Loading...
HomeMy WebLinkAbout877 Torino Cir - Special Inspections/Engineering - 09/19/20174396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 September 19, 2017 Columbine Health 14th Street, LLC 802 West Drake Road, Suite 101 Fort Collins, Colorado 80526 Attn: Mr. Bob Wilson (Bob.Wilson@columbinehealth.com) Re: Construction Observation and Testing – Submittal No. 3 Columbine Residences – Torino Circle Fort Collins, Colorado EEC Project No. 1174094 Mr. Wilson: As requested, during the period of August 14 through August 26, 2017, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the proposed Columbine Residences project located at Torino Circle in Fort Collins, Colorado. Those services were provided on a part-time/on-call basis and included observation and field density testing of building backfill material, observations of foundation reinforcing steel for various buildings, and testing of cast-in-place concrete for the referenced project. The results of the observation and testing services completed by EEC personnel during the referenced period are included with this report. Field Density Testing Services During the referenced period, EEC personnel performed field density tests on building backfill material as described herein, that was placed prior to and/or during our site visits. The field density tests were completed at random locations and elevations within the areas tested and were performed in general accordance with ASTM Specification D6938. The field density test results and approximate location of each test completed during the referenced period are shown on the attached summary sheet and associated site diagram. The field density test results conformed to the project specific compaction requirement of at least 95% of standard Proctor maximum dry density (ASTM D698) and were within ± 2% of the material’s optimum moisture content. Earth Engineering Consultants, LLC EEC Project No. 1174094 September 19, 2017 Page 2 Care should be taken during construction to avoid disturbing the subgrade materials. Materials that are loosened or disturbed by the construction activities or materials that become dry and desiccated or wet and softened should be removed and replaced or reworked in place prior to placement of reinforcing steel/concrete. Foundation Reinforcement and UFER Observations During the referenced period, EEC personnel conducted a site visit on August 18, 2017, to perform visual observations of the reinforcing steel placed within Building 1 / DD (881 and 883 Torino Circle) and Building 2 / AD (875 and 877 Torino Circle) foundation elements at the gridlines and/or locations as identified on the enclosed “color-coded/highlighted” site diagrams. The horizontal and vertical reinforcement for cast-in-place foundation systems as indicated herein were completed in general accordance with the Spread Footing Schedule as presented on Sheet S1.1 for the various building plans, as well as the details presented on Sheet S2.1 of the project’s respective structural drawings. Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum requirements. The horizontal and vertical reinforcement for the portions of the foundation systems as noted herein and observed by EEC personnel on the dates indicated, appeared to be in general accordance with details presented on the structural drawings prepared by Larsen Structural Design, dated February 24, 2017. In addition, Beacon Construction personnel requested that EEC provide a general observation of the UFER grounding rod installation for Building 2 / AD, which was installed during the foundation stem-wall reinforcement placement. EEC personnel, during the reinforcement observation, noted two (2) additional approximately 20 foot sections of #4 continuous horizontal rebar attached to the bottom #4 rebar of the stem-wall reinforcement, which transitioned vertically approximately 5 feet to above the top of the foundation wall along the north and south walls of the building. The UFER grounding rods appeared to have been installed in general accordance with typical standards of the industry installation procedures. Testing of Cast-in-Place Concrete During the referenced period, EEC personnel observed and tested Portland cement concrete delivered to the site for placement as indicated on the enclosed daily report for the