Loading...
HomeMy WebLinkAbout729 S Shields St - Special Inspections/Engineering - 04/05/20184396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 April 5, 2018 Reliance Construction Consulting 201 Commerce Drive – Unit 1 Fort Collins, Colorado 80524 Attn: Mr. Greg Orr (greg@relianceconstructionconsulting.com) Re: Construction Observation and Testing Report – Submittal No. 5 Kappa Kappa Gamma Sorority – 2 Story Addition Fort Collins, Colorado EEC Project No. 1184004 Mr. Orr: As requested, during the period of March 12 through March 24, 2018, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the referenced project. The services provided by EEC personnel during the referenced period were on a part-time/on-call as-needed basis and included periodic site observations during various stages of the concrete masonry unit (CMU) wall construction and non-destructive testing services as described herein. The results of the field and laboratory testing services completed by EEC personnel during the referenced period are included with this report. Concrete Masonry Unit (CMU) Wall Construction Observations During the referenced period, EEC personnel observed portions of the reinforcing steel and other structural related elements during the 8-inch by 16-inch standard block CMU wall construction for the stairwell core. Layout of the CMU wall alignments were provided by others. During the daily site visits, (March 12, 2018), EEC personnel observed CMU wall construction at the various wall alignments and recorded approximate gridline locations, elevations/courses for each day, along with the observed horizontal and vertical reinforcement requirements and grout placement as needed. In general, for the portions of the CMU wall observed by EEC personnel, the vertical reinforcement consisted of one (1) #5 rebar spaced 48 inches on-center, along with additional #5 Earth Engineering Consultants, LLC April 5, 2018 EEC Project No. 1184004 Page 2 rebar posited at each corner, end of wall and each side of openings. The horizontal reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16 inches on- center full-height of each CMU wall. At the various bond beam locations, below and above windows, and at openings, EEC personnel noted the reinforcement consisted of one (1) continuous #5 or two (2) continuous #4 rebar within the fully-grouted cell alignments, as required. The horizontal and vertical reinforcement for the portions of the CMU walls observed by EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to be in general accordance with details presented on the structural drawings prepared for the project by KL&A, Inc. dated November 3, 2017. During the grouting operations, EEC personnel observed grout placement within the low lifts. Lap lengths, where applicable, were checked and appeared to meet the minimum required lengths. Non-Destructive Testing (NDT) Services During the referenced period, EEC’s in-house certified ICC bolt and weld *inspector conducted site visits on March 21 and 29, 2018 to perform visual observations of the structural framing located in the approximate area of Grid Lines 1 through 5 from A through B.5 including areas west of Grid Line A and radius north of Grid Line 1. Included are bolted column to beam connections, bolted beam to beam connections, bolted beam to masonry connections, welded radius HSS beam to angle connections, welded angle to column connections, welded plate to radius HSS connections, welded plate to column connections, welded plate to bearing plate connections and welded bearing plate to bottom beam flange connections. The connections that were visually observed in the area of the referenced Grid Lines appeared to be in general accordance with the project plans and details dated January 19, 2018 and SSK-3 diagram dated March 12, 2018. In