September 19, 2017
Columbine Health 14th Street, LLC
802 West Drake Road, Suite 101
Fort Collins, Colorado 80526
Attn: Mr. Bob Wilson (Bob.Wilson@columbinehealth.com)
Re: Construction Observation and Testing – Submittal No. 3
Columbine Residences – Torino Circle
Fort Collins, Colorado
EEC Project No. 1174094
Mr. Wilson:
As requested, during the period of August 14 through August 26, 2017, Earth Engineering
Consultants, LLC (EEC) personnel provided construction observation and testing services for the
proposed Columbine Residences project located at Torino Circle in Fort Collins, Colorado.
Those services were provided on a part-time/on-call basis and included observation and field
density testing of building backfill material, observations of foundation reinforcing steel for
various buildings, and testing of cast-in-place concrete for the referenced project. The results of
the observation and testing services completed by EEC personnel during the referenced period
are included with this report.
Field Density Testing Services
During the referenced period, EEC personnel performed field density tests on building backfill
material as described herein, that was placed prior to and/or during our site visits. The field
density tests were completed at random locations and elevations within the areas tested and were
performed in general accordance with ASTM Specification D6938. The field density test results
and approximate location of each test completed during the referenced period are shown on the
attached summary sheet and associated site diagram. The field density test results conformed to
the project specific compaction requirement of at least 95% of standard Proctor maximum dry
density (ASTM D698) and were within ± 2% of the material’s optimum moisture content.
Earth Engineering Consultants, LLC
EEC Project No. 1174094
September 19, 2017
Page 2
Care should be taken during construction to avoid disturbing the subgrade materials. Materials
that are loosened or disturbed by the construction activities or materials that become dry and
desiccated or wet and softened should be removed and replaced or reworked in place prior to
placement of reinforcing steel/concrete.
Foundation Reinforcement and UFER Observations
During the referenced period, EEC personnel conducted a site visit on August 18, 2017, to
perform visual observations of the reinforcing steel placed within Building 1 / DD (881 and 883
Torino Circle) and Building 2 / AD (875 and 877 Torino Circle) foundation elements at the
gridlines and/or locations as identified on the enclosed “color-coded/highlighted” site diagrams.
The horizontal and vertical reinforcement for cast-in-place foundation systems as indicated
herein were completed in general accordance with the Spread Footing Schedule as presented on
Sheet S1.1 for the various building plans, as well as the details presented on Sheet S2.1 of the
project’s respective structural drawings.
Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum
requirements. The horizontal and vertical reinforcement for the portions of the foundation
systems as noted herein and observed by EEC personnel on the dates indicated, appeared to be in
general accordance with details presented on the structural drawings prepared by Larsen
Structural Design, dated February 24, 2017.
In addition, Beacon Construction personnel requested that EEC provide a general observation of
the UFER grounding rod installation for Building 2 / AD, which was installed during the
foundation stem-wall reinforcement placement. EEC personnel, during the reinforcement
observation, noted two (2) additional approximately 20 foot sections of #4 continuous horizontal
rebar attached to the bottom #4 rebar of the stem-wall reinforcement, which transitioned
vertically approximately 5 feet to above the top of the foundation wall along the north and south
walls of the building. The UFER grounding rods appeared to have been installed in general
accordance with typical standards of the industry installation procedures.
Testing of Cast-in-Place Concrete
During the referenced period, EEC personnel observed and tested Portland cement concrete
delivered to the site for placement as indicated on the enclosed daily report for the referenced
Proctor Designation A
Maximum Dry Density (pcf) 108.0
Optimum Moisture Content (%) 16.5%
Required Moisture Variance OMC +/-2%
Required Percent Compaction 95%
Laboratory Method ASTM D-698
Compliance with
Project Specs
Elev. / Lift
No.
Material
(Proctor)
Percent
Moisture
Dry
Density
Moisture
(Pass /
Fail)
%Comp.
