HomeMy WebLinkAbout023 - 03/15/1977 - ASSESSING THE COST OF IMPROVEMENTS IN STREET IMPROVEMENT DISTRICT NO 69 LEAP - ELIZABETH TO RIVERSIDE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE
Page 2 of 4
NAME AMID ADDRESS DESCRIPTION AM1XNT A4O NT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $10 3289 @ $ 9 3172
Rainey, Robert L Com 30 ft W & 167 8/12 ft S of NE cor of SE of $3,343 16 $3,015.70 $ 6,358 86
Virginia H NE 13-7-69, W 615 8/12 ft, S 311 2/12 ft, New Driveways + 877.61
700 Dawn Ave E 617 ft to cc rd, N 323 8/12 ft to POB, $ 7,236.47
Fort Collins, Colorado 80521 FTC.
97131-00-027
FRONTAGE IN FEET 323 67
D & E Investment Company Beg at pt 549 12 ft N & 30 ft W of SE oor $ 929 60 $ 838 55 $ 1,768 15
300 Vallejo of NE 13-7-69, th N 89 38' W 151 ft, S 0 New Driveway + 245 88
Denver, Colorado 80200 25' W 99 12 ft, N 89 38' W 479 ft, N 0 25' One sewer service stub + 190 00
97131-00-046 E 189 12 ft, S 89 38' E 630 ft, S 0 25' W
FF Nn GE IN FEET 90 0 90 ft to beg, FTC $ 2,204 03
Nelbar, Inc Beg at pt 100 ft W of E 1/4 oor 13-7-69, th $ 619 73 $ 559 03 $ 1,178 76
1080 E Elizabeth W 110 ft, N 200 ft, E 180 ft, S 60 ft, W New Driveway + 266.13
Fort Collins, Colorado 80521 70 ft, S 140 ft to beg, FTC less Bk 1694 $ 1,444 89
97131-00-051 Pg 673
FROWAGE IN FEET 60 0
First National Bank Beg at 1/16th cor known as NE oor of SE of $1,494 18 $1,347 83 $ 2,842.01
ATTN• Trust Dept NE 13-7-69 wh bears N 0 25' E 1319 93 ft New Driveway + 665 54
205 W Oak from E 1/4 cor, th S 0 25' W 167 67 ft, N
Fort Collins, Colorado 80521 89 38' W 238 ft, N 0 25' E 160 ft, S 89 38' One sewer service stub + 190 00
97131-00-005 E 67 ft, N 0 25' E 157 77 ft to swrly In $ 3,697.55
F%NTAGE IN FEET 144 66 Riverside Ave, S 48 2131' E 227 53 ft to
beg, exc erly 30 ft co rd & less Bk 1109
Pg 307, FTC
D & E Investment Company Com at a pt 30 ft W & 639 12 ft N of SE cor $1,926 86 $1,738 12 $ 3,664.98
300 Vallejo of NE 13-7-69, th W 630 ft, N 31 05 ft, E 14 New Driveway + 439.28
Denver, Colorado 80200 1/3 ft, N 168 ft to cen to ditch, th E 615 78 One water service stub + 145.00
97131-00-006 ft alg ditch to co rd, S 186 55 ft to POB, $ 4,249 26
FROt?WE IN FEET 186 55 FTC
I
I
r �
ORDINANCE NO 23 , 1977
BEING AN ORDINANCE ASSESSING THE COST OF IMPROVE-
MENTS IN STREET IMPROVEMENT DISTRICT NO 69 AND
PROVIDING FOR THE PAYMENT AND COLLECTION THEREOF
WHEREAS, heretofore by appropriate ordinances and
resolutions duly adopted by the Council of the City of Fort
Collins, there was established Street Improvement District
No 69 for the purpose of installing curb, gutter, sidewalk,
asphalt pavement and street lighting on certain streets and
alleys in the City of Fort Collins, Colorado, all pursuant
to Chapter 16 of the Code of the City of Fort Collins, and
WHEREAS, pursuant to said ordinances and resolutions,
said improvements have been installed and accepted by the
City of Fort Collins, Colorado, and
WHEREAS, upon accepting said improvements, the City
Council adopted the report of the City Engineer respecting
the cost of such improvements and the schedule of assessments
prepared by the City Engineer and ordered notice to be
published as provided in Chapter 16 of the Code of the City
of Fort Collins, which said notice was duly published as
therein provided, and
WHEREAS, March 1, 1977, is the date set for the hearing
of complaints and objections and the determinations of the
same and for acting upon an ordinance assessing the cost of
such improvements, and
WHEREAS, all complaints and objections in writing filed
by property owners within the District have been considered
by the City Council.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE
CITY OF FORT COLLINS
t
i r
Section 1 That the total cost of the improvements in
Street Improvement District No 69, including the cost of
engineering, legal, publication, interest during construction
and collection, to-wit $894 , 522 78, less the portion of
said cost to be paid by the City of Fort Collins , to-wit
1�504 887 18 is hereby assessed upon the real estate in said
District in accordance with the provisions of Chapter 16 of
the Code of the City of Fort Collins, and the proportion of
said costs assessed upon each lot or tract of land in said
District shall be as follows
-2-
LEMAY - ELIZABETH TO RIVERSIDE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 4
NAME AND ADDRESS DESCRIPTION AM)UNT AMXNT 'TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUPTER
@ $ 103289 @ $ 93172
Michaels, E P/Thanet S Considering the W In of NW 18-7-68 as $3,013 36 $2,718 20 $ 3,542 99,
1609 Mathews bearing N & S & with all bearings herein New Driveway + 453 45
Fort Collins, Colorado 80521 relative thereto com at pt 1250 2 ft N $ 3, 996 43
87182-00-037 & 30 ft E of W h oor of sd sec 18, th S
FRONTAGE IN FEET 291 74 350 ft, th E 133 9 ft to pt wh is wrly 50
ft radially from C/L of spur track of UP
RR entering the former Roundhouse bldg, th
nwrly alg a cur to L rad of wh is 1549 ft,
50 ft from & para to C/L of sd spur track
368 ft M/L to POB, FTC
Jesser, Frank H/Prancis B Can at pt N 750 20 ft fran W 34 cor 18-7-68, $1,549 32 $1,397 58 $ 2,946 90
823 E Elizabeth St th N 150 ft, E 163 90 ft, srly 8 23' E New Driveway + 374 58
Fort Collins, Colorado 80521 151 62 ft, W 186 01 ft to beg, FTC One sewer service stub + 190 00
87182-00-044 $ 3,511 48
FRONTAGE IN FEET 150 0
Poudre Stations, Inc Tr in SW 'h NW 4 of 18-7-68, beg at pt wh $1,652 62 $1,490 75 $ 3,143 37
Boat 495 is N 89 15' E 50 ft from SW cor of NW ke of Credit for 160 LF of VC & - 1,415 23
