RE: Foothills Mall Multifamily – Building 08 – Final Inspection Report
Permit No. B1601385
418 E. Foothills Parkway
Fort Collins, Colorado
Olsson Associates Project No. 016-1668
Dear Mr. Isgrig:
In accordance with your request, representatives of Olsson Associates have provided
Special Inspections and Construction Materials Testing services at the above referenced
site. The items observed include foundation bearing materials, structural fill placement,
reinforced concrete, post-tension tendon placement and elongation measurement,
structural steel observation, and placement of the ATS shear wall hold downs. Our
services were provided on a part to full-time basis between October 21, 2016 and
December 27, 2017 as scheduled by the general contractor.
Summary of Activities
Foundation Bearing Materials
The bearing materials in the bases of the grade-beam footing excavations in the following
locations were observed during this reporting period:
November 3, 2016 - Bearing evaluation along Lines A-C, 1-5
November 4, 2016 - Hand auger testing along Line B, 1-5
The bearing materials were evaluated with respect to the 1,500-psf design bearing
pressure. Hand auger testing was performed to sample material beneath the bearing
materials to delineate areas of deleterious debris. Encountered deleterious material
beneath the foundation systems and “ribs” of the post-tensioned floor slab between Lines
A-C, 1-5 was removed.
Page 2 of 3
Earthwork Observation
Samples of on-site and imported materials were obtained for laboratory moisture-density
(standard Proctor), P-200, and Atterberg Limits testing. Field moisture-density tests were
performed on the structural fill placed in the following locations during this reporting
period:
October 21, 2016 - Utility trench backfill along Line B, 2-3
November 2, 2016 - Structural fill between Lines A-C, 1-5
Results of the field density tests are summarized in the attached reports.
Concrete Observation
Placement of the reinforcing steel and concrete in the following locations was observed
during this reporting period:
November 7, 2016 - Foundations and grade beams between Lines A-C, 1-5
November 8, 2016 - Foundations and grade beams between Lines A-C, 1-5
November 16, 2016 - Post-tensioned floor slab between Lines A-C, 1-5
November 19, 2016 - Post-tensioned floor slab between Lines A-C, 1-5
Placement of the reinforcing steel in the above referenced locations was observed on a
part-time basis. Field tests were performed and test specimens were cast with concrete
placed in these locations. Olsson’s field representatives observed the placement of
concrete on a full-time basis. Results of the compressive strength tests can be found in
the attached reports.
Post-Tensioned Concrete Observation
Olsson observed the marking and stressing of the post-tensioned tendons within the floor
slab of Building 8 on a full-time basis during this reporting period:
November 16, 2016 - Tendon layout in the floor slab between Lines A-C, 1-5
December 1, 2016 - 100% stressing of post-tension tendons Lines A-C, 1-5
December 22, 2016 - 100% stressing of post-tension tendons Lines A-C, 1-5
Olsson prepared post-tensioned tendon layouts to number and reference each individual
tendon. Final elongations were measured and reported to the post-tension slab designer
for approval. The measured elongations can be found in the attached reports.
Shear Wall Hold Down Observation
On November 15, 2017 and December 27, 2017, the placement of the ATS hold down
system hardware was observed including plate to anchor bolt welds, rod sizes and nut
connections.
Status of Compliance
This report represents Olsson's final inspection report for Building 8 at the Foothills Mall
Multifamily Apartment Complex in Fort Collins, Colorado. The special inspection items
observed and tested by our field personnel include foundation bearing materials,
structural fill placement, reinforced concrete, post-tensioned tendon placement, and
elongation measurements and placement of the ATS shear wall hold-down system. To
the best of our belief and knowledge, the items observed and/or tested by our field
personnel and explicitly reported in the attached test and inspection reports were in
general compliance with the project specifications or recommendations of the design
engineer.
If you have any questions regarding this report, or if we may be of any further service,
please contact us at 303.237.2072.
Respectfully Submitted;
OLSSON ASSOCIATES
Attachments
Compaction Test Reports
Compressive Strength of Concrete Reports
Post-Tension Observation Reports
Special Inspection Daily Reports
Page 3 of 3
Braden Hirsch, PE
Associate Engineer
Colorado License No. 51920
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min/Max
Comp.
(%)
Optimum
Moisture
Tolerance (%) Remark
401 10/21/16 3 C SP-SC 12.2 122.1 11.2 118.3 8 97 95 / 103 -2 / 2 A
402 10/21/16 3 C SP-SC 12.2 122.1 12.0 115.4 8 95 95 / 103 -2 / 2 A
Test Information
Test # Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
401 Utility Trench Backfill: Building 8- Interior Water Grid B-2 0.0 FSE Troxler 3440 23106 Sheppard, Jordan
402 Utility Trench Backfill: Building 8; Interior water Grid B-3 0.0 FSE Troxler 3440 23106 Sheppard, Jordan
Remarks
A: Tests results comply with specifications
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
Page 1 of 1
Compaction Test Report
Test Method: ASTM D 6938
Report #: SNG-000090
Client:
McWhinney Real Estate Services, Inc.
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
3990 Fox Street Fort Collins, CO
Denver, CO 80216
Phone: 303-237-2072 | Fax: 303-237-2659
Denver
Braden Hirsch
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min/Max
Comp.