(Pass /
Fail)
1 8/23 1 Building Backfill - See Diagram -1.0 A 16.2% 104.1 -0.3% 96% Pass Pass
2 8/23 2 Building Backfill - See Diagram 0.0 A 14.8% 105.1 -1.7% 97% Pass Pass
3 8/23 3 Building Backfill - See Diagram -1.0 A 14.9% 104.7 -1.6% 97% Pass Pass
4 8/23 4 Building Backfill - See Diagram 0.0 A 15.3% 105.5 -1.2% 98% Pass Pass
5 8/23 5 Building Backfill - See Diagram 0.0 A 15.7% 104.8 -0.8% 97% Pass Pass
6 8/24 1 Building Backfill - See Diagram -1.0 A 15.0% 105.6 -1.5% 98% Pass Pass
7 8/24 2 Building Backfill - See Diagram -1.0 A 15.4% 104.5 -1.1% 97% Pass Pass
8 8/24 3 Building Backfill - See Diagram 0.0 A 16.1% 107.3 -0.4% 99% Pass Pass
9 8/24 4 Building Backfill - See Diagram -1.0 A 16.6% 107.1 0.1% 99% Pass Pass
10 8/24 5 Building Backfill - See Diagram -1.0 A 16.8% 106.1 0.3% 98% Pass Pass
11 8/25 1 Building Backfill - See Diagram 0.0 A 17.1% 106.1 0.6% 98% Pass Pass
12 8/25 2 Building Backfill - See Diagram -1.0 A 16.8% 104.6 0.3% 97% Pass Pass
13 8/25 3 Building Backfill - See Diagram 0.0 A 15.9% 105.2 -0.6% 97% Pass Pass
14 8/25 4 Building Backfill - See Diagram 0.0 A 16.4% 106.5 -0.1% 99% Pass Pass
15 8/26 1 Building Backfill - See Diagram -1.0 A 15.8% 106.8 -0.7% 99% Pass Pass
16 8/26 2 Building Backfill - See Diagram -1.0 A 16.0% 104.3 -0.5% 97% Pass Pass
17 8/26 3 Building Backfill - See Diagram 0.0 A 16.3% 105.6 -0.2% 98% Pass Pass
18 8/26 4 Building Backfill - See Diagram 0.0 A 15.5% 106.0 -1.0% 98% Pass Pass
SUMMARY OF FIELD DENSITY TESTS
Location: Fort Collins, Colorado
Project No:
Date:
1174094
August 2017
EARTH ENGINEERING CONSULTANTS, LLC
Approximate Test Location / Notes
Daily Test
Number
Date
Consecutive
Test Number
Moisture
Variance
Percent
Compaction
Field Test Results
Project Name: Columbine Residences - Torino Circle
Field Density Test Location Diagram
Columbine Residences - Torino Circle - Fort Collins, Colorado
EEC Project #: 1174094
Fill, Subgrade, & Aggregate Base
EARTH ENGINEERING CONSULTANTS, LLC
Reinforcing Steel Observation Diagram
Building 1 / DD (881 & 883 Torino Circle)
Columbine Residences - Torino Circle - Fort Collins, Colorado
EEC Project #: 1174094 Date: September 2017
EARTH ENGINEERING CONSULTANTS, LLC
Footing Reinforcement
Observation 7-31-17
Legend
Stem Wall & Pilaster
Reinforcement
Observation 8-2-17
Column Reinforcement
Observation 8-18-17
Reinforcing Steel Observation Diagram
Building 2 / AD (875 & 877 Torino Circle)
Columbine Residences - Torino Circle - Fort Collins, Colorado
EEC Project #: 1174094 Date: September 2017
EARTH ENGINEERING CONSULTANTS, LLC
Footing Reinforcement
Observation 7-31-17
Legend
Footing Pad
Reinforcement
Observation 8-18-17
Foundation Wall &
Column Reinforcement
Observation 8-18-17
Placement Date:
Placement Location:
Concrete Supplier:
Water Added on Site:
of
Required 28 Day Compressive Strength (psi):
B
Project Number:
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
60353301 Truck Number:
GENERAL INFORMATION
9203
Mix Code: 5304122 None
Stem Walls Bulding #1 - SW Corner
Aggregate Industries Type of Placement: Pump
8/21/2017 Test No.: 2
Ticket Number:
Comments:
Yards: 10 39
3000 EEC Technician: DM
Batch Time: 8:35 AM Sample Time: 9:20 AM
FIELD TEST DATA
TEST RESULTS SPECIFICATIONS
Slump (in) ASTM C143 4"
Air Content (%) ASTM C231 5.6%
Unit Weight (pcf) ASTM C138 143.3 ----
Concrete Temperature (deg F) ASTM C1064 74 90° Max
Air Temperature at Placement (deg F) ----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
Maximum Cylinder Cylinder Compressive Compressive
Failure Strength Strength
Number Tested (days) (lbs) (in) (in) (in2) Type (psi) (psi)
Specimen Date Age Applied Load Height Diameter Area
2 08/28/17 7 37090 8 4 12.57 Shear 2950 2950
Project: Columbine Residences - Torino Circle
Aggregate Industries
Beacon Construction - Mr. Dillon Hinchley (dillon@beacon-con.com)
Beacon Construction - Mr. Chris Mahlum (chris@beacon-con.com)
Beacon Construction - Mr. Tyler Texeira (tyler@beacon-con.com)
1174094 Report Distribution:
Columbine Health Systems - Bob Wilson: Bob.Wilson@columbinehealth.com
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
(970) 545-3908 FAX (970) 663-0282
September 19, 2017
Columbine Health 14th Street, LLC
802 West Drake Road, Suite 101
Fort Collins, Colorado 80526
Attn: Mr. Bob Wilson (Bob.Wilson@columbinehealth.com)
Re: Construction Observation and Testing – Submittal No. 3
Columbine Residences – Torino Circle
Fort Collins, Colorado
EEC Project No. 1174094
Mr. Wilson:
As requested, during the period of August 14 through August 26, 2017, Earth Engineering
Consultants, LLC (EEC) personnel provided construction observation and testing services for the
proposed Columbine Residences project located at Torino Circle in Fort Collins, Colorado.