Fort Collins, Colorado 80521 sd sec 18, (sd pt being part of intsec of G & Walk
87182-00-064 E In of Lamy Ave & N In of Eliz St, FTC) $ 1,728 14
FRONTAGE IN FEET 160 0 th alg E In of Lamy Ave N 0 06' E 160 ft,
N 89 15' E 150 ft, S 0 06' W 160 ft to N
In of E11z St, th alg N In of E11z St,
S 89 15' W 150 ft to POB, FTC
R X Lands Tr in NW 4 of 18-7-68, beg at pt wh bears
c% Ttmbleson, Bryce N 0 06' E 160 ft from W # cor of sd sec 18, $3,875 51 $3,495 91 $ 7,371 42
2604 Harvard Ave th N 0 06' E 590 21 ft alg sd W In of sd
Fort Collins, Colorado 80521 NW ;4 th S 89 54' E 186 01 ft, S 08 17' E
87182-00-075 151 78 ft, S 89 54' E 101 08 ft, S 01 40'
FRONTAGE IN FEET 375 21 57" W 295 70 ft, S 89 15' W 101 08 ft, S
0 06' W 140 ft, S 89 15' W 200 ft to POB
less Sagebrush & less Lemay LTD 1st, FTC
i
! U
LEMAY - ELIZABEPH TO RIVERSIDE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 3 of 4
NAME AND ADDRESS DESCRIPTION ANDUNr AMOUNT TGTAL
FOR FOR ASSESSMENT
PAVEMENT N]T CURB AND
GUITER
@ $ 10 3289 @ $9.3172
Eggleston, Glenn/Marjorie Can 30 ft W & 450 ft N of SE cor of NE $1,023 80 $ 923 52 $ 1,947 32
907 State Street 13-7-69, W 151 ft, N 99 12 ft, E 151 ft, New Driveway + 222.77
Lamed, Kansas 67550 S 99 12 ft to beg, FTC One water service stub + 145 00
97131-00-007 One sewer service stub + 190 00
FRCNTAGE IN FEET 99 12 $ 2,505.09
Pope, Warren R/Alma Ruth Oan 350 ft N & 30 ft W of SE cor of NE $1,032 88 $ 931 72 $ 1,964.60
837 Lemay 13-7-69, rum W 630 ft, N 100 ft, E 630 New Driveways + 561.35
Fort Collins, Colorado 80521 ft, S to beg, FTC One sewer service stub + 190 00
97131-00-008 $ 2,715 95
FRONTAGE IN FEET 100 0
Harder, Paul F Can 30 ft W & 200 ft N of E 1/4 cor 13- $1,549 34 $1,397 58 $ 2,946 92
Conlon, Robert M 7-69, W 355 1/2 ft, N 150 ft, E 355 1/2 New Driveway + 213 46
1032 Luke Street ft, S 150 ft to beg, FTC One 6" sewer service stub + 190.00
Fort Collins, Colorado 80521 One 2" water service stub + 582 17
97131-00-009 $ 3,932 55
FF0NTAGE IN FEET 150 0
Randleman, Gertrude D Can at a pt 30 ft W of E 1/4 cor 13-7- $1,446 05 $1,304 41 $ 2,750 46
1090 E Elizabeth 69, th W 70 ft, N 140 ft, E 70 ft, S Credit for 140 LF of C & G - 1,238 33
Fort Collins, Colorado 80521 140 ft to beg, FTC & W
97131-00-010 One sewer service stub + 190 00
FRONTAGE IN FEET 140 0 $ 1,702 13
Crauningham, Wayne E Ict 1, Ikgey LTD 1st, FTC
Hancock, William R $ 774 66 $ 698 79 $ 1,473 45
816 I may Ave Credit for 75 LF of ex C & - 663 39
Fort Collins, Colorado 80521 G & W
87182-11-001 Credit for streetlight payment- 37 73
FRONTAGE IN FEET 75 0 $ 772 33
I
STREET 114PROVEMENT DISTRICT NO 69 ASSESSMENT ROLE
IEI+A.Y - ELIZABEi'H TO RIVERSIDE Page 4 of 4
NAME AND ADDRESS DESCRIPTION AMOUNT ANDUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $10 3289 @ $ 9.3172
Frick & Frack, Inc Lot 1, Sagebrush, FTC $1,446 04 $1,304 41 $ 2,750 45
Hasler, T W Credit for streetlight payment- 70 43
Po Box 433 credit for 139 IF of C & G & W-1,229 48
Fort Collins, Colorado 80522
87182-06-001 $ 1,450 54
FRONTAGE IN FEET 140 0
Total Assessable $148, 518 26
City of Fort Collins Non-Collectable Assessments ••$ -0-
Construction Cost $ 69 , 378 37
TOTAL COST OF STREET $117,896 63
I
' LEMAY - STUART M PROSPECT STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE
Page 1 of 3
NAME AND ADDRESS DESCRIPTION AMOUNT AMDUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $10 43668 @ $ 8 91418
Spring Creek Farms, Inc Beg at W 1/4 oor 19-7-68, th N 1348 4 $1,529 39 $1,306 28 $ 2,835.67
1744 Lemay ft to TPOB, th E 224 84 ft, th N O1 54' W Credit for 16 LF of walk - 73.38
Fort Collins, Colorado 80521 141 62 ft, th N 88 22' W 220 23 ft, th S not constructed $ 2,762.29
87190-00-014 A to POB, FTC
F%2dIIGE IN FEET 146 54
nternatinnal Investment Beg at W 1/4 cor 19-7-68, th N 1348 4 ft,
Perks, B & Waferration E 224 84 ft, N O1 54' W 141 62 ft, N 88 22' New Dr 58 $1,822 33 $ 3,870 91
Perkins,
2055 S Lxust #117 W 220 23 ft, N 202 99 ft, E 372 79 ft, S 56 New Driveways + 70 38
Denver, Colorado 80222 0' E 153 46 ft, S 295 ft, E 451 38 ft, th alg $ 4,826 29
87190-00-016 arc of 424 14 ft rad cur to R 233 18 ft lg
FRONTAGE IN FEET 204 43 chord of wh bears S 74 15' E 230 26 ft, S
58 30' E 375 19 ft, th alg arc of 560 ft rad
cur to L 302 96 ft, lg chord of wh bears
S 73 59' E 299 29 ft, S 89 29' E 645 55
ft, S 87 31' E 164 95 ft, S 0 06' W 956 70
ft, S 89 49' W 2589 22 ft to POB
International Investment Beg at NW cor 19-7-68, th N 89 41' E 1497 15 $6,278 50 $5,362 59 $ 11,641.09
c% Perkins, B & Waferration ft, S 0 18' E 90 ft, th alg arc of 400 ft rad New Driveway + 223 32
2055 S Iocust #117 cur to R 230 38 ft, lg chord of wh bears S $ 11,864 41
Denver, Colorado 80222 16 11' W 227 21 ft, S 32 41' W 68 61 ft, S
97190-00-016 87 10' W 182 25 ft, S 65 30' W 547 ft, S 56
' R24TAGE IN FEET 601 58 0' W 273 ft, N 53 40' W 291 ft, S 69 30, W
' 274 ft N 670 ft to POB (90 3513 acres M/L)
less Bk 1533 Pg 846 less Spring Creek Village,
FvfC, less 1681-749
Urban Development & et al Lot 1, Spring Creek Village 2n3, F'iC
$2,987 62 $2,551 95 $ 5,539 77
c/o Related Housing
405 Park Avenue
New York, New York 10022
87192-07-001
F'RCNTAGE IN FEET 286 28
LEMAY - STUART TO PROSPECT STREET DIP%JVEMENT DISTRICT' NO 69 ASSESSN= ROLE Page 2 of 3
NAME AND ADDRESS DESCRIPTION AM= A4DUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $10.43668 @ $8 91418
Schrader, Wayne K E 118 65 ft of N 140 ft of Lot 5, E acres, $1,148 03 $ 980 56 $ 2,128 59
PO Box 495 FTC Credit for 110 IF of ex C - 972 97
Fort Collins, Colorado 80521 & G & W $ 1,155 62
97241-05-001
FRONTAGE IN FEET 110.0
Johnson, Duane K/Esther M Tr 6 less E 207 27 ft of N 78 ft, E acres,