(%)
Optimum
Moisture
Tolerance (%) Remark
414 11/4/16 4 B SM 7.2 125.2 7.4 125.5 8 100 95 / 103 -2 / 2 A
415 11/4/16 4 B SM 7.2 125.2 8.4 121.9 8 97 95 / 103 -2 / 2 A
416 11/4/16 4 B SM 7.2 125.2 9.2 119.8 8 96 95 / 103 -2 / 2 A
Test Information
Test # Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
414 Structural Fill: Building 8, Line 2, A-B 0.0 FSE Troxler 3440 23106 Sheppard, Jordan
415 Structural Fill: Building 8; Line B, 3-4 0.0 FSE Troxler 3440 23106 Sheppard, Jordan
416 Structural Fill: Building 8; Line C,4-5 0.0 FSE Troxler 3440 23106 Sheppard, Jordan
Remarks
A: Tests results comply with specifications
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
Page 1 of 1
Compaction Test Report
Test Method: ASTM D 6938
Report #: SNG-000099
Client:
McWhinney Real Estate Services, Inc.
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
3990 Fox Street Fort Collins, CO
Denver, CO 80216
Phone: 303-237-2072 | Fax: 303-237-2659
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
99-1 7 11/16/16 0 / 7 4.00 12.57 57,990 4,610 2 A1 U
99-2 28 12/07/16 0 / 28 4.01 12.63 77,990 6,180 2 B1 U
99-3 28 12/07/16 0 / 28 4.01 12.63 72,680 5,760 2 B1 U
99-4 28 12/07/16 0 / 28 4.01 12.63 77,160 6,110 3 B1 U
99-5 28 H 12/07/16 0 / 28
Test Age Average Strengths (psi): 7 Day - 4610, 28 Day - 6010
Break Remarks
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 99
Specimen Size: 4" X 8"
Specimens In Set: 5
Truck / Ticket #: 1622 / 49097617
Contractor: GBC Concrete
Technician: Sheppard, Jordan
Cast By: Sheppard, Jordan
Date Cast: 11/09/16
Sampled From: End of Pump
Placement Method: Pump
Sample Details
Batched: 08:35 MST
Sampled: 09:20 MST
Cast: 09:35 MST
Truck Empty: 09:33 MST
Placement Time: 58 (min)
Placement Location: Footing
Location Details: Building 8; Line A, 1-3
Sample Location / Notes: Grid A-1
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Plant: 751 Rigden 16349
Mix Design: N4513SP
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
100-1 7 11/15/16 1 / 6 4.01 12.63 43,730 3,460 2 A1 U
100-2 28 12/06/16 1 / 27 4.01 12.63 61,810 4,890 2 B1 U
100-3 28 12/06/16 1 / 27 4.01 12.63 63,610 5,040 3 B1 U
100-4 28 12/06/16 1 / 27 4.01 12.63 67,080 5,310 2 B1 U
100-5 28 H 12/06/16 1 / 27
Test Age Average Strengths (psi): 7 Day - 3460, 28 Day - 5080
Break Remarks
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 100
Specimen Size: 4" X 8"
Specimens In Set: 5
Truck / Ticket #: 1732 / 49097636
Contractor: GBC Concrete
Technician: Sheppard, Jordan
Cast By: Sheppard, Jordan
Date Cast: 11/08/16
Sampled From: End of Pump
Placement Method: Pump
Sample Details
Batched: 09:44 MST
Sampled: 10:22 MST
Cast: 10:35 MST
Truck Empty: 10:30 MST
Placement Time: 46 (min)
Placement Location: Footing
Location Details: Building 8; Line C,3-5
Sample Location / Notes: Grid C-3
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Plant: 751 Rigden 16349
Mix Design: N4513SP
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
109-1 3 11/22/16 3 / 0 4.01 12.63 33,310 2,640 2 A2 U
109-2 9 11/28/16 2 / 7 4.01 12.63 61,130 4,840 2 A1 U
109-3 30 12/19/16 2 / 28 4.01 12.63 79,700 6,310 2 B1 U
109-4 30 12/19/16 2 / 28 4.03 12.76 72,900 5,710 2 B1 U
109-5 30 12/19/16 2 / 28 4.02 12.69 70,060 5,520 2 B1 U
109-6 30 H 12/19/16 2 / 28
Test Age Average Strengths (psi): 3 Day - 2640, 9 Day - 4840, 30 Day - 5850
Break Remarks
A2: Test result is less than 75% of the 28 day specified strength.
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 109
Specimen Size: 4" X 8"
Specimens In Set: 6
Truck / Ticket #: 510 / 49098726
Contractor: GBC Concrete
Technician: Kozlowski, John
Cast By: Kozlowski, John
Date Cast: 11/19/16
Sampled From: End of Pump
Placement Method: Pump
Sample Details
Batched: 06:58 MST
Sampled: 08:00 MST
Cast: 08:15 MST
Truck Empty: 08:25 MST
Placement Time: 87 (min)
Placement Location: Slab on Grade - Interior
Location Details: Building 8
Sample Location / Notes: Lines A.1-4
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
110-1 3 11/22/16 3 / 0 4.01 12.63 34,420 2,730 2 A2 U
110-2 9 11/28/16 2 / 7 4.01 12.63 69,410 5,500 2 A1 U
110-3 30 12/19/16 2 / 28 4.01 12.63 83,850 6,640 3 B1 U
110-4 30 12/19/16 2 / 28 4.01 12.63 84,670 6,700 2 B1 U
110-5 30 12/19/16 2 / 28 4.01 12.63 81,500 6,450 3 B1 U
110-6 30 H 12/19/16 2 / 28
Test Age Average Strengths (psi): 3 Day - 2730, 9 Day - 5500, 30 Day - 6600
Break Remarks
A2: Test result is less than 75% of the 28 day specified strength.