addition, visual observations of the light gauge structural framing located in the approximate area of Grid Lines 1 through 5 from A through B.5 including areas west of Grid Line A and radius north of Grid Line 1. Included are top and bottom stud track connections, screwed top and bottom track to stud connections and screwed header and jamb connections. The framing that was visually observed in the area of the referenced Grid Lines appeared to be in general accordance with the project plans and details dated January 19, 2018. EARTH ENGINEERING CONSULTANTS, LLC Reinforcing Steel Observation Diagram Kappa Kappa Gamma Sorority Addition - Fort Collins, Colorado EEC Project #: 1184004 April 2018 Legend CMU Reinforcement Observation 3-12-18 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 March 5, 2018 Reliance Construction Consulting 201 Commerce Drive – Unit 1 Fort Collins, Colorado 80524 Attn: Mr. Greg Orr (greg@relianceconstructionconsulting.com) Re: Construction Observation and Testing Report – Submittal No. 3 Kappa Kappa Gamma Sorority – 2 Story Addition Fort Collins, Colorado EEC Project No. 1184004 Mr. Orr: As requested, during the period of February 12 through February 24, 2018, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the referenced project. The services provided by EEC personnel during the referenced period were on a part-time/on-call as-needed basis and included periodic site observations and laboratory testing during various stages of the concrete masonry unit (CMU) wall construction and testing of cast-in-place concrete as described herein. The results of the field and laboratory testing services completed by EEC personnel during the referenced period are included with this report. Concrete Masonry Unit (CMU) Wall Construction Observations During the referenced period, EEC personnel observed portions of the reinforcing steel and other structural related elements during the 8-inch by 16-inch standard block CMU wall construction for the stairwell core. Layout of the CMU wall alignments were provided by others. During the daily site visits, (February 12 through 17, 2018), EEC personnel observed CMU wall construction at the stairwell core wall alignments and recorded approximate gridline locations, elevations/courses for each day, along with the observed horizontal and vertical reinforcement requirements and grout placement as needed. In general, for the portions of the CMU wall observed by EEC personnel, the vertical reinforcement consisted of one (1) #5 rebar spaced 48 inches on-center, along with additional #5 rebar posited at each corner, end of wall and each side of openings. The horizontal Earth Engineering Consultants, LLC March 5, 2018 EEC Project No. 1184004 Page 2 reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16 inches on- center full-height of each CMU wall. At the various bond beam locations, below and above windows, and at openings, EEC personnel noted the reinforcement consisted of one (1) continuous #5 or two (2) continuous #4 rebar within the fully-grouted cell alignments, as required. The horizontal and vertical reinforcement for the portions of the CMU walls observed by EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to be in general accordance with details presented on the structural drawings prepared for the project by KL&A, Inc. dated November 3, 2017. During the grouting operations, EEC personnel observed grout placement within the low lifts. Lap lengths, where applicable, were checked and appeared to meet the minimum required lengths. During the CMU construction phase for the project, EEC personnel tested/evaluated the grout material used within portions of the wall alignments, as identified herein. Grout compressive strength cylinders, (approximately 4-inch diameter by 7-5/8 inches in length), were molded on- site in