HomeMy WebLinkAbout068 - - AMENDING CHAPTER 26 OF THE CODE OF FORT COLLINSREGARDING CALCULATION AND COLECTION OF DEVELOPMENT FEORDINANCE NO. 068, 2017
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT
COLLINS REGARDING CALCULATION AND COLLECTION OF
DEVELOPMENT FEES IMPOSED FOR THE CONSTRUCTION
OF NEW OR MODIFIED ELECTRIC SERVICE CONNECTIONS
WHEREAS, the City Council is empowered and directed by Article XH, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or
charges for utility services furnished by the City as will produce revenues sufficient to pay the
costs, expenses and other obligations of the electric utility, as set forth therein; and
WHEREAS, pursuant to City Code Sections 26-473 through 26-475, the City imposes
development fees for new or modified electric service connections, including an Electric
Capacity Fee and a Building Site Charge; and
WHEREAS, the ECF is a one-time charge designed to recover the initial cost of adding
new development to the electric system, and the Building Site Charge (BSC) is designed to
recover actual time and materials costs associated with building on site electric facilities at the
specific development; and
WHEREAS, the ECF and BSC together represent the total electric plant investment fee
PIF) for new development; and
WHEREAS, during 2016, Electric Utility staff engaged NewGen Strategies to assist in
evaluating the calculation and methodology used in setting the ECF and BSC in light of the
Utility's costs, the nature of development occurring in the City, and regional municipal utility
practice; and
WHEREAS, staff has determined the current methodology assumes greenfield
development, looking to square footage, the linear footage that abuts the public right of way, and
demand (kilowatt or kW) required to serve the developed site; and
WHEREAS, as the City experiences more redevelopment, mixed use developments and
higher density developments, this.method fails to appropriately assign capital costs to the new
load required to serve developed sites; and
WHEREAS, staff recommends updating the cost allocation methodology used to
calculate the ECF and BSC to assign costs based on actual system value, which is the "buy-in"
approach used to calculate new or modified service connection fees for water and wastewater
services, more accurately reflect the cost of redevelopment in the community, and simplifies
administration of the ECF and BSC; and
WHEREAS, based on the foregoing, it is the desire of the City Council to amend Chapter
26 of the City Code to update the methodology for calculating and applying the Electric Capacity
Fee and a Building Site Charge for new or modified electric service connections.
1-
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That the City Council hereby makes and adopts the determinations and
findings contained in the recitals set forth above.
Section 2. That Section 26-474(b) of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 26-474. Residential electric development fees and charges.
b) The ECF shall be the total of the; dwelling'unit charge and systems modification
charge, to be determined as follows:
1) The dwelling unit charge shall be as follows:
a. For a single-family panel size with one hundred fifty (150) amp service (nonelectric $
1,537
heat), per.dwelling unit
b. For a single-family panel size with two hundred (200) amp service 1,879
c. For a single-family with electric heat, per dwelling unit 2,508
d. For a multi-family panel size with twe hundred (200) amp serwiee v.4th one
hundred fifty (150) amp service (non-electric heat), per dwelling unit 1,350
I
e. For a multi-family panel size with two hundred (200) amp service or with one
2,066
hundred fifty (150) amp service with electric heat, per dwelling unit
2) A system modifications charge will apply when a new or modified service will
require infrastructure in addition to or different from the standard base electrical
system model. The differential costs associated with such system modifications
will be included in the calculated ECF.
2-
1
1
Section 3. That Section 26-474(d) of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 26-474. Residential electric development fees and charges.
d) A Building Site Charge ("BSC") for any new or modified residential service shall
consist of the total of the applicable charges as described in this Subsection (d), and shall
be paid as specified herein.
2) When any new or modified residential service requires installation by-the
Utility of secondary service the BSC shall include a secondary service charge
SSC), and shall be paid at the time of building permit and based upon the current
rates as of the time of issuance of the building permit. The SSC for single-family
and duplex residences shall be the total of the secondary service charges,
determined as follows:
a.The secondary service charge shall be as follows:
Secondary Charge Plus Per-Foot
Service Size up to 65 feet) Charge for
Each Foot Over 65
4/0 service 1,143.00
r
7.05/Foot
4/0 Mobile Home Service 932.00 N/A
4) Any single-phase residential service over two hundred (200) amps shall be
considered a non-residential service.
Section 4. That Section 26-475(b) of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 26-475. Nonresidential electric development fees and charges.
b) The ECF shall be the total of the kVA service charge and systems modification
charge, to be determined as follows:
3-
1) The kVA service charge shall be determined as follows.
a.For customer electric loads served by the utility,the kVA service
charge shall be calculated as follows:
ECF shall be calculated as follows:
secondary metered services kW = 320.31 + 21 x In(kW)
primary metered services kW = 212.78 +7.89 x ln(kW),
Where In is the natural logarithm
kW is calculated as follows:
three phase services kW = A x V x SQRT(3) x PF x 0.3
single phase services kW = A x V x PF x 0.3
Where A is the requested amperage. V is requested line to line
voltage. PF is the power factor, which is assumed to be 0.9.
2) A system modifications charge will apply when a new or modified service will
require infrastructure in addition to or different from the standard,base electrical
system model. The differential costs associated with such system modifications
will be included in the calculated ECF.
Section 5. That Section 26-475(d) of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 26-475. Nonresidential electric development fees and charges.
d) A Building Site Charge ("BSC") for extending primary circuitry to the
transformer for any new or modified nonresidential service shall be invoiced and paid in
the same manner and at the same time as the ECF is invoiced and paid pursuant to
Section 26-475(a). The BSC shall be the total of the primary circuit charge, transformer
installation charge and any additional charges, determined as follows:
4-
i
1) The primary circuit charge for service from the utility source to the
transformer shall be as follows:
Ia. For single-phase service, per foot of primary circuit 9.12
b. For three-phase service, per foot of primary circuit 16.58
2) . The transformer installation charge shall be as follows:
a. For single-phase service, per transformer 1,153.19
b. For three-phase service, per transformer 2,458.14
Section 6. That the amendments to Chapter 26 of the City Code contained herein
shall go into effect for all new or modified electric service connections on October 1, 2017.
Introduced, considered favorably on first reading, and ordered published this 16th day of
May, A.D. 2017, and to be
Fo.rr
for final passage on the 6th day of June, A.D. 2017.
O.. cAo I
n
Mayor
ATTEST: C'040RAc'
W u,
City Clerk
Passed and adopted.on final reading on the 6th day of June, A.D. 2017.
FORTco,