1623 Lemay FIC $ew Dr 57 $1,399.53 $ 3,643 10
Fort Collins, Colorado 80521 New Driveways + 643 90
97241-06-006 $ 3,682 00
FRCNTAGE IN FEET 157 0
Laufer, David/Pauline The S 120 ft of E 207 3 ft of Lot 5, E acres, $1,252 41 $1,069 70 $ 2,322 11
1607 Lamy FTC Credit for ex C & G - 511 06
Fart Collins, Colorado 80521 New Driveway + 198 83
97241-06-016
FRONTAGE IN FEET 120 0 $ 2,009 88
Stephens, Vernon E Por of tr 7, E acres, FTC, beg at pt wh $ 923 12 $ 788 46 $ 1,711 58
Margie E bears S 495 ft & again N 89 59' W 30 ft, fran New Driveway + 171 39
621 E Iowa NE cor of sec 24 & th N 89 591 W 168 17 ft,
Rapid City, South Dakota 57701 S 0 02' W 110 32 ft, N 82 09' E 169 83 ft, $ 1,882 97
97241-06-028 N 87 07 ft, to POB
I7TAGE IN FEET 88 45
Jacobsen, Earl J/Sybel A E 207 27 ft of N 78 ft of tr 6, E acres, $ 814 06 $ 695 31 $ 1,509 37
Allen, Steven D FTC New Driveway + 303 45
1619 Lsmy $ 1,812 82
Fort Collins, Colorado 80521
,97241-06-030
FRONTAGE IN FEET 78 0
J
LEMY - STUART TO PROSPECT STREET INIPF2l7VEIIENT DISTRICT' NO 69 ASSESSMENT ROLE
Page 3 of 3
NAME AND ADDRESS DESCRIPTION AMXNr A4YM TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $10 43668 @ $8 91418
Geriatrics, Inc Lot 1, Replat of Springmeadows on Spring $6,578 35 $5,618 70 $ 12,197 05
PO Boa 1448 fix, FTC Credit for streetlight payment- 317 11
Greeley, Colorado 80631 Credit for ex C & G & W -4,484 52
97241-15-001 $ 7,395 42
FPLNPAGE IN FEED 630 31
Hahn, Jack R/Donna L Lot 2, replat of Springmeadows on Spring $ 631 42 $ 539 31 $ 1,170 73
1639 Lenny Avenue Creek, FTC
Fort Collins, Colorado 80521
97241-15-002
FROI7PAGE IN FEET 60 50 Total Assessable $ 44,102.20
City of Fort Collins Non-Collectable Assessments $ -0-
Construction Costs $ 57, 749 98
TOTAL COST OF STREET ..$101,852 18
t
a
y
LEMAY - DARfl4DLM TO STUART STREET IMP%JVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 1
NAME AND ADDRESS DESCRIPTION AM)UNT + AMWNT TI )TAL
FOR MR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $ 12 56198 @ $4 71673
International Investment Beg at W 1/4 cor 19-7-68, th N 1348 4 ft, $10,971 63 $ 4,119.59 $ 15,091 22
Perkins, B & Wafferration E 224 84 ft, N O1 54' W 141 62 ft, N 88
2055 S Locust #117 22' W 220 23 ft, N 202 99 ft, E 372 79 ft,
Denver, Colorado 80222 S 56 0' E 153 46 ft, S 295 ft, E 451 38
87190-00-016 ft, th alg arc of 424 14 ft rad cur to R
FF NTACE IN FEET 873 4 233 18 ft lg chord of wh bears S 74 15' E
230 26 ft, S 58 30' E 375 19 ft, th alg arc
of 560 ft rad cur to L 302 96 ft, lg chord
of wh bears S 73 59' E 299 29 ft, S 89
29' E 645 55 ft, S 87 31' E 164 95 ft, S
0 06' W 956 70 ft, S 89 49' W 2589 22 ft
to POB
First Assembly of God Beg at pt N 873.40 ft & E 50 ft from W $ 5,087 60 $ 1,910 28 $ 6,997 88
Church 1/4 cor 19-7-68, th N 390 ft, th alg arc of Less credit for low valuation -1,997 88
525 W Oak a 15 ft rad cur to R 23 56 ft, the lg chord
Fort Collins, Colorado 80521 wh bears N 45 0' E 21 21 ft, th E 425 ft, $ 51000 00
87190-00-019 th alg arc of a 15 ft rad cur to R 23 56
F%NTAGE IN FEET 405 0 ft, th lg chord wh bears S 45 0' E 21 21
ft, th S 115 ft, th alg arc of a 180 30
ft rad cur to R 97 55 ft, th lg chord wh
bears S 15 30' W 96 37 ft, th S 31 0' W
308 ft, th N 59 0' W 158 96 ft, th W 134 36
ft to POB, FTC (cont 4 048 acres M/L)
I
I
Total Assessable $ 20,091 22
City of Fort Collins Non-Collectable Assessments ... $ 1,997.88
Construction Costs $ 4,056.92
TOTAL COST OF STREET $ 26,146 02
I
RIVERSIDE - MULBERRY TO LEMAY STREET 1MPR7VfT`ENT DISTRICT NO 69 ASSESSMENT ROLE
Page 1 of 1
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GOITER
@ $10 67296 @ $8 91862
a
S
First National Bank Beg at 1/16th cor known as NE cor of SE of $ 368 54 $ 307.96 $ 676 50
AWN Trust Dept NE 13-7-69 wh bears N 0 25' E 1319 93 ft from
205 W Oak E 1/4 cor, th S 0 25' W 167 67 ft, N 89 38' W
Fbrt Collins, Colorado 80521 238 ft, N 0 25' E 160 ft, S 89 38' E 67 ft,
97131-00-005 N 0 25' E 157 77 ft to swrly In Riverside Ave,
FRONTAGE IN FEET 34 53 ft S 48 211�' E 227 53 ft to beg, exc erly 30 ft
co rd & less Bk 1109 Pg 307, FTC
Thmipson, Alfred D, Jr Tr in 13-7-69, beg at a pt wh bears S 0 25' W -0- $1,529.10 $ 1,529.10
Helen S 167 67 ft & again N 89 38' W 238 ft from
712 Oxford Lane 1/16th oor known as NE cor of SE of NE of sec Credit for existing C & G & W - 633 67
Fort Collins, Colorado 80521 13, wh sd 1/16th oor bears N 0 25' E 1319 93 New Driveways + 238 06
97131-00-045 ft from E 1/4 cor sec 13, N 89 38' W 405 77
FRONTAGE IN FEEL 17d. 45 ft ft, N 0 25' E 210 ft, S 89 42' E 331 40 ft, Credit for street light payment- 86 26
N 0 54' E 229 75 ft, S 48 21' 30" E 171 45 ft, $ 1,047.23
S 0 42' W 170 70 ft, N 89 44' 10" W 54 66 ft,
S 0 25' W 156 ft to pob, FIC,
Miller, James A/Irving Beg at NE oor of SE of NE 13-7-69 wh bears $1,453 55 $1,214 63 $ 2,668.18
2260 W Elizabeth N 0 25' E 1319 93 ft from E 1/4 cor sec 13, New Driveways + 752 68
Fort Collins, Colorado 80521 N 89 34' 20" W 171 ft N 0 25' E 170 70 ft to
97131-00-049 swrly In of Riverside Ave, S 48 21h' E 241 25 One sewer service stub + 190 00
1 FRMCAGE IN FEET 136 19 ft ft to beg, exc E 30 ft for co rd, FIC Credit for irregular lot -1,203 62
$ 2,407 24
Total Assessable $ 4,130.97
City of Fort Collins Non-Collectable Assessments .. $ 1,203 62
Construction Costs . . $ 31,167.87
iTOTAL COST OF STREET $ 36,502 46
I
STREET IMPR[.WEMENT DISTRICT NO 69 ASSESSMENT ROLE
RIVERSIDE - LEMAY TO PROSPECT Page 1 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GLITTER
@ $9 66403 @ $9 17722