general accordance with ASTM specifications. The grout cylinders were molded on-site within CMU blocks used to construct the CMU walls, and were extracted/cored using a 4-inch inside diameter diamond bit core barrel upon retrieval and delivery to our Windsor laboratory 2 days following the initial preparation of the specimens. Results of the field and 7-day laboratory compressive strength tests performed during the referenced period are provided herein while the 28-day compressive strength test results will be provided as they become available. Testing of Cast-in-Place Concrete EEC personnel observed and tested Portland cement concrete delivered to the site for placement as indicated on the enclosed daily report for the referenced project, (please refer to Set No. 3), which was inadvertently left out of our previous Submittal No. 2. Field testing performed on the plastic concrete included slump, air content, unit weight, and concrete temperature. The ambient air temperature at the time of placement was also recorded. Five (4-inch diameter by 8 inches in height) concrete test cylinders were cast from a representative sample on the respective date for laboratory curing and compressive strength testing. Results of the field and 7-day laboratory compressive strength test results performed during the referenced period are included herein, while the 28-day test results will be provided as they become available. EARTH ENGINEERING CONSULTANTS, LLC Reinforcing Steel Observation Diagram Kappa Kappa Gamma Sorority Addition - Fort Collins, Colorado EEC Project #: 1184004 February 2018 Legend CMU Reinforcement Observation 2-12 through 2-17-18 1 1 1 1 1 1 1 1 Project: Kappa Kappa Gamma Sorority - 2-Story Addition EEC Project #: Reports to: Reliance Construction Consulting - Greg Orr: greg@relianceconstructionconsulting.com Elder Construction – Tim Bland (tim.bland@elderconstructioninc.com) 2610 -- Compressive Strength (psi) -- Type of Failure Split Split -- -- 0 -- Average 0 -- -- -- -- 14 -- -- -- 0 Area (in2) 11.04 11.04 -- -- 7 -- -- Age (days) 7 2000 h h.1 3/2/2018 3/16/2018 3/16/2018 -- Water Added on Site: NR Time of Sample: 1 Earth Engineering Consultants, LLC Report of Masonry Grout Tests Placement Date: Placement Location: Concrete Supplier: Water Added on Site: of Required 28 Day Compressive Strength (psi): B Project Number: EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS 83443872 Truck Number: GENERAL INFORMATION 129 Mix Code: 6401103 10 gals Interior Slab-on-Grade - NW Corner Aggregate Industries Type of Placement: Pump 2/9/2018 Test No.: 3 Ticket Number: Comments: Yards: 10 50 4000 EEC Technician: SM Batch Time: 6:52 AM Sample Time: 7:35 AM FIELD TEST DATA TEST RESULTS SPECIFICATIONS Slump (in) ASTM C143 4.5" Air Content (%) ASTM C231 2.8% Unit Weight (pcf) ASTM C138 143.6 ---- Concrete Temperature (deg F) ASTM C1064 65 90° Max Air Temperature at Placement (deg F) 24 ---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average Maximum Cylinder Cylinder Compressive Compressive Failure Strength Strength Number Tested (days) (lbs) (in) (in) (in2) Type (psi) (psi) Specimen Date Age Applied Load Height Diameter Area 3 02/16/18 7 48770 8 4 12.57 Shear 3880 3880 Project: Kappa Kappa Gamma Sorority - 2-Story Addition Aggregate Industries Elder Construction – Tim Bland (tim.bland@elderconstructioninc.com) 1184004 Report Distribution: Reliance Construction Consulting - Greg Orr: greg@relianceconstructionconsulting.com 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 February 13, 2018 Reliance Construction Consulting 201 Commerce Drive – Unit 1 Fort Collins, Colorado 80524 Attn: Mr. Greg Orr (greg@relianceconstructionconsulting.com) Re: Construction Observation and Testing Report – Submittal No. 2 Kappa Kappa Gamma Sorority – 2 Story Addition Fort Collins, Colorado