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 110
Specimen Size: 4" X 8"
Specimens In Set: 6
Truck / Ticket #: 509 / 49098737
Contractor: GBC Concrete
Technician: Kozlowski, John
Cast By: Kozlowski, John
Date Cast: 11/19/16
Sampled From: End of Pump
Placement Method: Pump
Sample Details
Batched: 08:11 MST
Sampled: 08:55 MST
Cast: 09:10 MST
Truck Empty: 09:30 MST
Placement Time: 79 (min)
Placement Location: Slab on Grade - Interior
Location Details: Building 8
Sample Location / Notes: Lines B.2-4.1
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
111-1 3 11/22/16 3 / 0 4.01 12.63 33,650 2,660 3 A2 U
111-2 9 11/28/16 2 / 7 4.01 12.63 63,210 5,010 2 A1 U
111-3 30 12/19/16 2 / 28 4.01 12.63 75,250 5,960 3 B1 U
111-4 30 12/19/16 2 / 28 4.00 12.57 76,810 6,110 2 B1 U
111-5 30 12/19/16 2 / 28 4.02 12.69 73,310 5,780 3 B1 U
111-6 30 H 12/19/16 2 / 28
Test Age Average Strengths (psi): 3 Day - 2660, 9 Day - 5010, 30 Day - 5950
Break Remarks
A2: Test result is less than 75% of the 28 day specified strength.
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 111
Specimen Size: 4" X 8"
Specimens In Set: 6
Truck / Ticket #: 1408 / 49098748
Contractor: GBC Concrete
Technician: Kozlowski, John
Cast By: Kozlowski, John
Date Cast: 11/19/16
Sampled From: End of Pump
Placement Method: Pump
Sample Details
Batched: 09:05 MST
Sampled: 09:50 MST
Cast: 10:05 MST
Truck Empty: 10:10 MST
Placement Time: 65 (min)
Placement Location: Slab on Grade - Interior
Location Details: Building 8
Sample Location / Notes: Lines B.1-2.2
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
112-1 3 11/22/16 3 / 0 4.01 12.63 33,100 2,620 2 A2 U
112-2 9 11/28/16 2 / 7 4.01 12.63 59,290 4,690 2 A1 U
112-3 30 12/19/16 2 / 28 4.00 12.57 75,240 5,990 2 B1 U
112-4 30 12/19/16 2 / 28 4.01 12.63 71,000 5,620 2 B1 U
112-5 30 12/19/16 2 / 28 4.02 12.69 74,840 5,900 3 B1 U
112-6 30 H 12/19/16 2 / 28
Test Age Average Strengths (psi): 3 Day - 2620, 9 Day - 4690, 30 Day - 5840
Break Remarks
A2: Test result is less than 75% of the 28 day specified strength.
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 112
Specimen Size: 4" X 8"
Specimens In Set: 6
Truck / Ticket #: 510 / 49098748
Contractor: GBC Concrete
Technician: Kozlowski, John
Cast By: Kozlowski, John
Date Cast: 11/19/16
Sampled From: Truck Chute
Placement Method: Pump
Sample Details
Batched: 10:15 MST
Sampled: 10:50 MST
Cast: 11:05 MST
Truck Empty: 11:05 MST
Placement Time: 50 (min)
Placement Location: Slab on Grade - Interior
Location Details: Building 8
Sample Location / Notes: Lines A.2-2.1
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
113-1 3 11/22/16 3 / 0 4.01 12.63 32,880 2,600 2 A2 U
113-2 9 11/28/16 2 / 7 4.01 12.63 56,690 4,490 2 A1 U
113-3 30 12/19/16 2 / 28 4.01 12.63 70,740 5,600 2 B1 U
113-4 30 12/19/16 2 / 28 4.01 12.63 68,060 5,390 2 B1 U
113-5 30 12/19/16 2 / 28 4.02 12.69 73,210 5,770 2 B1 U
113-6 30 H 12/19/16 2 / 28
Test Age Average Strengths (psi): 3 Day - 2600, 9 Day - 4490, 30 Day - 5590
Break Remarks
A2: Test result is less than 75% of the 28 day specified strength.
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 113
Specimen Size: 4" X 8"
Specimens In Set: 6
Truck / Ticket #: 1507 / 49098774
Contractor: GBC Concrete
Technician: Kozlowski, John
Cast By: Kozlowski, John
Date Cast: 11/19/16
Sampled From: Truck Chute
Placement Method: Pump
Sample Details
Batched: 11:15 MST
Sampled: 12:00 MST
Cast: 12:15 MST
Truck Empty: 12:30 MST
Placement Time: 75 (min)
Placement Location: Slab on Grade - Interior
Location Details: Building 8
Sample Location / Notes: Lines B.4-2
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
114-1 3 11/22/16 3 / 0 4.01 12.63 31,630 2,500 2 A2 U
114-2 9 11/28/16 2 / 7 4.01 12.63 54,010 4,280 2 A1 U
114-3 30 12/19/16 2 / 28 4.01 12.63 69,940 5,540 2 B1 U
114-4 30 12/19/16 2 / 28 4.02 12.69 71,270 5,620 3 B1 U
114-5 30 12/19/16 2 / 28 4.01 12.63 71,100 5,630 2 B1 U
114-6 30 H 12/19/16 2 / 28
Test Age Average Strengths (psi): 3 Day - 2500, 9 Day - 4280, 30 Day - 5590
Break Remarks
A2: Test result is less than 75% of the 28 day specified strength.
A1: Test result meets or exceeds 75% of the 28 day specified strength.
B1: Test result meets or exceeds the 28 day specified strength.