Betz, E R/Helen I Beg at pt on E In of Co Rd R/W wh pt bears $10, 843 81 $10, 297 58 $21, 141 39
Johnson, Don N 89 08' E 30 ft fran W 1/4 cor 18-7-68, th
290 Rossmoore Leisure Wld alg sd R/W In, N 900 20 ft, E 133 90 ft to
Mesa, Arizona 85206 W In of R/W of UP spur track, th alg sd In
87182-00-035 S 08 23' E 303 33 ft, E 101 40 ft to E In of
FRCNPAGE IN FEET sd R/W, th N 08 23' W 126 51 ft, E 615 77 ft
W. side Riverside = 493.58' to swrly In of R/W of FTC branch of UP RR,
E side Riverside = 528 50 th alg sd In S 61 42' E 1897 60 ft, S 0 03'
E 431 54 ft, N 64 50' 30" W 1471.81 ft S 89
08' W 1215.92 ft to pob less 12 ft easement
as in Bk 1105 Pg 395, less Betz 1st & less
the fol Bks & Pgs 1044-147, 1401-827, 1418-
525, 1421-241, 1440-651 & 1442-336, FTC, also
beg SW oor of NW 1/4 18-7-68, th N 150 ft, E
1245 92 ft, S 150 ft, W 1245 92 ft to beg
less st, less Riverside 1st, 2nd, 3rd, & 5th
& less the fol Bks & Pgs 1366-927, 1401-827,
1421-241, 1429-779, 1440-651, 1520-408, 1591-
221 & 1621-453, FTC
Sandler, Lawrence/Samuel Beg at pt wh bears N 725 21 ft & again E $ 2,838.13 $ 2,695 17 $ 5,533 30
Box 2147 272 71 ft from W 1/4 oor of 18-7-68, th E
Denver, Colorado 80201 79.77 ft, N 31 24' 30" E 228 83 ft to pt on New Driveways + 900 99
87182-00-036 swrly In of Riverside Ave, ext, th alg sd $ 6,434 29
FR7MT M IN FEET 293 68' swrly In on arc of 1171 ft rad cur to R
272 48 ft the lg chord of wh bears N 56 06'
30" W 271 88 ft, th alg sd swrly In N 49
26' 30" W 23 52 ft, S 83 49' W 7 72 ft,
S 08 14' E 365 ft to pob (1 130 acres MA) ,
F1C
i ��
i
STREET II-TFMEMENT DISTRICT NO 69 ASSESSMENT ROLE
RIVERSIDE - LF2'Y�Y lU PROSPFF)✓TT Page 2 Of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AM)UDPT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $9 66403 @ $9 17722
Well, Donald B Beg at pt on S In of NW 18-7-68 wh bears $ 2,342 17 $ 2,224.19 $ 4,566 36
Wilmarth, Elery N 89 15' E 750 ft from W 1/4 cor, th N 0 06'
PO Box 506 E 160 ft, N 89 15' E 431 56 ft to pt on wrly
Fort Collins, Colorado 80521 side Riverside Ave, th alg sd wrly side on
87182-00-073 arc on a 676 62 ft rad cur to L, 17 27 ft lg
FIgNTAGE IN FEET 242 36 chord of wh bears S 62 20' 52" E 17 27 ft, th
alg wrly In of McHugh St S 26 51' 30" W
171.27 ft to on S In sd NW, S 89 15' W 369 76
ft to pob, FLC & also beg at pt on S In of
NW 1/4 of 18-7-68 wh bears N 89 15' E 700 ft
from W 1/4 cor of sd sec 18, th N 0 06' E
300 ft, N 89 15' E 304.54 ft to wrly side of
Riverside Ave, th alg sd wrly side on arc of
676 62 ft rad cur to L 225 09 ft, lg chord of
wh bears S 52 05' E 224 06 ft, S 89 15' W
431 56 ft, S 0 06' W 160 ft, S 89 15' W 50 ft
to pob, FM less E Elizabeth & less the fol
Bks & Pgs 1509-119, 1554-429, 1564-523 &
1658-498
Collins Cashway Lumber, Inc All Riverside 1st, FTC $ 3,480 40 $ 3,305 08 $ 6,785 48
1200 Riverside Credit for 360 14 LF of C,G,W -3,185 51
Fbrt Collins, Colorado 80521 Credit for Streetlight Payment- 181 19
87182-07-001
FRONTAGE IN FEET 360 14 $ 3,418 78
Fort Collins Newspapers, Inc Lots 1 thru 3, Riverside 2nd, FIC $ 5,571 60 $ 5,290 94 $ 10,862 54
PO Box 1577 Credit for 576 53 LF of C,G,W- 5,099 52
Fort Collins, Colorado 80522
87182-09-001 Credit for 1257 65 SY of
FXNTACE IN FEET 576 53 2" asphalt & 7" base - 4,326 07
Credit for streetlight Payment- 290 05
$ 1,146 90
Page
RIVERSIDE - LFI4a,Y TO PROSPECT STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Pa 3 of 8
NAME AND ADDRESS DESCRIPTION AMRINT AMANT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $9 66403 @ $9 17722
Fort Collins Glass & Paint Co Lot 1, Riverside 5th, FTC $ 1,014 72 $ 963.61 $ 1,978 33
139 Linden
Fort Collins, Colorado 80521 New Driveways + 440 11
87182-13-001 $ 2,418.44
FRONTAGE IN FEET 105 00
Fart Collins Glass & Paint Co Lot 2, Riverside 5th, FTC $ 289.92 $ 275 32 $ 565.24
139 Linden
Fort Collins, Colorado 80521
87182-13-002
FF4NTAGE IN FEET 30 00
Benedict Upholstery Lot 3, Riverside 5th, FTC $ 289 92 $ 275 32 $ 565 24
1320 Riverside
Fort Collins, Colorado 80521 Credit for streetlight payment - 15 09
87182-13-003 $ 550 15
FRONTAGE IN FEET 30 00
Benedict Upholstery Lot 4, Riverside 5th, FTC $ 1,015 78 $ 964 62 $ 1,980 40
1320 Riverside New Driveways + 509 46
Fort Collins, Colorado 80521 Credit for streetlight payment - 52.88
87182-13-004
FRONTAGE IN FEET 105 11 $ 2,436 98
Betz, E R/Helen I All Riverside 3rd, FTC $14,242.27 $13,524 83 $ 27,767 10
Johnson, Don Credit for low valuation -18,800 44
290 Rossmoore Leisure Wld
Mesa, Arizona 85206 $ 8,966 66
87183-15-001
FRONTAGE IN FEET 1473 74
i
RIVERSIDE - LEMAY TO PROSPECT STREET II11PIbOVEMSr DISTRICT NO 69 ASSESSMENT ROLE Page 4 of 8
NAME AND ADDRESS DFSCRIPTICN AMOUNT AM(A]NT j TOM
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $ 9 66403 @ $ 9 17722
Stave-It Venture, LTD o m fran S 1/4 cor 18-7-68, th N 88 59' $ 2,066 75 $ 1,962 64 $ 4,029 39
PO Box 1481 04" E 1050 95 ft, th N 811 47 ft, th N
Fort Collins, Colorado 80522 83 52' 40" E 10 06 ft to pob, th N 213 86 New Driveways + 747.50
87184-00-002 ft, th E 373 37 ft to W In of UP RR; th $ 4,776.89
FRONTAGE IN FEET 213.86 S 9 15' 30" E 173 52 ft, th S 83 52' 401; W
403 38 ft to pob
Pc,--ze Plastics, Inc Beg at pt wh bears N 88 59' 40" E 1050 95 $ 1,364.47 $ 1,295 73 $ 2,660.20
1626 Riverside ft, N 0 03' 20" W 1026 39 ft from S 1/4
Fort Collins, Colorado 80521 cor 18-7-68, th N 0 03' 20" W 20.74 ft, th New Driveways + 425.37
87184-00-008 alg arc of 995 ft rad cur to L 119 26 ft $ 3,085.57
FRONTAGE IN FEET 141 19 the lg chord of wh bears N 03 29' 20" W
119 18 ft, N 83 04' 40" E 321 74 ft, S 16
i 03' 20" E 185 36 ft, S 89 56' 40" W 363.37
ft to pob, FTC.