EEC Project No. 1184004 Mr. Orr: As requested, during the period of January 15 through February 10, 2018, Earth Engineering Consultants, LLC (EEC) personnel provided on-site construction observation and testing services for the referenced project. The services provided by EEC personnel during the referenced period were on a part-time/as-needed basis and included field density testing of structural fill materials, observations of reinforcing steel placed within the foundation footings and stem walls and testing of cast-in-place concrete as described herein. The results of the field and laboratory testing services completed by EEC personnel during the referenced period are included with this report. Field Density Testing Services During the referenced period, EEC personnel performed observations and field density tests on structural fill materials used to develop slab subgrades that had been placed/prepared and compacted prior to and/or during our site visits. The field density tests were completed at random locations within the areas tested and were performed in general accordance with ASTM Specification D6938. Results of the field density tests completed during the referenced period are shown on the attached summary sheet and approximate locations are “plotted” on the attached site diagrams included with this report. The field density test results met the compaction requirement of at least 95% of standard Proctor maximum dry density (ASTM D698). Earth Engineering Consultants, LLC February 13, 2018 EEC Project No. 1184004 Page 2 Reinforcement Observations During the referenced period, EEC personnel conducted site visits on January 17 and 23 and February 9, 2018 to perform visual observations of the reinforcing steel placed for footings, stem walls, and the slab-on-grade at locations as identified on the enclosed “color-coded/highlighted” site diagrams. The reinforcement for the continuous spread footings consisted of three (3) #4 continuous horizontal rebar per details 1/S200, 6/S200, 7/S200, 9/S200, and 12/S200 on the structural drawings. The reinforcement for the footing pads consisted of either four (4) #5 horizontal rebar each way for the bottom mat or seven (7) #5 horizontal rebar each way for the bottom mat per the isolated footing schedule on sheet S300. The reinforcement for the stem walls consisted of #4 vertical dowels spaced at 16 inches on center and #4 continuous horizontal rebar spaced at 12 inches on center per details 1/S200, 6/S200, 7/S200, 9/S200, and 12/S200 on the structural drawings. The reinforcement for the slab on grade consisted of WWF 6X6 – W2.1XW2.1 mesh with three (3) #5 continuous horizontal rebar in the longitudinal direction and #5 continuous horizontal rebar spaced at 16 inches on center at the thickened portions in the slab, as well as #4 vertical dowels spaced at 16 inches on center at slab pour overs per the note on sheet 1/S101 and details 4/S200 and 6/200. Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum requirements. The reinforcement for the footings, stem walls, and slab-on-grade as noted herein and observed by EEC personnel on the dates indicated, appeared to be in general accordance with details presented on the structural drawings prepared by KL&A, Inc. dated September 28, 2017. Testing of Cast-in-Place Concrete During the referenced period, EEC personnel observed and tested Portland cement concrete delivered to the site for placement as indicated on the enclosed daily reports for the referenced project, (please refer to Set No’s. 1 and 2). Field testing performed on the plastic concrete included slump, air content, unit weight, and concrete temperature. The ambient air temperature at the time of placement was also recorded. A minimum of five (4-inch diameter by 8 inches in height) concrete test cylinders were cast