Those services were provided on a part-time/on-call basis and included observation and field
density testing of building backfill material, observations of foundation reinforcing steel for
various buildings, and testing of cast-in-place concrete for the referenced project. The results of
the observation and testing services completed by EEC personnel during the referenced period
are included with this report.
Field Density Testing Services
During the referenced period, EEC personnel performed field density tests on building backfill
material as described herein, that was placed prior to and/or during our site visits. The field
density tests were completed at random locations and elevations within the areas tested and were
performed in general accordance with ASTM Specification D6938. The field density test results
and approximate location of each test completed during the referenced period are shown on the
attached summary sheet and associated site diagram. The field density test results conformed to
the project specific compaction requirement of at least 95% of standard Proctor maximum dry
density (ASTM D698) and were within ± 2% of the material’s optimum moisture content.
Earth Engineering Consultants, LLC
EEC Project No. 1174094
September 19, 2017
Page 2
Care should be taken during construction to avoid disturbing the subgrade materials. Materials
that are loosened or disturbed by the construction activities or materials that become dry and
desiccated or wet and softened should be removed and replaced or reworked in place prior to
placement of reinforcing steel/concrete.
Foundation Reinforcement and UFER Observations
During the referenced period, EEC personnel conducted a site visit on August 18, 2017, to
perform visual observations of the reinforcing steel placed within Building 1 / DD (881 and 883
Torino Circle) and Building 2 / AD (875 and 877 Torino Circle) foundation elements at the
gridlines and/or locations as identified on the enclosed “color-coded/highlighted” site diagrams.
The horizontal and vertical reinforcement for cast-in-place foundation systems as indicated
herein were completed in general accordance with the Spread Footing Schedule as presented on
Sheet S1.1 for the various building plans, as well as the details presented on Sheet S2.1 of the
project’s respective structural drawings.
Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum
requirements. The horizontal and vertical reinforcement for the portions of the foundation
systems as noted herein and observed by EEC personnel on the dates indicated, appeared to be in
general accordance with details presented on the structural drawings prepared by Larsen
Structural Design, dated February 24, 2017.
In addition, Beacon Construction personnel requested that EEC provide a general observation of
the UFER grounding rod installation for Building 2 / AD, which was installed during the
foundation stem-wall reinforcement placement. EEC personnel, during the reinforcement
observation, noted two (2) additional approximately 20 foot sections of #4 continuous horizontal
rebar attached to the bottom #4 rebar of the stem-wall reinforcement, which transitioned
vertically approximately 5 feet to above the top of the foundation wall along the north and south
walls of the building. The UFER grounding rods appeared to have been installed in general
accordance with typical standards of the industry installation procedures.
Testing of Cast-in-Place Concrete
During the referenced period, EEC personnel observed and tested Portland cement concrete
delivered to the site for placement as indicated on the enclosed daily report for the referenced
Proctor Designation A
Maximum Dry Density (pcf) 108.0
Optimum Moisture Content (%) 16.5%
Required Moisture Variance OMC +/-2%
Required Percent Compaction 95%
Laboratory Method ASTM D-698
Compliance with
Project Specs
Elev. / Lift
No.
Material
(Proctor)
Percent
Moisture
Dry
Density
Moisture
(Pass /
Fail)
%Comp.
