
rented to more than two (2) roomers space for
each four (4) or less additional roomers shall be
considered as an additional family unit For the
purpose of the foregoing a family shall be con-
strued to mean two (2) or more persons related by
blood or marriage In the event a residence is
not occupied by a family then a single family
unit shall be construed to be no more than
five (5) persons not related by blood or marriage
whether roomers or otherwise, and the space for
each four (4) or less additional residents shall be
considered as an additional family unit (Amended
3-7-74 by Ord No 13, 1974)
-2-
(b) Those desiring service under this schedule shall
apply at the office of the Light and Power
Department and agree to abide by the conditions
of this schedule and the provisions of the Electric
Service Rules and Regulations of the city, as
approved by the City Council Any person requesting
or receiving electric service from the city shall
make his premises subject to inspection by the
Light and Power Department as required
B Schedule No 2 Business Service
(1 ) Applicability This schedule shall be applicable within
the corporate limits of Fort Collins and the suburban
fringe
(2) Availability
(a) This schedule is available for lighting service or
combined lighting and power service to commercial
and industrial customers including hotels motels
fraternities sororities clubs lodges rooming
houses rest homes tourist camps churches
hospitals and similar uses and optionally for
apartments and multiple dwellings where more than
one (1 ) dwelling or single living quarter is served
through one (1 ) meter
(b) Service under this schedule is available through
a single meter at single-phase or where service is
available three-phase secondary voltage Single-
phase motors from one (1 ) to five (5) horsepower
may be connected with the approval of the Department
(3) Rates
Kilowatt-Hours Charges per
Used per Month Kilowatt-Hour
First 50 kilowatt-
hours used per month $0 05
Next 100 kilowatt-
hours used per month 04
Next 1 350 kilowatt-
hours used per month 036
All additional kilowatt-
hours per month 029
-3-
(4) Minimum charges The minimum charge shall be not
less than three dollars and sixty cents ($3 60)
per month The minimum demand charge shall be not
less than two dollars ($2 00) per thousand watts of
connected load or two dollars ($2 00) per kilowatt,
fifteen-minute integrated demand if a demand meter is
installed in connection with the service
(5) Service charge A service charge of $7 25 will be
collected for the processing of a request for
electrical service under this Schedule
(6) Payment of charges The foregoing rates are net
Bills for electric service are due and payable within
ten (10) days from the date of billing
(7) Power factor The customer shall install power factor
correction equipment if necessary to ensure a power
factor of not less than ninety percent (90%) lagging
(8) Contract period All contracts under this schedule
shall be for a minimum period of thirty (30) days and
thereafter until terminated where service is no longer
required on three (3) days' written notice to the city
(9) Rules and regulations Those desiring service under
this schedule shall apply at the office of the Light
and Power Department and agree to abide by the con-
ditions of this schedule and the provisions of the
Electric Service Rules and Regulations of the city
as approved by the City Council
C Schedule No 4 General Secondary Power Service
(1 ) Applicability This schedule shall be applicable within
the corporate limits of Fort Collins and the suburban
fringe
(2) Availability This schedule is available at either
single-phase or three-phase secondary voltage power
service
(3) Rates
Kilowatt-Hours Charges per
Used per Month Kilowatt-Hour
First 40 kilowatt-
hours used per month
per kilowatt of demand,
but not less than for first
80 kilowatt-hours used $0 055
-4-
Next 60 kilowatt-
hours used per month
per kilowatt of demand
but not less than for next
120 kilowatt-hours used 0485
All additional kilowatt-hours
used per month 0175
(4) Minimum charges
(a) The net monthly minimum charge per kilowatt
of demand shall be one dollar and fifty cents
($1 50)
(b) The minimum monthly charge shall be not less
per meter than three dollars and sixty cents
($3 60)
(5) Service charge A service charge of $27 50 will
be collected for the processing of a request for
electrical service under this Schedule
(6) Payment of charges The foregoing rates are net