Capping Methods
U: Unbonded Caps (ASTM C1231)
Set #: 114
Specimen Size: 4" X 8"
Specimens In Set: 6
Truck / Ticket #: 306 / 49098783
Contractor: GBC Concrete
Technician: Kozlowski, John
Cast By: Kozlowski, John
Date Cast: 11/19/16
Sampled From: End of Pump
Placement Method: Pump
Sample Details
Batched: 12:28 MST
Sampled: 13:05 MST
Cast: 13:20 MST
Truck Empty: 13:30 MST
Placement Time: 62 (min)
Placement Location: Slab on Grade - Interior
Location Details: Building 8
Sample Location / Notes: Lines A.2-1.2
Batch Log
Strength: 4000 (psi)
Air: 0.0 - 4.0 (%)
Slump: 4 - 7 (in)
Specifications
Supplier: Martin Marietta Materials
M1 M2
3.0000
2.7500
2.8750
8.5000 0.8750 X
8.8750 0.5000 X
8.5000 1.0000 X
8.7500 0.7500 X
8.6250 1.1250 X
8.3750 1.0000 X
8.1250 1.3750 X
8.7500 1.1250 X
8.0000 1.6250 X
8.5000 1.2500 X
8.7500 0.6250 X
8.6250 1.0000 X
8.7500 0.8750 X
8.6250 1.0000 X
9.0000 0.3750 X
8.7500 0.6250 X
8.5000 0.8750 X
8.8750 1.0000 X
8.0000 1.7500 X
8.1250 1.1250 X
7.8750 1.3750 X
8.6250 0.8750 X
8.3750 1.1250 X
8.5000 0.8750 X
8.3750 1.1250 X
7.8750 1.5000 X
3.3750
Technican: Jordan Sheppard
Date: 12/1/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
PT8-2
19
20
21
22
23
PT8-11
PT8-12
PT8-13
PT8-14
PT8-15
M1 M2
Technican: Jordan Sheppard
Date: 12/1/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
1 PT8-1 3.3750
3.5000
2.0000
2.0000
1.6250
1.5000
2.2500
2.3750
5.1250
5.1250
5.2500
5.0000
5.0000
5.1250
5.0000
5.1250
5.0000
5.1250
5.0000
5.0000
5.1250
5.1250
5.0000
5.0000
5.0000
5.0000
4.7500
4.7500
50
51
52
53
42
43
44
45
46
47
36
37
48
M1 M2
Technican: Jordan Sheppard
Date: 12/1/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
1 PT8-1 4.8750
4.6250
4.5000
4.7500
4.5000
4.6250
4.6250
4.7500
4.6250
4.6250
4.7500
4.6250
4.7500
4.8750
4.6250
4.5000
4.7500
4.5000
4.5000
4.6250
4.5000
4.6250
4.8750
4.8750
5.0000
4.8750
4.8750
5.0000
5.0000
4.8750
66
67
68
69
70
71
61
62
63
64
65
M1 M2
Technican: Jordan Sheppard
Date: 12/1/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
1 PT8-1 4.8750
5.0000
2.8750
3.0000
7.6250
7.2500
3.5000
3.7500
6.2500
6.5000
1.7500
1.8750
6.8750
7.0000
2.6250
2.5000
4.7500
5.0000
0
0.25
100.00%
96.49%
110
111
112
113
5.0000
102
103
104
105
106
107
96
97
98
99
100
101
91
92
M1 M2
3.0000
2.7500
2.8750
8.5000 0.8750 X
8.8750 0.5000 X
8.5000 1.0000 X
8.7500 0.7500 X
8.6250 1.1250 X
8.3750 1.0000 X
8.1250 1.3750 X
8.7500 1.1250 X
8.0000 1.6250 X
8.5000 1.2500 X
8.7500 0.6250 X
8.6250 1.0000 X
8.7500 0.8750 X
8.6250 1.0000 X
9.0000 0.3750 X
8.7500 0.6250 X
8.5000 0.8750 X
8.8750 1.0000 X
8.0000 1.7500 X
8.1250 1.1250 X
7.8750 1.3750 X
8.6250 0.8750 X
8.3750 1.1250 X
8.5000 0.8750 X
8.3750 1.1250 X
7.8750 1.5000 X
3.3750
Technican: Jordan Sheppard
Date: 12/22/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
PT8-2
19
20
21
22
23
PT8-11
PT8-12
PT8-13
PT8-14
PT8-15
M1 M2
Technican: Jordan Sheppard
Date: 12/22/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
1 PT8-1 3.3750
3.5000
2.0000
2.0000
1.6250
1.5000
2.2500
2.3750
5.0000
5.1250
5.1250
5.1250
5.2500
5.0000
5.0000
5.1250
5.0000
5.1250
5.0000
5.1250
5.0000
5.0000
5.1250
5.1250
5.0000
5.0000
5.0000
5.0000
4.7500
4.7500
50
51
52
53
42
43
44
45
46
47
36
M1 M2
Technican: Jordan Sheppard
Date: 12/22/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
1 PT8-1 4.8750
4.6250
4.5000
4.7500
4.5000
4.6250
4.6250
4.7500
4.6250
4.6250
4.7500
4.6250
4.7500
4.8750
4.6250
4.5000
4.7500
4.5000
4.5000
4.6250
4.5000
4.6250
4.8750
4.8750
5.0000
4.8750
4.8750
5.0000
5.0000
4.8750
66
67
68
69
70
71
61
62
63
64
65
M1 M2
Technican: Jordan Sheppard
Date: 12/22/2016
Location: Building 8
Post Tension Observation Report
Re-Stress
Double
Pull
% Elongation
3 5600 3.0000 0 100.00%
Tendon No. Tendon Mark
Design
Elongation
Jack Pressure
Total
Elongation
Elongation
Difference
Measured Elongation
1 PT8-1 4.8750
5.0000
2.8750
3.0000
7.6250
7.2500
3.5000
3.7500
6.2500
6.5000
1.7500
1.8750
6.8750
7.0000
2.6250
2.5000
5.1250
5.0000
4.7500
5.0000
0
0.25
100.00%
96.49%
110
111
112
113
5.0000
102
103
104
105
106
107
96
97
98
99
100
101
General Information
Project Phase: Inspection and Testing
Technician: Sheppard, Jordan Temperature (°F): 64
Date: 10/21/2016 Weather: Sunny
Work Completed
Inspection Item: Location Details:
Utility Trench Backfill Building 8; Line B, 2-3
Tests Performed: Frequency:
Field Density Tests Periodic
Work Completed Description:
OlssonAssociates arrived on-site to observe placement of utility trench backfill within interior plumbing along the referenced
location. Field Density Tests were performed to evaluate the moisture content and in-place dry density of placed utility trench
backfill. The results of the field density tests indicated that the backfill placed along the referenced location had met moisture
specifications and compaction specifications later out by the projects geotechnical report. On-site utility contractor was notified of
these observations and test results.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000146
Report Date: 10/25/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2
Image Description
Compaction of utility trench backfill; Building 8
Special Inspection Daily Report Report #: SI3-000146
Report Date: 10/25/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 2
General Information
Project Phase: Additional Services
Technician: Goetz, Steve Temperature (°F): 70
Date: 11/03/2016 Weather: Sunny
Start Time:13:30 End Time:14:30
Work Completed
Inspection Item: Location Details:
Foundation Bearing Materials Lot 3 Building 8
Tests Performed: Frequency:
None Periodic
Work Completed Description:
Olsson Associates arrived on-site to perform observations of the foundation bearing conditions for building 8. Olsson observed
that the bearing conditions on line 5 between A and C of building 8 appeared to be free of any deleterious materials and bared
on native brown soils. Olsson however did observe trace amounts of deleterious materials throughout the side walls during
excavations. Due to the findings of asphalt Olsson notified the contractor and site superintendent John w/ Weitz that hand auger
test pits would need to be performed upon Olsson's arrival on 11/4/16.