4
Prospector Group, Inc Beg at pt N 0 03' 50" W 1202 47 ft fzun S $ 5,897 86 $ 5,600 77 $ 11,498.63
P 0 Box 280 1/4 cor 18-7-68, th N 0 03' 50" W 1002 15
Fort Collins, Colorado 80521 ft, S 63 21' 20" E 559 49 ft, th alg arc of '
87184-00-010 995 ft cur to R 1038 30 ft, lg chord of wh bears
FRONTAGE IN FEET 610 29 S 33 37' 40" E 991 84 ft, th S 89 56' 40" W
469 76 ft, N 73 59 ft, W 579 27 ft to pob,
cunt 17 885 acres M/L less Prospect Est 3rd
& less Eastgate 1st, F7C.
-r
RIVERSIDE - LEMAY ID PRDSPECP STREET DTR0VEMU DISTRICT NO 69 ASSESSMENT ROLE Page 5 of 8
NAME AND ADDRESS DESCRIPTION AMXW A147UPPr TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
_ @ $9 b6403 @ $9 17722
Fort Collins N O Nelson Co Tr in SE 1/4 18-7-68 beg at pt on early ln $ 2,367 49 $ 2,248 24 $ 4,615 73
PO Box 527 of Riverside Ave wh bears N 88 59' 40" E New Driveway +1,882 45
Fort Collins, Colorado 80522 1050.95 ft & again N 0 03' 20" W 1047 13 ft
87184-00-013 & again N 03 29' 20" W 119.18 ft & again N $ 6,498 18
FRMnMGE IN FEET 244 98 83 04' 40" E 10 ft frcm S 1/4 cor, th alg
sd erly ln alg arc of 1005 ft rad cur to L
244 98 ft, th lg chord wh bears N 13 54' 20" W
244 98 ft; th N 70 49' 20" E 270 81 ft to pt
on wrly R/W ln of UP RR, th alg wrly In alg arc
of 1587 28 ft rad cur to R 315 89 ft, th lg
chord wh bears S 24 52' 05" E 315 36 ft, th
S 83 04' 40" W 332 11 ft to pob, FTC
Prospector Group, Inc Tr 'A' & 'B' , Eastgate 1st, FTC $ 6,830 44 $ 6,486 37 $ 13,316 81
PO Box 280
Fort Collins, Colorado 80521
87184-07-001
FR27MM IN FEET
Tract "A" = 687.28
Tract "B" = 19 51
Public Service Cc of Tr in SE 1/4 18-7-68, County of Iaruner, wh $ 7,354 24 $ 6,983 77 $ 14,338 01
Colorado considering S In of sd SE 1/4 as N 88 59' 40" E Credit for existing C,G,W & - 2,498 53
209 S Meldrnm and all bearings relative thereto, is contained Drive
Fort Collins, Colorado 80521 within lines wh begin at pt wh bears N 88 59'
87184-00-006 40" E 1050 95 ft from SW cor of sd SE 1/4 and New Driveways + 1,098 71
FRC DYM IN FEET 760 99 th N 88 59' 40" E 420 06 ft to pt on wesrly ROW Credit for 746 01 Sy of 2" - 2,566 13
]n of the UP RR, th N 0 03'20" W 680 43 ft along asphalt & 7" base
sd wesrly ROW ln, th alg the arc of a 1587 28 ft $ 10,372 06
radius curve to L 168 07 ft, the ing chord bears
N 03 05' 20" W 167 99 ft alg sd wesrly ROW ln,
th S 83 52' 40" W 420 00 ft, th alg the arc of
3-167 28 ft rad curve to R 123 60 ft, the long
chord bears S 03 05' 20" E 123 54 ft, th S 0
03' 20" E 687 39 ft to pt of begin, Can 8 0008
acres, M/L & sub to RW Co Rd on southerly 30 ft
I
STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE
RIVERSIDE - LEMAY TO PROSPECT STREET 6 of 8 �
y
NAME AND ADDRESS DESCRIPTION AMOUNT A 4OLM TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND A
GUI=
$9 66403 @ $9 17722
Collins Cashway Lurber Co All of Riverside 6th subd $ 1,450 19 $ 1,377 13 $ 2,827.32
1200 Riverside Ave
Fort Collins, Colorado 80521 New Driveways + 268.88
87182-14-001 $ 3,096.20
F%NTAGE IN FEET 150 06
Homoka, Gene/E Charlene lot 1, Riverside 4th subd $ 972 01 $ 923 04 $ 1,895.05
1400 longs Peak Dr Credit for 100 58' of C,G,W - 889.65
Fbrt Collins, Colorado 80521 Credit for streetlight payment- 50.60
87182-12-001
F%NTAGE IN FEET 100 58 $ 954.80
United Bank of Fort Collins Lot 2, Riverside 4th subd
401 S College Ave $ 2,187 55 $ 2,077 36 $ 4,264 91
Fort Collins, Colorado 80521
87182-12-002
FFCNTAGE IN FEED 226 36
Tleledyne Industries Inc lot 1, Teledyne Aqua Tec Subd 1730 E Prospect $10,462 10 $ 9,935 07 $ 20,397 17
Fort Collins, Colorado 80521 Credit for ex drives - 835 18
87184-00-007 New Drives + 939 88
FRCNCTTACE IN FEET 1,082 58 Credit for 909 23 SY of 2" - 3,127 57
asphalt & 7" Base
Riverside Ltd Lot 1-4, Riverside 7th Subd Credit for 419 52 IF of C & G- 1,786 65
Bob Martin $ 15,587.65
C Rhoades, Inc $ 1,183 65 $ 1,124 03 $ 2,307.68
Oak & Howes
Savings Bldg
Fort Collins, Colorado 80521
87184-09-001 thru 004
F NTAGE IN FEED 122 48
I
i
RIVERSIDE - LEMAY TO PROSPECT STREET INIPROVEVENT DISTRICT NO. 69 ASSESSMENT ROLE Page 7 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT 'DOTAL
FOR FOR ASSESSMENT
TT
PAVEMENT CURB AND
GUrrER
@ $ 9 66403 @ $ 9 17722
Sessions, H Ted & Lot 5-10, Riverside 7th Subd. $ 1,775.86 $ 1,686 41 $ 3,462.27
Rice, Edgar Jr.
420 Irish Dr
Fort Collins, Colorado 80521
87184-09-005 thri 010
Fr"WAGE IN FEET 183 76
Wright, Willard Lots 11-12, Riverside 7th Subd. $ 1,679 71 $ 1,595 09 $ 3,274.80
326 Walnut
Fort Collins, Colorado 80521
87184-09-011 & 012
FRONTAGE IN FEET 173 81
Billeter, Dwight & Jean Lot 13, Riverside 7th Subd. $ 839.90 $ 797 59 $ 1,637 49
154 Crestmore P1 Drive relocation + 65 99
Fort Collins, Colorado 80521 New Driveway + 418.21
87184-09-013 $ 2,121.69
ET40WAGE IN FEET 86 91
Murphy, Richard J, Lot 14, Riverside 7th Subd. $ 1,213 51 $ 1,152.38 $ 2,365 89
Ray, Keith W &
Michaels, Judy Meyer
7 i Lake Street
F�_c Collins, Colorado 80521
87184-09-014
FRONTAGE IN F= 125.57
Chapwan, Laurimere W. & Lots 15-24, Riverside 7th Subd. $ 3,021 94 $ 2,869 72 $ 5,891.66
Chapman, Katherine D.