from representative samples on each respective date for laboratory curing and compressive strength testing. Results of the field and 7-day laboratory compressive strength test results performed during the referenced period are included herein, while the 28-day test results will be provided separately, as they become available. Proctor Designation SF Maximum Dry Density (pcf) 127.5 Optimum Moisture Content (%) 9.1% Required Moisture Variance N/A Required Percent Compaction 95% Laboratory Method ASTM D-698 Compliance with Project Specs Elev. / Lift No. Material (Proctor) Percent Moisture Dry Density Moisture (Pass / Fail) %Comp. (Pass / Fail) 8 1/31 1 Structural Fill Subgrade - See Diagram FSG SF 3.6% 124.3 -5.5% 97% N/A Pass 9 1/31 2 Structural Fill Subgrade - See Diagram FSG SF 2.9% 125.1 -6.2% 98% N/A Pass 10 1/31 3 Structural Fill Subgrade - See Diagram FSG SF 3.8% 122.7 -5.3% 96% N/A Pass 11 1/31 4 Structural Fill Subgrade - See Diagram FSG SF 3.5% 127.1 -5.6% 100% N/A Pass 12 1/31 5 Structural Fill Subgrade - See Diagram FSG SF 2.8% 126.2 -6.3% 99% N/A Pass 13 1/31 6 Structural Fill Subgrade - See Diagram FSG SF 3.7% 121.0 -5.4% 95% N/A Pass 14 2/7 1 Structural Fill Subgrade - See Diagram FSG SF 4.0% 123.4 -5.1% 97% N/A Pass 15 2/7 2 Structural Fill Subgrade - See Diagram FSG SF 3.7% 121.8 -5.4% 96% N/A Pass EARTH ENGINEERING CONSULTANTS, LLC Approximate Test Location / Notes Daily Test Number Date Consecutive Test Number Moisture Variance Percent Compaction Field Test Results Project Name: Kappa Kappa Gamma Sorority SUMMARY OF FIELD DENSITY TESTS Location: Fort Collins, Colorado Project No: Date: 1184004 February 2018 1/11-1 1/11-2 1/11-3 1/11-4 1/11-6 1/11-7 1/11-5 2/7-1 2/7-2 1/31-3 1/31-2 1/31-5 1/31-6 1/31-1 1/31-4 Field Density Test Location Diagram Kappa Kappa Gamma Sorority Addition - Fort Collins, Colorado EEC Project #: 1184004 Fill, Subgrade, & Aggregate Base EARTH ENGINEERING CONSULTANTS, LLC EARTH ENGINEERING CONSULTANTS, LLC Reinforcing Steel Observation Diagram Kappa Kappa Gamma Sorority Addition - Fort Collins, Colorado EEC Project #: 1184004 February 2018 Legend Footing Reinforcement Observation 1-17-18 Foundation Wall Reinforcement Observation 1-23-18 Footing Reinforcement Observation 1-23-18 Slab Reinforcement Observation 2-9-18 Placement Date: Placement Location: Concrete Supplier: Water Added on Site: of Required 28 Day Compressive Strength (psi): B Project Number: Type Report Distribution: Reliance Construction Consulting - Greg Orr: greg@relianceconstructionconsulting.com Average (in2) (psi) (psi) Strength Strength (in) Compressive Height ---- Ticket Number: (in) COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Maximum Date Age Aggregate Industries Notify Contractor of Low 7 Day Breaks TEST Slump (in) Project: 1184004 Batch Time: 2:35 PM Sample Time:30 6.1% Compressive Area Failure ---- Concrete Temperature (deg F) 65 Cylinder Diameter FIELD TEST DATA RESULTS Applied Load Number Specimen SPECIFICATIONS ASTM C1064 90° Max ASTM C143 Cylinder Tested (days) (lbs) Air Content (%) ASTM C231 Unit Weight (pcf) 140.9 Air Temperature at Placement (deg F) 57 01/24/18 7 36940 2940 Test No.: 1 Comments: Comments: 1 8 4 2940 1/17/2018 4" Building Footings Aggregate Industries 83443443 Placement Date: Placement Location: Concrete Supplier: Water Added on Site: of Required 28 Day Compressive Strength (psi): B Project Number: Aggregate Industries Elder Construction – Tim Bland (tim.bland@elderconstructioninc.com) 1184004 Report Distribution: Reliance Construction Consulting - Greg Orr: greg@relianceconstructionconsulting.com Project: Kappa Kappa Gamma Sorority - 2-Story Addition 2 01/30/18 7 40850 8 4 12.57 Shear 3250 3250 Failure Strength Strength Number Tested (days) (lbs) (in) (in) (in2) Type (psi) (psi) Specimen Date Age Applied Load Height Diameter