The site superintendent was notified of these observations.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000206
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2
Image Description
Footing excavation bldg. 8
Special Inspection Daily Report Report #: SI3-000206
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 2
General Information
Project Phase: Additional Services
Technician: Sheppard, Jordan Temperature (°F): 61
Date: 11/04/2016 Weather: Sunn
Start Time:08:00 End Time:12:00
Work Completed
Inspection Item: Location Details:
Foundation Bearing Materials Building 8; Lines 1-5
Tests Performed: Frequency:
Hand Auger Periodic
Work Completed Description:
Olsson Associates arrived on site to observe underlying material within the Building 8 along proposed thickened slab section
within the referenced location. Four test holes were hand augered along the referenced line to a depth of approximately 32" to
evaluate the underlying material. Olsson encountered structural fill on top of a apparently native soil placed up to a depth of 32".
These test results and observations were shared with the on-site superintendent for Weitz and the on-site concrete foreman for
GBC Concrete.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000205
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 3
Image Description
Test Hole; Building 8
Special Inspection Daily Report Report #: SI3-000205
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 3
Image Description
Line B, Building 8
Special Inspection Daily Report Report #: SI3-000205
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 3 of 3
General Information
Project Phase: Inspection and Testing
Technician: Sheppard, Jordan Temperature (°F): 62
Date: 11/04/2016 Weather: Sunny
Work Completed
Inspection Item: Location Details:
Structural Fill Building 8; Lines A-C, 1-5
Tests Performed: Frequency:
Field Density Tests Periodic
Work Completed Description:
Olsson Associates arrived on-site to observe placement of structural fill within the referenced location. Field Density tests were
performed to evaluate the moisture content and in-place dry density of placed structural fill. The results of the field density tests
indicated that the structural fill placed along the referenced location had met moisture and compaction specifications layed out by
the projects geotechnical report. On-site Concrete contractors for GBC Concrete and on-site superintendent for Weitz were
notified of these observations and test results.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000215
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2
Image Description
Building 8
Special Inspection Daily Report Report #: SI3-000215
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 2
General Information
Project Phase: Inspection and Testing
Technician: Kozlowski, John Temperature (°F): 65
Date: 11/07/2016 Weather: Sunny
Start Time:14:30 End Time:15:10
Work Completed
Inspection Item: Location Details:
Reinforcing Steel Building 8 - Foundation
Tests Performed: Frequency:
None Periodic
Work Completed Description:
Olsson Associates arrived on-site to observe the placement reinforcing steel and post tensioned tendons for the shallow
foundations in Building 8. The size, spacing and orientation of the reinforcing steel and tendons were observed and appeared to
be consistent with the project's structural plans.