1909 Yorktown
Fort Collins, Colorado 80521
87184-09-015 thru �� 70 EMUAGE IN FEET -- -
RIVERSIDE - LEMAY TO PROSPECT STREET IMPFCVEMENT DISTRICT NO 69 ASSESSMENT ROLE
Page 8 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMMYNT TOTAL
EDR FOR ASSESSMENT
PAVEMENT CURB AND
GLITTER
@ $9 66403 @ $9 17722
Murphy, Harry J Lots 25-30, Riverside 7th Subd $ 1,813 17 $ 1,721 83 $ 3,535 00
P O Box 280
Windsor, Colorado
87184-09-025 thru 030
FRiNTAGE IN FEET 187 62
Murphy, J.D Lots 31-34, Riverside 7th Subd $ 1,205 30 $ 1,144 58 $ 2,349 88
P.O. Box 280
Windsor, Colorado
87184-09-031 thru 034
FI%NTACE IN EEEL' 124 72
t
14 Investment Group All of Peverley's Riverside Subd $ 1,063 04 $ 1,009 50 $ 2,072.54
Mr Lee H Cooper New Driveway + 407 45
3706 Gull Way $ 2,479 99
Fort Collins, Colorado 80521
87183-16-001
F%NTAGE IN FEET 110 00 - - -
Total Assessable $15 , 288 751
City of Fort Collins Non-Collectable Assessments .$ 18,800.44
Construction Costs $11 3 14-9 36
TOTAL COST OF STREET $284,835.55
i
PROSPECT - LEMAY TO TDv=INE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 1 of 8
NAME AND ADDRESS DFSCRIPTION AMXNT AMOUNT TOTAL
FOR FUR ASSESSMENT
PAVEMENT CURB AND
GUTTER ;
@ $13 55499 @ $9 67861
Highlander Hts, Inc W 60 acres of S T of SW 18-7-68, less 2 41 $12,267 82 $ 8,759 53 $ 21,027 35
1404 Pitkin acre co rd, less bk 1065 pg 465, 1120-265, Credit for streetlight payment- 455 33
Fort Collins, Colorado 80521 1173-81, 1267-282 & less Highlander Hts llth
87183-00-001 & 12th, FX $ 20,572 02
FR(NTT.GE IN F1;ET 905 04
Ctevrcn Oil Company Beg at SW cor of 18-7-68, th N 0 0' E 160 $1,625 25 $ 1,160 47 $ 2,785.72
Property Tax & Insurance ft, N 89 42' 45" E para to S In of sd SW Credit for 119 9 IF of VC & - 1,060.54
PO Box 599 40 ft to E R/W In of Lemay St, the TPOB, th G & Walk
Denver, Colorado 80201 N 89 42' 45" E 120 ft, S 0 0' W 120 ft to N $ 1,725.18
87183-00-002 R/W In of Prospect St, th S 89 42' 45" W
FFaUAGE IN FEET 119 90 alg sd R/W In of Prospect St 99 90 ft, th
alg arc of 20 ft rad cur to R lg chord of wh
bears N 45 08' 40" W 28 36 ft, N 0 0' E
99 90 ft alg E R/W In of Lemay St to TPOB,
Fort Collins
Him, George L/Ooris K Lot 224, Highlander Hts llth, FTC $ 14459.47 $ 1,042 10 $ 2,501 57
1315 Kirkwood Credit for 107 67 LF of VC & - 952 36
Fort Collins, Colorado 80521 G & Walk
87183-05-224 Credit for streetlight payment- 54 17
FRONTAGE IN FEET 107 67 $ 1,495 04
Peak Land Investment, Inc Lot 237, Highlander Hts llth, FTC $ 1,457 17 $ 1,040 45 $ 2,497 62
5545 S Clarkson Credit for 107 5 IF of VC & - 950 86
Littleton, Colorado 80110 G & Walk
87183-05-237 Credit for streetlight payment- 54 08
FFtN1RkGE IN FEET 107 50 $ 1,492 68
Mcomb, Thomas M/Nancy D Lot 1, Prospect Est, FIC
1513 E Lake $ 2,373 89 $ 1,695 02 $ 4,068 91
Fbrt Collins, Colorado 80521 Credit to be paid by City - 4,068 91
87183-06-001 $ -0-
FFYNTAGE IN FEET 175 13
PAOSPE7CT - LE MAY TO TIMBEIU= STREET IMPFME!,1ENT DISTRICT NO 69 ASSESSMENT ROLE Page 2 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR MR ASSESSI=
PAVEMENT CURB AND
GUTTER
@ $ 13 55499 @ $9.67861
Weixelman, Donald B Lot 2, Prospect Est, FwIC
Diane G $2,372 13 $1,693.76 $ 4,065 89
1509 E Lake St Credit to be paid by City - 4,065 89
$
Fort Collins, Colorado 80521 -0
87183-06-002
FRCNTAGE IN FEET 175 00
Maciel, Gary E/Maxane I Lot 3, Prospect Est, FIC
1501 E Lake St $2,372 13 $1,693 76 $ 4,065 89
Fort Collins, Colorado 80521 Credit to be paid by City $- 4,065 89
$ -0 87183-06-003
FRONTAGE IN FEET 175 00
Peak Land Investment, Inc Lot 238, Highlander Hts 12th, FTC
5545 S Clarkson $1,518 17 $1,084.00 $ 2,602 17
Littleton, Colorado 80110 Credit for streetlight payment- 56 35
87183-13-238 $ 2,545 82
FRONTAGE IN FEET 112 00
Peak Land Investment, Inc Lot 245, Highlander Hts 12th, FIC
5545 S Clarkson $1,491 06 $1,064 65 $ 2,555 71
Littleton, Colorado 80110 Credit for streetlight payment- 55 34
87183-13-245 $ 2,500 37
FRXUAGE IN FEED 110 00 r
Peak Land Investment, Inc Lot 246, Highlander Hts 12th, FTC $1,565.61 $1,117 88 $ 2,683 49
5545 S Clarkson
Littleton, Colorado 80110 Credit for streetlight payment- 25.38
87183-13-246 $ 2,625.