Bills for electric service are due and payable within
ten (10) days from the date of billing
(7) Determination of billing demand The highest rate of
use in kilowatts during any fifteen-minute interval
of the billing period shall be as determined at the
Light and Power Department s option by demand meter
or periodic load test
(8) Power factor adjustment If the power factor during
the time the billing demand is established falls below
the figure ninety percent (90%) lagging, adjustment
may be made by increasing the measured demand for each
month by one percent (1%g for each one percent (1%)
or major fraction thereof by which the power factor
during the billing demand period is less than ninety
percent (90/) lagging
(9) Contract period Service under this schedule is
available for a minimum period of ninety (90) days
and thereafter until terminated by three (3) days
written notice to the city
(10) Rules and regulations Those desiring service under
this schedule shall apply at the office of the Depart-
ment and agree to abide by the conditions of this
schedule and the provisions of the Electric Service
Rules and Regulations of the city as approved by the
City Council
-5-
D Schedule No 5 Industrial Power
(1 ) Applicability This schedule shall be applicable within
the corporate limits of Fort Collins and the suburban
fringe
(2) Availability This rate is intended to be available at
the voltage of the city's primary electric system at
thirteen thousand eight hundred (13 800) volts for
three-phase industrial power and combined lighting
and power
(3) Rates
Kilowatt-Hours Charges per
Used per Month Kilowatt-Hour
First 50 kilowatt-
hours used per month
per kilowatt of billing demand,
but not less than 6 250
kilowatt-hours $0 04
Next 40 kilowatt-
hours used per month
per kilowatt of billing demand,
but not less than 5 000
kilowatt-hours 0366
Next 500 000 kilowatt-
hours used per month 0082
Excess kilowatt-hours 007
(4) Minimum Charges The minimum charge shall be not
less than five hundred dollars ($500 00) per month
for power service provided that the connected lighting
load used does not exceed twenty-five percent (25%) of
the total connected load and not less than five
thousand dollars ($5,000 00) per month for combined
lighting and power service where the connected
lighting load exceeds twenty-five percent (25%)
(5) Service charge A service charge of $27 50 will be
collected for the processing of a request for
electrical service under this Schedule
(6) Payment of charges The foregoing rate is net
Bills for electric service are due and payable within
ten (10) days from the date of billing
(7) Billing demand The billing demand shall be the
highest rate of use in kilowatts during any fifteen-
minute interval of the billing period, as determined
at the Light and Power Department's option by demand
-6-
meter or periodic load test adjusted by the power
factor adjustment provided that it shall be not less
than sixty percent (60%) of the highest billing demand
occurring during any of the preceding eleven (11 )
months
(8) Power factor adjustment If the power factor during
the time the billingg demand is established falls below
ninety percent (90%) lagging adjustment may be made
by increasing the measured demand for each month by
one percent (1%) for each one percent (1%) or major
fraction thereof by which the power factor during the
billing period is less than ninety percent (90%)
lagging
(9) Secondary service Where service is rendered under
this schedule at secondary voltage and the city owns
and furnished the transformer and substation con-
verting to the lower voltage desired by the customer
an additional charge shall be made each month of two
percent (2%) of the bill for service If for any reason
metering is accomplished at secondary voltagge an
additional one and one-half percent (1-1/2%) shall be
added to the monthly bill A charge additional to the
schedule shall be made each month of two percent (2%)
of the bill for service at two thousand four hundred
(2 400) volts or four thousand one hundred sixty
(4 160) volts
(10) Contract period Service under this schedule is
available for a minimum period of twelve (12) months
and thereafter until terminated by ten (10) days'
notice in writing to the city
(11 ) Rules and regulations Service under this schedule is
subject to provisions of the Electric Service Rules and
Regulations of the city as approved by the City Council
E Schedule No 10 Special Area Floodlighting
(1 ) Applicability This schedule shall be applicable within