The on-site superintendent was notified of these observations.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000228
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 3
Image Description
Building Eight, Footer, Reinforcing Steel, Lot Three
Special Inspection Daily Report Report #: SI3-000228
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 3
Image Description
Lot Three, Building Eight, Reinforcing Steel, Footer
Special Inspection Daily Report Report #: SI3-000228
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 3 of 3
General Information
Project Phase: Inspection and Testing
Technician: Sheppard, Jordan Temperature (°F): 59
Date: 11/08/2016 Weather: Sunny
Work Completed
Inspection Item: Location Details:
Footing Building 8; Lines A-C,1-5
Tests Performed: Frequency:
ASTM C143, C231, C1064, C31 Periodic
Work Completed Description:
Olsson Associates arrived on-site to observe placement of concrete into the referenced footing. Olsson observed consolidation
of placed concrete around reinforcement with use of vibrator. Olsson sampled concrete with accordance to ASTM C172. The
sampled concrete was then tested with accordance to ASTM C143, C231, and C1064. The sampled concrete had conformed to
project specifications for slump and entrained air. Five 4"x8" concrete cylinder specimens were prepared with accordance to
ASTM C31 per sample and stored in cooler on-site. On-site Superintendent for Weitz and on-site foreman for GBC Concrete
were notified of these observations and test results.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000227
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2
Image Description
Placement of Concrete; Building 8 footing
Special Inspection Daily Report Report #: SI3-000227
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 2
General Information
Project Phase: Inspection and Testing
Technician: Sheppard, Jordan Temperature (°F): 61
Date: 11/16/2016 Weather: Sunny
Start Time:07:30 End Time:09:30
Work Completed
Inspection Item: Location Details:
Reinforcing Steel Building 8 Post-Tensioned Slab
Tests Performed: Frequency:
None Periodic
Work Completed Description:
Olsson Associates arrived on-site to observe placement of reinforcing steel and post-tension cables within the referenced
location. Olsson observed horizontal reinforcement, spacing, lap splice lengths, clear space distances, as well as post-tension
cable placement and spacing. The observations made showed that the steel reinforcement as well as post-tension cable
placement had appeared to conform to project structural plans and post-tension cable shop drawings. On-site concrete foreman
for GBC Concrete and on-site superintendent for Weitz were notified of these observations.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000222
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 4
Image Description
Reinforcing steel; Building 8
Special Inspection Daily Report Report #: SI3-000222
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 4
Image Description
Reinforcing steel; Building 8
Special Inspection Daily Report Report #: SI3-000222
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 3 of 4
Image Description
Post tension cables; Building 8
Special Inspection Daily Report Report #: SI3-000222
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 4 of 4
General Information
Project Phase: Inspection and Testing
Technician: Kozlowski, John Temperature (°F): 45
Date: 11/19/2016 Weather: Sunny
Start Time:07:30 End Time:14:00
Work Completed
Inspection Item: Location Details:
Post-Tensioned Slab Building 8
Tests Performed: Frequency:
Concrete Testing Continuous
Work Completed Description:
Olsson Associates arrived on-site to observe and perform testing on the interior slab for building 8. Olsson observed the
placement of the concrete done with a pump for the grid lines 1-5 and A-C. Olsson performed several sets of field test and test
specimens were cast from the concrete placed.
The on-site contractor was notified of these observations and test results.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000199
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 4
Image Description
Building 8, Slab on grade, Southwest
Special Inspection Daily Report Report #: SI3-000199
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 4
Image Description
Building 8, Slab on grade, North East
Special Inspection Daily Report Report #: SI3-000199
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 3 of 4
Image Description
Building 8, Slab on grade, South East
Special Inspection Daily Report Report #: SI3-000199
Report Date: 11/23/2016
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
McWhinney Real Estate Services, Inc.
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 4 of 4
General Information
Project Phase: Inspection and Testing
Technician: Sheppard, Jordan Temperature (°F): 43
Date: 12/01/2016 Weather: Sunny
Start Time:11:00 End Time:13:30
Work Completed
Inspection Item: Location Details:
Post-Tensioned Slab Building 8
Tests Performed: Frequency:
None Continuous
Work Completed Description:
Olsson Associates arrived on-site to observe post-tensioning of tendons within post-tension slab along the referenced location.
Upon arrival Olsson observed marking of tendons for measurement datum using a 6" wood block. Olsson observed the use of an
hydraulic pressure jack to pull tendons to 100% of design elongation. Olsson notes that tendons PT8-39, PT8-40, PT8GB-15 and
PT8GB-16 were not pulled due to excessive honeycombing and recommended that voids be patched prior to stressings. Olsson
will provide a completed post-tension observation report to the client at a later date once all tendons have been stressed. On-site
concrete foreman for GBC Concrete and on-site superintendent for Weitz were notified of these observations.
Determination
Discrepancy Noted
Discrepancy Description:
Olsson observed four (4) tendons in the Building 08 post-tensioned slab that had excessive honeycombing in the concrete at the
stressing ends. Per recommendations from Monroe & Newell, the concrete in these locations should be grouted or patched and
re-observed by Olsson prior to stressing.
Status:
Closed
Resolution Date: Resolution Technician:
12/22/2016 Sheppard, Jordan
Resolution Description:
The four (4) tendons in Building 08 post-tensioned slab were repaired and stressed. The PT EOR reviewed and accepted the
measured elongations.
Special Inspection Daily Report Report #: SI3-000293
Report Date: 3/6/2017
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 4
Image Description
Marking of tendons; Building 8
Special Inspection Daily Report Report #: SI3-000293
Report Date: 3/6/2017
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 4
Image Description
Stressing of tendons; Building 8
Special Inspection Daily Report Report #: SI3-000293
Report Date: 3/6/2017
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 3 of 4
Image Description
Honeycombing around tendons; Building 8
Special Inspection Daily Report Report #: SI3-000293
Report Date: 3/6/2017
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 4 of 4
General Information
Project Phase: Inspection and Testing
Technician: Sheppard, Jordan Temperature (°F): 29
Date: 12/22/2016 Weather: Cloudy
Start Time:09:30 End Time:11:00
Work Completed
Inspection Item: Location Details:
Post-Tensioned Slab Building 8
Tests Performed: Frequency:
None Continuous
Work Completed Description:
Olsson Associates arrived on-site to observe post-tensioning of previously in-stressed tendons within post-tension slab along the
referenced location. Upon arrival Olsson observed that honeycombing around previously un-stressed tendons had been patched.
Olsson observed the use of an hydraulic pressure jack to pull tendons to 100% of design elongation. Tendons PT8-39, PT8-40,
PT8GB-15 and PT8GB-16 were Pulled. Olsson will provide a completed post-tension observation report to the client at a later.
On-site concrete foreman for GBC Concrete and on-site superintendent for Weitz were notified of these observations.