FROWAGE IN FEET 115 50
I
I
PROSPECT - LEMAY TO TIMBERLINE STREET IIvIPFOVEMELN T DISTRICT' NO 69 ASSESSMENT ROLE Page 3 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR EK)R ASSFSS'4EPT
PAVEMENT CURB AND
GUTTER
@ $13 55499 @ $9 67861
v
Peak Land Investment, Inc Lot 253, Highlander Hts 12th, FTC
5545 S Clarkson $1,558.83 $1,113 04 $ 2,671 87
Littleton, Colorado 80110 Credit for streetlight payment - 57 86
87183-13-253
FRONTAGE IN FEET 115 00 $ 2,614 O1
Deuces, Maurice L Tr in N k of 19-7-68, beg at N 4 cor of sd $6,029 54 $4,305 24 $ 10,334 78
PO Box 1986 sec 19, th N 88 59 40 E & alg N In of NE
Fort Collins, Colorado 80522 4 of sd sec 19, 1321 73 ft to W R/W In of New Driveway + 264 69
87190-00-011 UP RR, th S 0 03' 20" E & alg sd W RM ln,
FRONTAGE IN FEET 444 82 413 24 ft, S 74 36' 40" W 790 81 ft, N 79 $ 10,599 47
16' 50" W 255.79 ft, N 86 32' 20" W 578 58
ft, N 55 54' 50" W 639 03 ft, N 0 18' 20" W
155 ft to N In of NW 4 of sd sec 19, th N
89 41' 40" E & alg N In of NW 4 of sd sec 19,
799 46 ft to POB, exc beg at pt. on N In of
NE 4 19-7-68 wh bears N 88 59' 40" E 1321 73
ft fmm N 34 cor of sec 19, th S 88 59' 40" W
310 78 ft , S 0 03' 20" E 493 29 ft, N 74
36' 40" E 322 21 ft to W R/W In of UP RR,
th N 0 03' 20" W alg sd " 413 24 ft to
POB, less Edora Acres 1st, ETC
Goble, Martin J Beg at pt on N In of NE h 19-7-68 wh bears $4,212 63 $3,007 92 $ 7,220.55
2410 Hawthorne N 88 59' 40" E 1321 73 ft from N � oor of
Boulder, Colorado 80302 sec 19, th S 88 59' 40" W 310 78 ft, S 0 03' ` Driveway + 272 43
87190-00-012 20" E 493.29 ft, N 74 36' 40" E 322 21 ft to $ 7,492 98
FRONTAGE IN FEET 310 78 W R/W In of UP RR, th N 0 03' 20" W alg sd
FVW 413.24 ft to POB, FTC
Sutherland Lumber Co Imes only on Lot 1, Union Pacific Sub #1, FTC $2,304 77 $1,645 65 $ 3,950 42
Attn Ray Borden Credit for streetlight payment - 85 54
4000 Main Credit for 170 03 IF of VC & -1,503 95
Kansas City, Missouri 64111 G & Walk
87191-07-004 $ 2,360 93
FRONTAGE IN FEET 170 03
PROSPECT - LEMAY TO TIMBERLINE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE Page 4 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR MR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $13 55499 @ $9 67861
International Investment Beg at NW oor 19-7-68, th N 89 41' E
Perkins, B & Waferration 1497,15 ft, S 0 18' E 90 ft, th alg arc $19,209 46 $13,716 05 $ 32,925 51
2055 S Locust #117 of 400 ft rad cur to R 230 38 ft, lg Credit for 1417 15 LF of
Denver, Colorado 80222 chord of wh bears S 16 11' W 227 21 ft, walk not constructed $- 6,499 62
87190-00-016 S 32 41' W 68 61 ft, S 87 10' W 182 25 $ 26,425.89
FRONTAGE IN FEET 1417 15 ft, S 65 30' W 547 ft, S 56 0' W 273 ft, =
N 53 40' W 291 ft, S 69 30' W 274 ft
N 670 ft to POB (90 3513 acres M/L) less
bk 1533 pg 846 less Spring Creek Village,
ETC less 1681-749
Sutherland Lumber Co InpS only on Lot 3, Union Pacific Sub
c/o Ray Borden #1, FTC $ 1,959 25 $ 1,398 95 $ 3,358 20
4000 Main Credit for 144 54 LF of Vc & - 1,278 49
Kansas City, Missouri 64111 G & Walk
87191-07-005 Credit for streetlight payment- 72 72
FRONTAGE IN FEET' 144 54 $ 2,006
Widener, Leland D/Amah D Lot 24 & N 7 ft of lot 23 Blk 1, Edora $ 1;491.06 $ 1,064 65 $ 2,555 71
305 Kuxra Place Acres lst Credit for 110 0 IF of VC & - 972.97
Boulder, Colorado 80302 G & Walk
87191-05-024 Credit for streetlight payment- 55 34
FR%TM IN FEET 110 00 $ 1,527 40
Werner, Otto/Jeanette J Lot 1, blk 2, Edora Acres 1st
1601 Edora Road $ 1,491 06 $ 1,064 65 $ 2,555 71
Fort Collins, Colorado 80521 Credit for streetlight payment- 55.34
87191-06-001 Credit for 110 0 LF of VC & - 972 97
PRONTA[E IN FEET 110 00 C & Walk $ 1,527 40
STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE
PROSPECr - LEMAY TO TIMBERLINE Page 5 of 8
NAME AND ADDRESS DESCRIPTION AMXW AMaM TCTTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $13 55499 @ $9 67861
Deuces Hone Inc Lot 7, blk 2, Edora Acres lst
517 W Drake Road $1,965 48 $1,403 40 $ 3,368.88
517 Drake, Colorado 80521 Credit for streetlight payment- 72 95
For87191-06-0n7 Credit for low valuation -1,845 93
FRONTAGE IN FEET 145 00 $ 1,450 00
Santini, Victor H Lot 8, blk 2, Elora Acres 1st, FTC $1,965 76 $1,403 59 $ 3,369 35
�Margaret H
1413 W Iake Credit for streetlight payment- 72 96
Fbrt Collins, Colorado 80521 $ 3,296 39
87191-06-008
FRONTAGE IN FEET 145 02
Hebbeln, James E Lot 1, blk 1, Edora Acres lst $2,033 26 $1,451 79 $ 3,485 05
1900 Mohawk Credit for streetlight payment - 75 47
Fbrt Collins, Colorado 80521 $ 3,409 58
87192-05-001
FRONTAGE IN FEET 150 00
Goble, Martin J Lot 3, partial replat of Flora Acres, $2,204 46 $1,574 03 $ 3,778 49
2410 Hawthorn 1st Credit for low valuation - 3,045 16
Boulder, Colorado 80302
87192-08-003 $ 733 33
FRONTAGE IN FEET 162 63
Goble, Martin J Lot 4, partial replat of Edora Acres, $1,756 87 $1,254 45 $ 3,011 32
2410 Hawthorn 1st Credit for low valuation $ -2,277 99
Boulder, Colorado 80302 $ 733 33
87192-08-004
FRONTAGE IN FEET 129 61
I
I
l '�
PROSPECT - LEMAY TO TINIDER1,NE STREET IMPROVEMENT DISTRICT NO 69 ASSESSMENT ROLE
Page 6 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $ 13.55499 @ $ 9 67861
Goble, Martin J Lot 6, partial replat of Edora Acres, $1,125 07 $ 803 33 $ 1,928 40
2410 Hawthorn 1st Credit for low vaulation -1,195 07
Boulder, Colorado 80302 $ 733.33
87192-08-006
FF42UAGE IN FEET 83 00
Goble, Martin J Lot 7, partial replat of Flora Acres, $2,452 92 $1,751 44 $ 4,204 36
2410 Hawthorn 1st Credit for low valuation - 3,471 03
Boulder, Colorado 80302
87192-08-007 $ 733.33
FRONTAGE IN FEET 180 96
Public Service Co of Tr in SE 14 18-7-68, County of Larim;;F, wh $5,693 92 $4,065 60 $ 9,759 52
Colorado considering S In of sd SE h as N 88 59' 40" E
209 S Meldnmm and all bearings relative thereto, is contained
Fort Collins, Colorado 80521 within lines wh begin at pt wh bears N 88 59'
87184-00-006 40" E 1050 95 ft from SW cor of sd SE 4 and
FICNTAGE IN FEET 420.06 th N 88 59' 40" E 420 06 ft to pt on wesrly ROW
In of the UP RR, th N 0 03' 20" W 680 43 ft along
sd wesrly ROW ln, th alg the arc of a 1587 28 ft
radius curve to L 168 07 ft, th ing chord bears
N 03 05' 20" W 167 99 ft alg sd wesrly ROW ln,
th S 83 52' 40" W 420 00 ft, th alg the arc of
1167 28 ft rad curve to R 123 60 ft, the long
chord bears S 03 05' 20" E 123 54 ft, th S 0
03' 20" E 687 39 ft to pt of begin, con 8 0008
acmes, M/L & sub to RW Co R3 on southerly 30 ft
Teledyne Industries Inc Lot 1, Teledyne Aqua Tec Subd
1730 E Prospect $5,122 31 $3,657 45 $ 8,779 76
Fort Collins, Colorado 80521 Credit for ex C & G & W -1,714 85
87184-00-007 $ 7,064 91
FAC MACE IN FEET 377 89
PfIOSPDCP - LEMAY TO TIMBERLINE STREET TMPROVIIAEN'r DISTRICT NO 69 ASSESSMENT RDLE Page 7 of 8
NAME AND ADDRESS DESCRIPTION AM INT AM= TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUTTER
@ $13.55499 @ $9 67861
