Loading...
HomeMy WebLinkAbout902 Schlagel St - Special Inspections/Engineering - 05/02/2023 CTLITHOMPSON May 2, 2023 Landmark Homes 6341 N. Fairground Avenue Windsor, Colorado 80550 Attn: Brian Foster Subject: Review of balloon framed studs at stairwell 902 Schlagel Street Building 16A, Northfield Subdivision Fort Collins, Colorado CTLIT Project Number: FC09907.011 Mr. Foster, It is our understanding that the exterior wall framing at the stairwells differed than what was shown on the design drawings (provided by CTL Thompson, Project#FC09907.011,dated 07/25/2022). Personnel from our office have inspected the as-built construction for conformance with the design codes. The as built framing at the balloon framed walls at the stairs were framed using single 2x6 studs at 16"on-center, where the structural plans indicated (2)2x6 studs at 16"on-center. The balloon framed wall have been checked for the design wind loads and it has been determined the single 2x6 studs pass minimum design loads regarding strength. Although the studs pass minimum strength criteria, they do not pass the maximum recommended deflections for flexible finishes such as drywall. Since deflection is a serviceability concern, a fix for the balloon framed wail is not required if the contractor accepts the additional risks due to excessive deflection. The deflections risks include but are not limited to; drywall cracking, windows sticking at the stairs, and potential visual defects prior to drywail cracking. Thank you for selecting CTLITHOMPSON for your engineering needs. When we can be of additional service, please contact our office. Respectfully submitted, CTLITHOMPSON, INC. ems°L o.• ;$AS y Devin Hougard May 2 2023 12:05 PM Devin Hougard, P.E. Project Engineer dhougardCc�ctithompson.com 400 North Link Lane l Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441