referenced Proctor Designation A Maximum Dry Density (pcf) 108.0 Optimum Moisture Content (%) 16.5% Required Moisture Variance OMC +/-2% Required Percent Compaction 95% Laboratory Method ASTM D-698 Compliance with Project Specs Elev. / Lift No. Material (Proctor) Percent Moisture Dry Density Moisture (Pass / Fail) %Comp. (Pass / Fail) 1 8/23 1 Building Backfill - See Diagram -1.0 A 16.2% 104.1 -0.3% 96% Pass Pass 2 8/23 2 Building Backfill - See Diagram 0.0 A 14.8% 105.1 -1.7% 97% Pass Pass 3 8/23 3 Building Backfill - See Diagram -1.0 A 14.9% 104.7 -1.6% 97% Pass Pass 4 8/23 4 Building Backfill - See Diagram 0.0 A 15.3% 105.5 -1.2% 98% Pass Pass 5 8/23 5 Building Backfill - See Diagram 0.0 A 15.7% 104.8 -0.8% 97% Pass Pass 6 8/24 1 Building Backfill - See Diagram -1.0 A 15.0% 105.6 -1.5% 98% Pass Pass 7 8/24 2 Building Backfill - See Diagram -1.0 A 15.4% 104.5 -1.1% 97% Pass Pass 8 8/24 3 Building Backfill - See Diagram 0.0 A 16.1% 107.3 -0.4% 99% Pass Pass 9 8/24 4 Building Backfill - See Diagram -1.0 A 16.6% 107.1 0.1% 99% Pass Pass 10 8/24 5 Building Backfill - See Diagram -1.0 A 16.8% 106.1 0.3% 98% Pass Pass 11 8/25 1 Building Backfill - See Diagram 0.0 A 17.1% 106.1 0.6% 98% Pass Pass 12 8/25 2 Building Backfill - See Diagram -1.0 A 16.8% 104.6 0.3% 97% Pass Pass 13 8/25 3 Building Backfill - See Diagram 0.0 A 15.9% 105.2 -0.6% 97% Pass Pass 14 8/25 4 Building Backfill - See Diagram 0.0 A 16.4% 106.5 -0.1% 99% Pass Pass 15 8/26 1 Building Backfill - See Diagram -1.0 A 15.8% 106.8 -0.7% 99% Pass Pass 16 8/26 2 Building Backfill - See Diagram -1.0 A 16.0% 104.3 -0.5% 97% Pass Pass 17 8/26 3 Building Backfill - See Diagram 0.0 A 16.3% 105.6 -0.2% 98% Pass Pass 18 8/26 4 Building Backfill - See Diagram 0.0 A 15.5% 106.0 -1.0% 98% Pass Pass SUMMARY OF FIELD DENSITY TESTS Location: Fort Collins, Colorado Project No: Date: 1174094 August 2017 EARTH ENGINEERING CONSULTANTS, LLC Approximate Test Location / Notes Daily Test Number Date Consecutive Test Number Moisture Variance Percent Compaction Field Test Results Project Name: Columbine Residences - Torino Circle Field Density Test Location Diagram Columbine Residences - Torino Circle - Fort Collins, Colorado EEC Project #: 1174094 Fill, Subgrade, & Aggregate Base EARTH ENGINEERING CONSULTANTS, LLC Reinforcing Steel Observation Diagram Building 1 / DD (881 & 883 Torino Circle) Columbine Residences - Torino Circle - Fort Collins, Colorado EEC Project #: 1174094 Date: September 2017 EARTH ENGINEERING CONSULTANTS, LLC Footing Reinforcement Observation 7-31-17 Legend Stem Wall & Pilaster Reinforcement Observation 8-2-17 Column Reinforcement Observation 8-18-17 Reinforcing Steel Observation Diagram Building 2 / AD (875 & 877 Torino Circle) Columbine Residences - Torino Circle - Fort Collins, Colorado EEC Project #: 1174094 Date: September 2017 EARTH ENGINEERING CONSULTANTS, LLC Footing Reinforcement Observation 7-31-17 Legend Footing Pad Reinforcement Observation 8-18-17 Foundation Wall & Column Reinforcement Observation 8-18-17 Placement Date: Placement Location: Concrete Supplier: Water Added on Site: of Required 28 Day Compressive Strength (psi): B Project Number: EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS 60353301 Truck Number: GENERAL INFORMATION 9203 Mix Code: 5304122 None Stem Walls Bulding #1 - SW Corner Aggregate Industries Type of Placement: Pump 8/21/2017 Test No.: 2 Ticket Number: Comments: Yards: 10 39 3000 EEC Technician: DM Batch Time: 8:35 AM Sample Time: 9:20 AM FIELD TEST DATA TEST RESULTS SPECIFICATIONS Slump (in) ASTM C143 4" Air Content (%) ASTM C231 5.6% Unit Weight (pcf) ASTM C138 143.3 ---- Concrete Temperature (deg F) ASTM C1064 74 90° Max Air Temperature at Placement (deg F) ---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average Maximum Cylinder Cylinder Compressive Compressive Failure Strength Strength Number Tested (days) (lbs) (in) (in) (in2) Type (psi) (psi) Specimen Date Age Applied Load Height Diameter Area 2 08/28/17 7 37090 8 4 12.57 Shear 2950 2950 Project: Columbine Residences - Torino Circle Aggregate Industries Beacon Construction - Mr. Dillon Hinchley (dillon@beacon-con.com) Beacon Construction - Mr. Chris Mahlum (chris@beacon-con.com) Beacon Construction - Mr. Tyler Texeira (tyler@beacon-con.com) 1174094 Report Distribution: Columbine Health Systems - Bob Wilson: Bob.Wilson@columbinehealth.com 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 September 19, 2017 Columbine Health 14th Street, LLC 802 West Drake Road, Suite 101 Fort Collins, Colorado 80526 Attn: Mr. Bob Wilson (Bob.Wilson@columbinehealth.com) Re: Construction Observation and Testing – Submittal No. 3 Columbine Residences – Torino Circle Fort Collins, Colorado EEC Project No. 1174094 Mr. Wilson: As requested, during the period of August 14 through August 26, 2017, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the proposed Columbine Residences project located at Torino Circle in Fort Collins, Colorado. Those services were provided on a part-time/on-call basis and included observation and field density testing of building backfill material, observations of foundation reinforcing steel for various buildings, and testing of cast-in-place concrete for the referenced project. The results of the observation and testing services completed by EEC personnel during the referenced period are included with this report. Field Density Testing Services During the referenced period, EEC personnel performed field density tests on building backfill material as described herein, that was placed prior to and/or during our site visits. The field density tests were completed at random locations and elevations within the areas tested and were performed in general accordance with ASTM Specification D6938. The field density test results and approximate location of each test completed during the referenced period are shown on the attached summary sheet and associated site diagram. The field density test results conformed to the project specific compaction requirement of at least 95% of standard Proctor maximum dry density (ASTM D698) and were within ± 2% of the material’s optimum moisture content. Earth Engineering Consultants, LLC EEC Project No. 1174094 September 19, 2017 Page 2 Care should be taken during construction to avoid disturbing the subgrade materials. Materials that are loosened or disturbed by the construction activities or materials that become dry and desiccated or wet and softened should be removed and replaced or reworked in place prior to placement of reinforcing steel/concrete. Foundation Reinforcement and UFER Observations During the referenced period, EEC personnel conducted a site visit on August 18, 2017, to perform visual observations of the reinforcing steel placed within Building 1 / DD (881 and 883 Torino Circle) and Building 2 / AD (875 and 877 Torino Circle) foundation elements at the gridlines and/or locations as identified on the enclosed “color-coded/highlighted” site diagrams. The horizontal and vertical reinforcement for cast-in-place foundation systems as indicated herein were completed in general accordance with the Spread Footing Schedule as presented on Sheet S1.1 for the various building plans, as well as the details presented on Sheet S2.1 of the project’s respective structural drawings. Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum requirements. The horizontal and vertical reinforcement for the portions of the foundation systems as noted herein and observed by EEC personnel on the dates indicated, appeared to be in general accordance with details presented on the structural drawings prepared by Larsen Structural Design, dated February 24, 2017. In addition, Beacon Construction personnel requested that EEC provide a general observation of the UFER grounding rod installation for Building 2 / AD, which was installed during the foundation stem-wall reinforcement placement. EEC personnel, during the reinforcement observation, noted two (2) additional approximately 20 foot sections of #4 continuous horizontal rebar attached to the bottom #4 rebar of the stem-wall reinforcement, which transitioned vertically approximately 5 feet to above the top of the foundation wall along the north and south walls of the building. The UFER grounding rods appeared to have been installed in general accordance with typical standards of the industry installation procedures. Testing of Cast-in-Place Concrete During the referenced period, EEC personnel observed and tested Portland cement concrete delivered to the site for placement as indicated on the enclosed daily report for the referenced Proctor Designation A Maximum Dry