Determination
As Specified
Special Inspection Daily Report Report #: SI3-000281
Report Date: 2/1/2017
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2
Image Description
Patched Voids around tendons; Building 8
Special Inspection Daily Report Report #: SI3-000281
Report Date: 2/1/2017
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
016-1668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 2 of 2
General Information
Project Phase: Inspection and Testing
Technician: Goetz, Steve Temperature (°F): 50
Date: 11/15/2017 Weather: Partly Cloudy
Arrival Time: 11:30 Departure Time: 14:15
Work Completed
Inspection Item: Location Details:
Shear Walls ATS Hold downs; Building 8
Tests Performed: Frequency:
None Periodic
Work Completed Description:
Olsson Associates arrived onsite to perform observations of the ATS shear wall hold downs systems. Olsson
met with Trevor the subcontractor and walked all three buildings to verify that hardware was installed as per
plan. Upon observations of building 8 there were several sections that were not completed, Olsson informed the
contractor and Weitz that these sections should be completed and then rescheduled for reinspections.
Determination
Discrepancy Noted
Description:
Building 8 had hardware missing hardware for the (3) T1.4 rods, two on Grid C, 3 and one on Grid B.5, 5. Olsson
also was unable to view T3.7 rods at Grid C.2, 2.2 and C.2, 3.8 as these were covered by sheeting and will need
to be exposed for visual observations. Olsson should be notified of when these have been fixed for reinspection.
Status:
Closed
Resolution Date: Resolution Technician:
11/27/2017 Shaffer, Austin
Resolution Description:
Olsson verified all the missing hardware was in place and was able to visual reinspect all the referenced hold
downs.
Special Inspection Daily Report Report #: SIR000376
Report Date: 1/2/2018
Denver
3990 Fox Street
Denver, CO 80216
Phone: 3032372072
Fax: 3032372659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
0161668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2 1
General Information
Project Phase: Additional Services
Technician: Shaffer, Austin Temperature (°F): 46
Date: 12/27/2017 Weather: Sunny
Arrival Time: 14:00 Departure Time: 15:00
Work Completed
Inspection Item: Location Details:
Shear Walls ATS Hold downs; Building 8
Tests Performed: Frequency:
None Periodic
Work Completed Description:
Olsson Associates arrived onsite to perform reinspection on the ATS shear wall for referenced building. Olsson
was able to visually inspect all referenced hold downs and verify all previously missing hardware was in place.
The onsite framing foreman was notified of these observations.
Determination
As Specified
Special Inspection Daily Report Report #: SIR000377
Report Date: 1/2/2018
Denver
3990 Fox Street
Denver, CO 80216
Phone: 3032372072
Fax: 3032372659
Client:
FMFPE, LLC
2725 Rocky Mountain Ave Ste 200
Loveland, CO 80538
Project:
0161668
McWhinney Foothills Mall Multifamily
Fort Collins, CO
Page 1 of 2 1
91
92
93
94
95
108
109
118
119
120
117
114
115
116
PT8GB-9
PT8GB-12
PT8GB-13
PT8GB-14
PT8GB-3
PT8GB-4
PT8GB-5
PT8GB-6
PT8GB-7
PT8GB-8
PT8-91
PT8-92
PT8GB-1
PT8GB-2
PT8GB-10
PT8GB-11
PT8GB-18
PT8GB-15
PT8GB-16
PT8GB-17
6 3/8
1 7/8
7 1/8
2 1/2
3
8 1/4
8 1/4
3 3/4
3 3/4
6 3/8
5 1/8
5 1/8
3
1 7/8
7 1/8
5
2 1/2
5 3/8
5 3/8
5
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
3.7500
6.2500
6.5000
1.7500
5.0000
2.8750
3.0000
7.6250
7.2500
3.5000
4.8750
1.8750
6.8750
7.0000
2.6250
2.5000
5.1250
5.0000
4.7500
0.25
0
0.125
0.125
0.125
0.25
0.125
0.125
0
0.625
1
0.25
0.125
0.125
0
0.25
0.375
0
97.56%
95.83%
100.00%
92.42%
87.88%
93.33%
95.12%
98.25%
105.00%
100.00%
95.35%
93.02%
95.00%
100.00%
98.04%
101.96%
93.33%
100.00%
84
85
86
87
88
89
78
79
80
81
82
83
72
73
74
75
76
77
90
PT8-65
PT8-66
PT8-67
PT8-68
PT8-69
PT8-70
PT8-61
PT8-62
PT8-63
PT8-64
PT8-83
PT8-84
PT8-85
PT8-86
PT8-87
PT8-88
PT8-77
PT8-78
PT8-79
PT8-80
PT8-81
PT8-82
PT8-71
PT8-72
PT8-73
PT8-74
PT8-75
PT8-76
PT8-89
PT8-90
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 5/8
4 5/8
4 5/8
4 3/4
5 1/8
5 1/8
5 1/8
5 1/8
5 1/8
4 5/8
4 5/8
4 5/8