the corporate limits of Fort Collins and the suburban
fringe for outdoor area floodlighting of consumer's
property from dusk to dawn where such service can be
rendered directly from existing secondary distribution
lines of the city
(2) Rates
Size of
Mercury Vapor Lamp Charges per Month
Single
175-Watt $ 4 75
250-Watt 6 25
-7-
400-Watt 8 50
1 000-Watt 17 50
High Pressure Sodium Lamps Charges per Month
250-Watt $ 8 50
400-Watt 17 50
(3) Payment of charges The foregoing rates are net Bills
for electric service are due and payable within ten (10)
days from the date of billing
(4) Contract period and conditions
(a) Service under this schedule is available for a
minimum period of twelve (12) months and there-
after until terminated by ten (10) days notice
in writing to the city
(b) The city will install own operate and maintain
all area lighting equipment installed on existing
pole line facilities under this schedule If
underground service is desired or additional poles
and wire or special fixtures should be required
approval of the city must be obtained and the
additional costs therefor shall be paid in advance
to the city by the consumer on a nonrefundable
basis
(c) The burning of the lamps shall be controlled by
automatic control equipment installed by the
city, and burning time shall be approximately
thirty (30) minutes after sunset to approximately
thirty (30) minutes before sunrise
(d) The city shall be notified by the consumer of any
operational failure of the lamps Lamp replace-
ments or repairs will be performed only during
regular working hours
(5) Rules and regulations Those desiring service under
this schedule shall apply at the office of the Light and
Power Department and agree to abide by the conditions of
this schedule and the provisions of the Electric Service
Rules and Regulations of the city, as approved by the
City Council
F Schedule No 11 Combined Lighting and Power Service
(1 ) Applicability This schedule shall be applicable in the
service area of the City of Fort Collins for supplying
all of the electric lighting and power requirements of a
customer through a single meter
-8-
(2) Availability This rate is available at the established
secondary voltage of the city's distribution system
Service shall be at three-phase except that it may be
rendered at single-phase with the approval of the Light
and Power Department Voltages for four-wire service
shall be subject to the requirements of the Department
(3) Rates
Charges Per
Kilowatt-Hours Used Kilowatt-Hour
First 60 kilowatt-
hours used per month
per kilowatt of billing demand
but not less than 2 400
kilowatt-hours $0 04
Next 75 kilowatt-
hours used per month
per kilowatt of billing demand
but not less than 3,000
kilowatt-hours 033
Next 20 000 kilowatt-
hours used per month 015
Excess kilowatt-hours 007
(4) Minimum charge The minimum charge shall be not
less than two hundred dollars ($200 00) per month
(5) Service charge A service charge of $27 50 will be
collected for the processing of a request for electrical
service under this Schedule
(6) Payment of charges The foregoing rates are net
Bills for electric service are due and payable within
ten (10) days from the date of billing
(7) Billing demand The billing demand shall be determined
by suitable meter measurement of the highest fifteen-
minute integrated demand occurring during the monthly
billing period adjusted by the power factor adjust-
ment provided that it shall be not less than sixty
percent (60/) of the highest billing demand occurring
during any of the preceding eleven (11 ) months
(8) Power factor adjustment If the power factor during
the time the billing demand is established falls below
ninety percent (90%) lagging adjustment may be made
by increasing the measured demand for each month by
one percent (1%) for each one percent (1%) or major
fraction thereof by which the power factor during
the billing demand period is less than ninety percent
(90%) lagging
-9-
(9) Primary service Where service is metered under this
schedule at primary voltage a discount shall be made
each month of one and one-half percent (1-1/2%) of the
bill for service Where service is taken at the city s
established primary voltage and the city does not own
the transformers and substations converting to secondary
voltage, an additional credit of two percent (2%) of
the monthly bill shall be allowed
(10) Contract period Service under this schedule is
available for a minimum period of twelve (12) months
and thereafter until terminated by ten (10) days ' notice
