Loading...
HomeMy WebLinkAbout173 - 12/03/2024 - AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT COLLINS REGARDING CALCULATION AND COLLECTION OFSec. 26-474. • Residential electric development fees and charges. (b)The ECF shall be the total of the dwelling unit charge and systems modification charge, to be determined as follows: (1)The dwelling unit credit shall be as follows: For upgrade of an existing single family panel size, to be applied against $2,131 the a licable ECF char e below (2)The dwelling unit charge shall be as follows: a.Charge for a detached or attached single-family or multi-family panel size with two hundred (200) amp service $2,683 C.Charge for a detached or attached single-family panel size with three hundred and twenty (320) amp service $4,294 d.Charge for multi-family panel size with one hundred fifty (150) amp service, per dwelling unit $1,885 {d) A Building Site Charge ("BSC") for any new or modified residential service shall consist of the actual cost of construction, labor, materials, and equipment reasonably related to and required in providing electric services to the residential site. The BSC shall be reviewed and adjusted as provided in Section 26-4 73(b ). (2)When any new residential service, on a previously undeveloped parcel, requires installation by the Utility of secondary service the BSC shall include a base secondary service charge (SSC) and linear foot charges, and shall be paid at the time of building permit based upon the current rates as of the time of issuance of the building permit. -2- (3)The customer shall be responsible for secondary service installation and maintenance from the point of delivery to the service panel for multi-family dwellings. Section 2. Subsections 26-475 (b) and (d) of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 26-475. • Nonresidential electric development fees and charges. (b)The ECF shall be the total of the kVA service charge and systems modification charge, to be determined as follows: (1)The kVA service charge shall be determined as follows. a.For customer electric loads served by the utility, the kVA service charge shall be calculated as follows: ECF shall be calculated as follows: secondary metered services $/kW = $465.52 +$29.76 x ln(kW) primary metered services $/kW = $309.69 + $8.09 x ln(kW) Where In is the natural logarithm kW is calculated as follows: three phase services kW= Ax V x SQRT(3) x PF x 0.3/1000 single phase services kW = Ax V x PF x 0.3/1000 Where A is the requested amperage, calculated individually and aggregated under subsection (a) above. Vis requested line to line voltage. PF is the power factor, which is assumed to be 0.9. (d)A Building Site Charge ("BSC") for extending primary circuitry to the transformer for any new or modified nonresidential service shall be invoiced and paid in the same manner and at the same time as the ECF is invoiced and paid pursuant to§ 26-475(a). The BSC shall be the total of the primary circuit charge, transformer installation charge and any additional charges, based on the actual cost of construction, labor, -3-