Union Pacific Railroad Lot 2, Union Pacific Subd No 1 $1,158 83 $ 827 42 $ 1,986 25
K W Teague Credit for 85 49 LF of VC & - 756 18
1416 Dodge Street G & Walk
Qnaha, Nebraska 68102 Credit for streetlight payment- 43 01
87191-07-003
FRCNTACZ IN FEET 85 49 $ 1,187 06
City of Fort Collins Substation 300 as described in Rk 1552, $10,306 55 $7,359.13 $ 17,665 68
300 LaPorte Ave Page 62-64, Larimer County Clerk, Colo Credit for 45 48 LF of C & - 402 27
Fort Collins, Colorado 80521 G & Walk not built
87190-00-017 Credit for 95 17 SY of 2" - 337 38
FRCNTAGE IN FEET 760 35 asphalt & 7'h" base not bui t
$ 16,926 03
or u to ?x �f - 68
o Ci o 1 N f as 8 2 3 all %21 1,`Q36"7ue s t1 e1 or o 0 1 19, th 8 21 34 W 3 8 1 o VC87 9 - -0 t, 0 0 03" 0 ft th 2 ' & t - 8
IN 07 3 " 0 ft to N 9 $ 6
34 1 8 t, th g f a
1 to a ord s
S 9 0 5 6 S 1 ' 3 W
15 5 f o a 14 4
rad R cho N 2
55" 9 B
City of Fort Collins Edora Park as described in Bk 1382, Pg 158,
300 LaPorte Avenue Larimer County Clerk, Colorado $3,354 87 $2,395 46 $ 5,750 33
Fort Collins, Colorado 80521
87190-00-009
FRONTAGE IN FEET 247 50
t
I
I I
J
PRfSPDCT - LEMAY TO TUEERLINE STREET IIMPROVEPgNT DISTRICT NO 69 ASSESSMENT ROLE Page 8 of 8
NAME AND ADDRESS DESCRIPTION AMOUNT AMOUNT TOTAL
FOR FOR ASSESSMENT
PAVEMENT CURB AND
GUrIER
@ $13 55499 @ $9 67861
Cienfuegos, Shirley E Lot 30, Prospect Estates, 2nd Filing $2,031 63 $1,450 63 $ 3,482.26
437 N Roosevelt Credit to be paid by City - 3,482 26
Fort Collins, Colorado 80521 $
87184-05-030
FIUNTAGE IN FEET 149 88
Crabtree, Loreu W Lot 31, Prospect Estates, 3rd Filing $1,626 61 $1,161 43 $ 2,788.04
1609 E Lake Credit to be paid by City - 2,788 04
Fort Collins, Colroado 80521
87184-06-031 $ -0-
F104TAGE IN FEET 120 00
Allison, Austin W/Rhoda G Lot 39, Prospect Estates, 3rd Filing. $1,558 83 $1,113 04 $ 2,671 87
1613 E Lake Credit to be paid by City - 2,671.87
Fort Collins, Colorado 80521 $ -0-
87184-06-039
FR(NTAGE IN FEET 115 00
Pool, Marlon B/Sylvia F Lot 40, Prospect Estates, 3rd Filing
1448 Pikes Peak $2,506 87 $1,789 96 $ 4,296 83
Fort Collins, Colorado 80521 Credit to be paid by City -4,296 83
87184-06-040 $ -0-
FRONTAGE IN FEET 184 94
Total Assessable $139 , 288 701
City of Fort Collins Non-Collectable Assessments (Excluding City Property) $ 37,274 87
Construction Costs . . . $126 . 143. 08 1
TOTAL COST OF STREET $302,706 65
,l
R
assessments herein provided for shall
Section 2. All asse
be due and payable within thirty (30) days after the final
publication of this ordinance, without demand, provided that
all such assessments may, at the election of the owners of
the property assessed, be paid in ten (10) equal installments,
the first installment being due on the first day of May,
1977 , and on the first day of May of each year thereafter
until the full amount thereof has been paid, together with
interest on the unpaid principal at the rate of six percent
(6%) per annum, said interest to be payable at the time of
the principal payments Failure to pay the whole of such
assessment within thirty (30) days as aforesaid shall be
conclusively considered and held as an election on the part
of the persons interested, whether under disability or
otherwise, to pay in such installments.
Section 3. In the case of election of any person to
pay in installments as aforesaid, the failure to pay any
installment when due, whether on principal or interest,
shall cause the whole of the unpaid principal to become due
and payable immediately and the whole amount of unpaid prin-
cipal and accrued interest shall thereafter draw interest at
the rate of one percent (1%) per month until the date of
sale as hereinafter provided, provided, however, that at any
time prior to the date of sale, the owner of the property
assessed may pay the amount of all unpaid and due install-
ments, together with all interest that has accrued as afore-
said, and all penalties accrued, and upon such payment shall
be restored to the right to pay the installments in the same
manner as if the default had not occurred The owners of
any property not in default as to any installments or payments
may at any time pay the entire unpaid balance of principal,
together with interest accrued thereon, to the first day of
the month following such payment
Section 4 Payments may be made to the Director of
Finance at any time within thirty (30) days after the final
publication of this ordinance and in such event an allowance
-3-
of five percent (5%) as a discount shall be made on all
payments during such period only.
Section 5. In case of the default in the payment of
any installment of principal or interest when due, all
property concerning which such default is suffered shall be
advertised by the County Treasurer and sold for the payment
of the entire unpaid assessment thereon at the same time or
times and in the same manner under all the same conditions
and penalties and with the same effect as provided by law
for the sale of real estate in default of the payment of
general taxes, all as provided by Chapter 16 of the Code of
the City of Fort Collins.
Section 6. The Director of Finance shall prepare the
foregoing assessment roll in proper form as provided in
Chapter 16 of the Code of the City of Fort Collins, and
shall keep a record of all payments made during the thirty-
day period after the final publication of this ordinance and
upon the expiration of said thirty-day period, he shall
deliver said assessment roll to the County Treasurer of
Larimer County with his warrant for collection of the same,
all as provided in Chapter 16 of the Code of the City of
Fort Collins.
Section 7 All collections made by the County Treasurer
on said assessment roll in any calendar month shall be
accounted for and paid over to the Director of Finance on
the first day of each and every month with separate statements
for all such collections for each month in the same manner
as general taxes are paid by the County Treasurer to the
City.
Section 8 The owner of any divided or undivided
interest may pay his share of any assessment upon producing
evidence of the extent of his interests satisfactory to the
officers having the roll in their charge.
-4-
i
i
f
i
Section 9. If any property owner eligible therefor is ,
granted a deferment from the assessments made by this ordin-
ance pursuant to the provisions of Ordinance No. 106, 1973,
then the 1}en created on such owner' s property by this
ordinance shall remain in full force and effect, but the
same shall not be due or payable until the deferment granted
pursuant to Ordinance No 106, 1973 has expired.
Introduced, considered favorably on first reading, and
ordered published this 1st day of March, A D 1977, and to
` be presented for final passage on the 15th day of March,
A.D 1977.
ayor
ATTEST-
City Clerk
Passed and adopted on final reading this 15th day of
March, A D 1977
OXII
Mayor ,
A ES
City Clerk
-5-