Density (pcf) 108.0 Optimum Moisture Content (%) 16.5% Required Moisture Variance OMC +/-2% Required Percent Compaction 95% Laboratory Method ASTM D-698 Compliance with Project Specs Elev. / Lift No. Material (Proctor) Percent Moisture Dry Density Moisture (Pass / Fail) %Comp. (Pass / Fail) 1 8/23 1 Building Backfill - See Diagram -1.0 A 16.2% 104.1 -0.3% 96% Pass Pass 2 8/23 2 Building Backfill - See Diagram 0.0 A 14.8% 105.1 -1.7% 97% Pass Pass 3 8/23 3 Building Backfill - See Diagram -1.0 A 14.9% 104.7 -1.6% 97% Pass Pass 4 8/23 4 Building Backfill - See Diagram 0.0 A 15.3% 105.5 -1.2% 98% Pass Pass 5 8/23 5 Building Backfill - See Diagram 0.0 A 15.7% 104.8 -0.8% 97% Pass Pass 6 8/24 1 Building Backfill - See Diagram -1.0 A 15.0% 105.6 -1.5% 98% Pass Pass 7 8/24 2 Building Backfill - See Diagram -1.0 A 15.4% 104.5 -1.1% 97% Pass Pass 8 8/24 3 Building Backfill - See Diagram 0.0 A 16.1% 107.3 -0.4% 99% Pass Pass 9 8/24 4 Building Backfill - See Diagram -1.0 A 16.6% 107.1 0.1% 99% Pass Pass 10 8/24 5 Building Backfill - See Diagram -1.0 A 16.8% 106.1 0.3% 98% Pass Pass 11 8/25 1 Building Backfill - See Diagram 0.0 A 17.1% 106.1 0.6% 98% Pass Pass 12 8/25 2 Building Backfill - See Diagram -1.0 A 16.8% 104.6 0.3% 97% Pass Pass 13 8/25 3 Building Backfill - See Diagram 0.0 A 15.9% 105.2 -0.6% 97% Pass Pass 14 8/25 4 Building Backfill - See Diagram 0.0 A 16.4% 106.5 -0.1% 99% Pass Pass 15 8/26 1 Building Backfill - See Diagram -1.0 A 15.8% 106.8 -0.7% 99% Pass Pass 16 8/26 2 Building Backfill - See Diagram -1.0 A 16.0% 104.3 -0.5% 97% Pass Pass 17 8/26 3 Building Backfill - See Diagram 0.0 A 16.3% 105.6 -0.2% 98% Pass Pass 18 8/26 4 Building Backfill - See Diagram 0.0 A 15.5% 106.0 -1.0% 98% Pass Pass SUMMARY OF FIELD DENSITY TESTS Location: Fort Collins, Colorado Project No: Date: 1174094 August 2017 EARTH ENGINEERING CONSULTANTS, LLC Approximate Test Location / Notes Daily Test Number Date Consecutive Test Number Moisture Variance Percent Compaction Field Test Results Project Name: Columbine Residences - Torino Circle Field Density Test Location Diagram Columbine Residences - Torino Circle - Fort Collins, Colorado EEC Project #: 1174094 Fill, Subgrade, & Aggregate Base EARTH ENGINEERING CONSULTANTS, LLC Reinforcing Steel Observation Diagram Building 1 / DD (881 & 883 Torino Circle) Columbine Residences - Torino Circle - Fort Collins, Colorado EEC Project #: 1174094 Date: September 2017 EARTH ENGINEERING CONSULTANTS, LLC Footing Reinforcement Observation 7-31-17 Legend Stem Wall & Pilaster Reinforcement Observation 8-2-17 Column Reinforcement Observation 8-18-17 Reinforcing Steel Observation Diagram Building 2 / AD (875 & 877 Torino Circle) Columbine Residences - Torino Circle - Fort Collins, Colorado EEC Project #: 1174094 Date: September 2017 EARTH ENGINEERING CONSULTANTS, LLC Footing Reinforcement Observation 7-31-17 Legend Footing Pad Reinforcement Observation 8-18-17 Foundation Wall & Column Reinforcement Observation 8-18-17 Placement Date: Placement Location: Concrete Supplier: Water Added on Site: of Required 28 Day Compressive Strength (psi): B Project Number: EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS 60353301 Truck Number: GENERAL INFORMATION 9203 Mix Code: 5304122 None Stem Walls Bulding #1 - SW Corner Aggregate Industries Type of Placement: Pump 8/21/2017 Test No.: 2 Ticket Number: Comments: Yards: 10 39 3000 EEC Technician: DM Batch Time: 8:35 AM Sample Time: 9:20 AM FIELD TEST DATA TEST RESULTS SPECIFICATIONS Slump (in) ASTM C143 4" Air Content (%) ASTM C231 5.6% Unit Weight (pcf) ASTM C138 143.3 ---- Concrete Temperature (deg F) ASTM C1064 74 90° Max Air Temperature at Placement (deg F) ---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average Maximum Cylinder Cylinder Compressive Compressive Failure Strength Strength Number Tested (days) (lbs) (in) (in) (in2) Type (psi) (psi) Specimen Date Age Applied Load Height Diameter Area 2 08/28/17 7 37090 8 4 12.57 Shear 2950 2950 Project: Columbine Residences - Torino Circle Aggregate Industries Beacon Construction - Mr. Dillon Hinchley (dillon@beacon-con.com) Beacon Construction - Mr. Chris Mahlum (chris@beacon-con.com) Beacon Construction - Mr. Tyler Texeira (tyler@beacon-con.com) 1174094 Report Distribution: Columbine Health Systems - Bob Wilson: Bob.Wilson@columbinehealth.com