in writing to the city
(11 ) Rules and regulations Those desiring service under this
schedule shall apply at the office of the Light and Power
Department and agree to abide by the conditions of this
schedule and the provisions of the Electric Service
Rules and Regulations of the city, as approved by the
City Council
G Schedule M Municipal Street Lighting
(1 ) Applicability This schedule shall be applicable only
to municipal street lighting service
(2) Availability This service shall be available within
the city limits of Fort Collins, Colorado
(3) Rates
Mercury Vapor Lamps Charge
Burning Dusk to Dawn per Year
175-Watt $ 45 25
250-Watt 53 00
400-Watt 66 00
1 000-Watt 125 25
High-Pressure Sodium Lamps Charge
Burning Dusk to Dawn per Year
250-Watt $ 65 00
400-Watt 90 50
(4) Payment of charges Bills for municipal street lighting
service will be rendered by the Light and Power Depart-
ment and paid by the city at the end of each month
Monthly billing will be based on the inventory of
completed installations at the time of billing
-10-
(5) Lighting districts
(a) Artificial lighting districts if not covered by
the provisions of Chapter 16 Improvements Local
Public of this Code are to be financed by the
subdivider on a cash basis subject to material
and installation costs at the time of the installa-
tion Participation by the city at large in
artificial lighting districts shall be limited to
the additional costs incurred due to lighting levels
in excess of residential standards
(b) Where requested by the city the Light and Power
Department shall install all lamps wire poles
and fixtures and other necessary equipment for
service Such installations are to be financed
by the city general fund
H Schedule T Traffic Signal Service
(1 ) Applicability This schedule shall be applicable only
to municipal traffic signal service
(2) Rates
Charqe per
Kilowatt-Hour
Kilowatt-hours used $ 0211
(3) Equipment rental charges when applicable will be
determined by cost analysis by the Department Service
extensions and signal installations by the Department
are to be financed by the city general fund, subject
to material and installation costs at the time of
installation
(4) Payment of charges Bills for traffic signal energy
consumption and equipment rental shall be rendered by
the Light and Power Department and paid by the city at
the end of each month Monthly billings shall be based
on the inventory of completed installations at the time
of billing
I Electric Rates Gencral Service Rules and Regulations The
rules and regulations applicable to electric service and persons
receiving electric service from the City of Fort Collins shall
be such rules and regulations as are adopted by the Department
of Municipal Public Utilities and approved by resolution of
the Council of the City of Fort Collins Upon such adoption
and approval all such rules and regulations shall be in full
force and effect and shall apply to any person, corporation
or other entity receiving electric service from the city
-11-
L
Section 2 That Section 112-121 of the Code of the City of Fort
Collins be and the same hereby is amended by deletion thereof and by
substituting therefor the following
Interference with meters prohibited
No person shall willfully injure alter or in any manner
interfere with or obstruct the action or operation of any
meter provided for measuring or registering the amount of
electricity passing through it without the knowledge and
consent of the Department of Municipal Public Utilities
It shall be unlawful to remove electric meters and to
break electric meter seals
Section 3 That Section 112-123 of the Code of the City of Fort
Collins be and the same hereby is amended by deletion thereof and by
substituting therefor the following
Prima facie evidence of violations
Proof of the existence of any wire connection or of any
injury alteration or obstruction of a meter as provided
in Section 112-119 to 112-122 above shall be taken as prima
facie evidence of the guilt of the person in possession of
the premises where such connection injury alteration or
obstruction is proved to exist Such evidence shall be
just cause for the immediate discontinuance of electric
service without notice
Introduced, considered favorably on first reading, and ordered
published this 216' day of J, ,A W A D 1975 and to be presented
for final passage on the � day of Februar4 , A D 1975
ATTEST
Ma
TitY Clerk L/
A D 1975 Passed and adopted on final reading this day of�rcc/�
ATTEST
M /