(Pass /
Fail)
1 8/23 1 Building Backfill - See Diagram -1.0 A 16.2% 104.1 -0.3% 96% Pass Pass
2 8/23 2 Building Backfill - See Diagram 0.0 A 14.8% 105.1 -1.7% 97% Pass Pass
3 8/23 3 Building Backfill - See Diagram -1.0 A 14.9% 104.7 -1.6% 97% Pass Pass
4 8/23 4 Building Backfill - See Diagram 0.0 A 15.3% 105.5 -1.2% 98% Pass Pass
5 8/23 5 Building Backfill - See Diagram 0.0 A 15.7% 104.8 -0.8% 97% Pass Pass
6 8/24 1 Building Backfill - See Diagram -1.0 A 15.0% 105.6 -1.5% 98% Pass Pass
7 8/24 2 Building Backfill - See Diagram -1.0 A 15.4% 104.5 -1.1% 97% Pass Pass
8 8/24 3 Building Backfill - See Diagram 0.0 A 16.1% 107.3 -0.4% 99% Pass Pass
9 8/24 4 Building Backfill - See Diagram -1.0 A 16.6% 107.1 0.1% 99% Pass Pass
10 8/24 5 Building Backfill - See Diagram -1.0 A 16.8% 106.1 0.3% 98% Pass Pass
11 8/25 1 Building Backfill - See Diagram 0.0 A 17.1% 106.1 0.6% 98% Pass Pass
12 8/25 2 Building Backfill - See Diagram -1.0 A 16.8% 104.6 0.3% 97% Pass Pass
13 8/25 3 Building Backfill - See Diagram 0.0 A 15.9% 105.2 -0.6% 97% Pass Pass
14 8/25 4 Building Backfill - See Diagram 0.0 A 16.4% 106.5 -0.1% 99% Pass Pass
15 8/26 1 Building Backfill - See Diagram -1.0 A 15.8% 106.8 -0.7% 99% Pass Pass
16 8/26 2 Building Backfill - See Diagram -1.0 A 16.0% 104.3 -0.5% 97% Pass Pass
17 8/26 3 Building Backfill - See Diagram 0.0 A 16.3% 105.6 -0.2% 98% Pass Pass
18 8/26 4 Building Backfill - See Diagram 0.0 A 15.5% 106.0 -1.0% 98% Pass Pass
SUMMARY OF FIELD DENSITY TESTS
Location: Fort Collins, Colorado
Project No:
Date:
1174094
August 2017
EARTH ENGINEERING CONSULTANTS, LLC
Approximate Test Location / Notes
Daily Test
Number
Date
Consecutive
Test Number
Moisture
Variance
Percent
Compaction
Field Test Results
Project Name: Columbine Residences - Torino Circle
Field Density Test Location Diagram
Columbine Residences - Torino Circle - Fort Collins, Colorado
EEC Project #: 1174094
Fill, Subgrade, & Aggregate Base
EARTH ENGINEERING CONSULTANTS, LLC
Reinforcing Steel Observation Diagram
Building 1 / DD (881 & 883 Torino Circle)
Columbine Residences - Torino Circle - Fort Collins, Colorado
EEC Project #: 1174094 Date: September 2017
EARTH ENGINEERING CONSULTANTS, LLC
Footing Reinforcement
Observation 7-31-17
Legend
Stem Wall & Pilaster
Reinforcement
Observation 8-2-17
Column Reinforcement
Observation 8-18-17
Reinforcing Steel Observation Diagram
Building 2 / AD (875 & 877 Torino Circle)
Columbine Residences - Torino Circle - Fort Collins, Colorado
EEC Project #: 1174094 Date: September 2017
EARTH ENGINEERING CONSULTANTS, LLC
Footing Reinforcement
Observation 7-31-17
Legend
Footing Pad
Reinforcement
Observation 8-18-17
Foundation Wall &
Column Reinforcement
Observation 8-18-17
Placement Date:
Placement Location:
Concrete Supplier:
Water Added on Site:
of
Required 28 Day Compressive Strength (psi):
B
Project Number:
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
60353301 Truck Number:
GENERAL INFORMATION
9203
Mix Code: 5304122 None
Stem Walls Bulding #1 - SW Corner
Aggregate Industries Type of Placement: Pump
8/21/2017 Test No.: 2
Ticket Number:
Comments:
Yards: 10 39
3000 EEC Technician: DM
Batch Time: 8:35 AM Sample Time: 9:20 AM
FIELD TEST DATA
TEST RESULTS SPECIFICATIONS
Slump (in) ASTM C143 4"
Air Content (%) ASTM C231 5.6%
Unit Weight (pcf) ASTM C138 143.3 ----
Concrete Temperature (deg F) ASTM C1064 74 90° Max
Air Temperature at Placement (deg F) ----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
Maximum Cylinder Cylinder Compressive Compressive
Failure Strength Strength
Number Tested (days) (lbs) (in) (in) (in2) Type (psi) (psi)
Specimen Date Age Applied Load Height Diameter Area
2 08/28/17 7 37090 8 4 12.57 Shear 2950 2950
Project: Columbine Residences - Torino Circle
Aggregate Industries
Beacon Construction - Mr. Dillon Hinchley (dillon@beacon-con.com)
Beacon Construction - Mr. Chris Mahlum (chris@beacon-con.com)
Beacon Construction - Mr. Tyler Texeira (tyler@beacon-con.com)
1174094 Report Distribution:
Columbine Health Systems - Bob Wilson: Bob.Wilson@columbinehealth.com