Area Average Maximum Cylinder Cylinder Compressive Compressive ---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Slump (in) ASTM C143 5" Air Content (%) ASTM C231 7.1% Unit Weight (pcf) ASTM C138 139.1 ---- Concrete Temperature (deg F) ASTM C1064 60 90° Max Air Temperature at Placement (deg F) 32 FIELD TEST DATA TEST RESULTS SPECIFICATIONS Comments: Yards: 10 47 4000 EEC Technician: DM Batch Time: 8:32 AM Sample Time: 9:15 AM Mix Code: 6406150 None Column - SW Corner Aggregate Industries Type of Placement: Pump 1/23/2018 Test No.: 2 Ticket Number: 83443533 Truck Number: GENERAL INFORMATION 9204 EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 March 19, 2018 Reliance Construction Consulting 201 Commerce Drive – Unit 1 Fort Collins, Colorado 80524 Attn: Mr. Greg Orr (greg@relianceconstructionconsulting.com) Re: Construction Observation and Testing Report – Submittal No. 4 Kappa Kappa Gamma Sorority – 2 Story Addition Fort Collins, Colorado EEC Project No. 1184004 Mr. Orr: As requested, during the period of February 26 through March 10, 2018, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the referenced project. The services provided by EEC personnel during the referenced period were on a part-time/on-call as-needed basis and included periodic site observations and laboratory testing during various stages of the concrete masonry unit (CMU) wall construction as described herein. The results of the field and laboratory testing services completed by EEC personnel during the referenced period are included with this report. Concrete Masonry Unit (CMU) Wall Construction Observations During the referenced period, EEC personnel observed portions of the reinforcing steel and other structural related elements during the 8-inch by 16-inch standard block CMU wall construction for the stairwell core. Layout of the CMU wall alignments were provided by others. During the daily site visits, (February 27 through March 2 and March 5 through March 9, 2018), EEC personnel observed CMU wall construction at the various wall alignments and recorded approximate gridline locations, elevations/courses for each day, along with the observed horizontal and vertical reinforcement requirements and grout placement as needed. In general, for the portions of the CMU wall observed by EEC personnel, the vertical reinforcement consisted of one (1) #5 rebar spaced 48 inches on-center, along with additional #5 rebar posited at each corner, end of wall and each side of openings. The horizontal reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16 inches on- EARTH ENGINEERING CONSULTANTS, LLC Reinforcing Steel Observation Diagram Kappa Kappa Gamma Sorority Addition - Fort Collins, Colorado EEC Project #: 1184004 March 2018 Legend CMU Reinforcement Observation 2-27 thru 3-2 & 3-5 thru 3-9-18 1 1 1 RCC: greg@relianceconstructionconsulting.com Project Number: 1184004 Report Distribution: Project: Kappa Kappa Gamma Sorority - 2-Story Addition D2 03/29/18 28 1 #VALUE! 2.03 1.003 #VALUE! D2 03/29/18 28 1 #VALUE! 2.03 1.003 #VALUE! #VALUE! 1.003 1460 1460 B 03/08/18 7 7.625 7.800 59.48 86680 1460 2.03 #DIV/0! Load (lbs) Net Compressive Strength (lbs/in2) hp/ht CF Corrected Net Compressive Strength (lbs/in2) Average Corrected Net Compressive Strength (lbs/in2) Specimen Number Date Tested Age (Days) Avg. Width (in) Avg. Length (in) Net Area (in2) Grout Type/Description: 3000 PSI COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314) 1800 psi GROUT INFORMATION Grout Supplier/Preparer: Masonry Sub. - Batched on-site Mortar Supplier/Preparer: Masonry Sub. - Batched on-site Mortar Type/Description: Type S hp/tp = 2.03 MORTAR INFORMATION Prism Height (hp) - Inches = 15.5 tp- least actual lateral dimension of prism, inches = 7.625 On-Site Masons No. of Masonry Units: 2 Max/Min Temperature (deg F): -- No. of Mortar Bed Joints: 1 Prism Constructed By: PRISM DETAILS 1 Date Grouted: 3/1/2018 Required 28 Day Compressive Strength (psi) 1500 Date Constructed: 2/28/2018 Test Set Number: Date Retrieved From Site: 3/6/2018 GENERAL INFORMATION 2 2 2 Earth Engineering Consultants, LLC Compressive Strength Report of FULLY GROUTED CMU Prisms GENERAL INFORMATION Date Constructed: 3/8/2018 Test Set Number: Date Retrieved From Site: 3/12/2018 2 Date Grouted: 3/9/2018 Required 28 Day Compressive Strength (psi) 1500 PRISM DETAILS No. of Mortar Bed Joints: 1 Prism Constructed By: 15.5 tp- least actual lateral dimension of prism, inches = 7.300 On-Site Masons No. of Masonry Units: 2 Max/Min Temperature (deg F): -- hp/tp = 2.12 MORTAR INFORMATION Prism Height (hp) - Inches = Mortar Supplier/Preparer: Masonry Sub. - Batched on-site Mortar Type/Description: Type S 1800 psi GROUT INFORMATION Grout Supplier/Preparer: Masonry Sub. - Batched on-site Grout Type/Description: 3000 PSI COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314) Specimen Number Date Tested Age (Days) Avg. Width (in) Avg. Length (in) Net Area (in2) Load (lbs) Net Compressive Strength (lbs/in2) hp/ht CF Corrected Net Compressive Strength (lbs/in2) Average Corrected Net Compressive Strength (lbs/in2) #DIV/0! B 03/16/18 7 7.300 7.400 54.02 71080 1320 2.12 1.010 1330 1330 D2 04/06/18 28 1 #VALUE! 2.12 1.010 #VALUE! #VALUE! D2 04/06/18 28 1 #VALUE! 2.12 1.010 #VALUE! 1184004 Report Distribution: Project: Kappa Kappa Gamma Sorority - 2-Story Addition RCC: greg@relianceconstructionconsulting.com 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 January 24, 2018 Reliance Construction Consulting 201 Commerce Drive – Unit 1 Fort Collins, Colorado 80524 Attn: Mr. Greg Orr (greg@relianceconstructionconsulting.com) Re: Construction Observation and Testing Report – Submittal No. 1 Kappa Kappa Gamma Sorority – 2 Story Addition Fort Collins, Colorado EEC Project No. 1184004 Mr. Orr: As requested, during the period of January 8 through January 13, 2018, Earth Engineering Consultants, LLC (EEC) personnel provided on-site construction observation and testing services for the referenced project. The services provided by EEC personnel during the referenced period were on a part-time/as-needed basis and included observations, field density, and laboratory testing of footing overexcavation fill material as described herein. The results of the field and laboratory testing services completed by EEC personnel during the referenced period are included with this report. Laboratory and Field Density Testing Services During the referenced period, EEC personnel obtained one (1) representative sample of the on- site overburden subgrade materials, (EEC Sample ID “A”). The composite sample was returned to our office for further laboratory testing, evaluation and classification. Laboratory testing performed on the sample included washed sieve analysis (ASTM C117 and C136), Atterberg limits (ASTM D4398) and standard Proctor (ASTM Specification D698) tests. Results of the laboratory testing completed by EEC personnel during the referenced period are shown on the attached summary sheets. The results of the recently completed Proctor test were used to evaluate the relative compaction of placed materials in the field. During the referenced period, EEC personnel performed observations and field density tests on foundation overexcavation fill materials that had been placed/prepared and compacted prior to and/or during our site visits. The field density tests were completed at random locations and Proctor Designation A Maximum Dry Density (pcf) 116.5 Optimum Moisture Content (%) 14.0% Required Moisture Variance OMC +/-2% Required Percent Compaction 95% Laboratory Method ASTM D-698 Compliance with Project Specs Elev. / Lift No. Material (Proctor) Percent Moisture Dry Density Moisture (Pass / Fail) %Comp. (Pass / Fail) 1 1/11 1 Footing Overex Fill - See Diagram -6.0 A 14.4% 114.4 0.4% 98% Pass Pass 2 1/11 2 Footing Overex Fill - See Diagram -5.0 A 15.1% 113.6 1.1% 98% Pass Pass 3 1/11 3 Footing Overex Fill - See Diagram -4.0 A 15.0% 113.4 1.0% 97% Pass Pass 4 1/11 4 Footing Overex Fill - See Diagram -3.0 A 14.3% 112.4 0.3% 96% Pass Pass 5 1/11 5 Footing Overex Fill - See Diagram -3.0 A 13.9% 115.1 -0.1% 99% Pass Pass 6 1/11 6 Footing Overex Fill - See Diagram -3.0 A 14.6% 115.0 0.6% 99% Pass Pass 7 1/11 7 Footing Overex Fill - See Diagram -3.0 A 14.3% 115.9 0.3% 99% Pass Pass EARTH ENGINEERING CONSULTANTS, LLC Approximate Test Location / Notes Daily Test Number Date Consecutive Test Number Moisture Variance Percent Compaction Field Test Results Project Name: Kappa Kappa Gamma Sorority SUMMARY OF FIELD DENSITY TESTS Location: Fort Collins, Colorado Project No: Date: 1184004 January 2018 1/11-1 1/11-2 1/11-3 1/11-4 1/11-6 1/11-7 1/11-5 Field Density Test Location Diagram Kappa Kappa Gamma Sorority Addition - Fort Collins, Colorado EEC Project #: 1184004 Fill, Subgrade, & Aggregate Base EARTH ENGINEERING CONSULTANTS, LLC 0% 10% 20% 30% Project: Kappa Kappa Gamma Sorority - 2-Story Addition 729 South Shields Street Fort Collins, Colorado Project No: 1184004 Date January 2018 7.2 Retained 3/4" O 125.0 O-10 126.9 8.0 130.9 5.6 O-20 128.8 6.4 O-30 Proctor Designation Rock Correction (AASHTO T 224) Maximum Dry Density (pcf) Optimum Moisture Content (%) 90 95 100 105 110 115 120 125 130 135 140 145 0 5 10 15 20 25 30 35 Dry Density (Pounds per Cubic Foot) Percent Moisture Earth Engineering Consultants, LLC Summary of Laboratory Classification/ Moisture-Density Relationship Curves for 100% Saturation For Specific Gravity Equal to: 2.80 2.70 2.60 Material Designation: Sample Location: Description: A Stockpile Red, Brown Sandy Lean Clay (CL) Atterberg Limits (ASTM D-4318) Liquid Limit: Plastic Limit: Plasticity Index: 35 22 13 Passing No. 200 Sieve (AASHTO T 11/ASTM C 117): 51.3% Standard Proctor (ASTM D-698) Maximum Dry Density: Optimum Moisture Content: Material Designation: A Sample Location: Stockpile Material Description: Red, Brown Sandy Lean Clay (CL) Project: Kappa Kappa Gamma Sorority - 2-Story Addition 729 South Shields Street Fort Collins, Colorado Project No: Date January 2018 Earth Engineering Consultants, LLC Summary of Laboratory Gradation Test Sieve Size Percent Passing No. 4 1184004 No. 40 No. 10 No. 200 95% 51.3% 86% 71% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 100 10 1 0.1 0.01 0.001 Percent Finer by Weight Grain Size in Millimeters 116.5 pcf 14.0% Elder Construction: tim.bland@elderconstructioninc.com Project Number: Elder Construction: tim.bland@elderconstructioninc.com Earth Engineering Consultants, LLC Compressive Strength Report of FULLY GROUTED CMU Prisms 6406150 3:15 PM 4000 4 None 9203 Pump MB Yards: EEC Technician: Truck Number: Type of Placement: ASTM C138 12.57 Shear Mix Code: Kappa Kappa Gamma Sorority - 2-Story Addition EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Elder Construction – Tim Bland (tim.bland@elderconstructioninc.com) GENERAL INFORMATION Batch Date: AM Not Reported (NR) 2/16/2018 Batch Time: Test Set No: Placement Location: Grout Supplier: Concrete Masonry Unit (CMU) Construction phase for Stairwell (20-foot Lift) On-Site Truck No: N/A Comments: FIELD TEST RESULTS Slump (Inches) 10 Grout Temperature (oF) 57 TEST RESULTS Design 28 Day Compressive Strength (psi) 48 Hour Cure Temperature d.1 Date Tested 2/23/2018 LABORATORY CYLINDER TEST RESULTS Air Temperature at Placement (oF) 35 Maximum/ Minimum Temperature (oF) High Low 2/23/2018 c c.1 d 3/2/2018 14 28 Comments: -- Sample No. b b.1 2610 0 Maximum Applied Load (pounds) 28810 1184004 11.04 11.04 -- -- 28 Hold Hold