4 5/8
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 5/8
5 1/8
5 1/8
5 1/8
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
4.6250
4.5000
4.7500
4.5000
4.6250
4.6250
4.8750
4.6250
4.5000
4.6250
4.8750
4.8750
5.0000
4.8750
4.6250
4.5000
4.7500
4.5000
4.5000
4.7500
4.6250
4.6250
4.7500
4.6250
4.7500
4.8750
4.8750
5.0000
5.0000
4.8750
0.25
0
0.125
0
0.25
0.125
0.125
0.125
0.25
0.125
0.25
0.25
0
0.125
0
0.125
0.125
0.125
0.125
0
0.125
0.125
0
0.125
0.125
0.25
0.25
0.125
0.125
0.25
105.41%
102.63%
100.00%
97.30%
102.70%
97.30%
97.30%
100.00%
97.37%
97.37%
100.00%
97.37%
100.00%
100.00%
97.30%
100.00%
94.74%
97.37%
97.37%
95.12%
95.12%
97.56%
97.56%
95.12%
97.37%
94.74%
97.37%
95.12%
95.12%
97.56%
37
48
49
31
32
33
34
35
38
39
40
41
60
54
55
56
57
58
59
PT8-31
PT8-32
PT8-33
PT8-34
PT8-47
PT8-48
PT8-49
PT8-50
PT8-51
PT8-52
PT8-41
PT8-42
PT8-43
PT8-44
PT8-45
PT8-46
PT8-35
PT8-36
PT8-37
PT8-38
PT8-39
PT8-40
PT8-59
PT8-60
PT8-53
PT8-54
PT8-55
PT8-56
PT8-57
PT8-58
3 1/2
3 1/2
2
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
2
1 5/8
1 5/8
2 3/8
2 3/8
5 1/4
5 1/8
4 5/8
4 5/8
5 1/4
5 1/4
5 1/4
5 1/8
5 1/8
5 1/8
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
3.3750
5.0000
5.0000
5.1250
5.0000
5.1250
5.0000
2.3750
5.0000
5.1250
5.1250
5.1250
5.2500
3.5000
2.0000
2.0000
1.6250
1.5000
2.2500
5.0000
5.0000
5.0000
4.7500
4.7500
5.1250
5.0000
5.0000
5.1250
5.1250
5.0000
0
0.25
0.25
0.125
0.25
0.125
0.125
0
0.25
0.125
0.125
0.125
0.125
0
0
0
0
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.25
0.125
0.25
0.25
0.125
0.125
100.00%
95.24%
97.62%
97.62%
97.62%
100.00%
100.00%
100.00%
100.00%
100.00%
92.31%
94.74%
96.43%
97.56%
97.56%
97.56%
102.70%
102.70%
97.62%
95.24%
95.24%
97.62%
97.62%
97.56%
95.24%
95.24%
97.62%
95.24%
97.62%
95.24%
PT8-16
28
29
18
PT8-3
12
13
14
15
16
17
6
7
8
9
10
11
1 PT8-1
2
3
4
5
30
24
25
26
27
PT8-4
PT8-5
PT8-6
PT8-7
PT8-8
PT8-9
PT8-10
PT8-29
PT8-30
PT8-23
PT8-24
PT8-25
PT8-26
PT8-27
PT8-28
PT8-17
PT8-18
PT8-19
PT8-20
PT8-21
PT8-22
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
3
3
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
9 5/8
9 5/8
3 1/2
9 5/8
9 5/8
9 5/8
9 5/8
9 5/8
9 5/8
9 3/4
9 5/8
9 5/8
9 5/8
9 5/8
9 5/8
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
9.7500
9.3750
9.5000
9.8750
9.6250
9.7500
2.8750
2.7500
9.3750
9.3750
9.5000
9.5000
9.5000
9.3750
9.5000
9.3750
3.3750
9.3750
9.8750
9.7500
9.2500
9.2500
9.5000
9.3750
9.6250
9.6250
9.6250
9.3750
9.3750
0.25
0
0.375
0.25
0.125
0.125
0.25
0.125
0.375
0.375
0.25
0.125
0.125
0.25
0.125
0.25
0.125
0.25
0.25
0.25
0.125
0.375
0.375
0
0.375
0.125
0.125
0
0.25
91.67%
95.83%
96.15%
96.15%
97.44%
97.44%
97.40%
102.60%
101.30%
96.10%
96.10%
98.70%
96.15%
98.72%
98.72%
100.00%
97.40%
97.40%
100.00%
96.15%
97.44%
101.28%
98.72%
100.00%
98.70%
97.40%
98.70%
97.40%
96.43%
93
94
95
108
109
118
119
120
117
114
115
116
PT8GB-9
PT8GB-12
PT8GB-13
PT8GB-14
PT8GB-3
PT8GB-4
PT8GB-5
PT8GB-6
PT8GB-7
PT8GB-8
PT8-91
PT8-92
PT8GB-1
PT8GB-2
PT8GB-10
PT8GB-11
PT8GB-18
PT8GB-15
PT8GB-16
PT8GB-17
6 3/8
1 7/8
7 1/8
2 1/2
3
8 1/4
8 1/4
3 3/4
3 3/4
6 3/8
5 1/8
5 1/8
3
1 7/8
7 1/8
5
2 1/2
5 3/8
5 3/8
5
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
3.7500
6.2500
6.5000
1.7500
5.0000
2.8750
3.0000
7.6250
7.2500
3.5000
4.8750
1.8750
6.8750
7.0000
2.6250
2.5000
4.7500
0.25
0
0.125
0.125
0.125
0.25
0.125
0.125
0
0.625
1
0.25
0.125
0.125
0
0
97.56%
95.83%
100.00%
92.42%
87.88%
93.33%
95.12%
98.25%
105.00%
100.00%
95.00%
100.00%
98.04%
101.96%
93.33%
100.00%
84
85
86
87
88
89
78
79
80
81
82
83
72
73
74
75
76
77
90
PT8-65
PT8-66
PT8-67
PT8-68
PT8-69
PT8-70
PT8-61
PT8-62
PT8-63
PT8-64
PT8-83
PT8-84
PT8-85
PT8-86
PT8-87
PT8-88
PT8-77
PT8-78
PT8-79
PT8-80
PT8-81
PT8-82
PT8-71
PT8-72
PT8-73
PT8-74
PT8-75
PT8-76
PT8-89
PT8-90
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 5/8
4 5/8
4 5/8
4 3/4
5 1/8
5 1/8
5 1/8
5 1/8
5 1/8
4 5/8
4 5/8
4 5/8
4 5/8
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 3/4
4 5/8
5 1/8
5 1/8
5 1/8
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
4.6250
4.5000
4.7500
4.5000
4.6250
4.6250
4.8750
4.6250
4.5000
4.6250
4.8750
4.8750
5.0000
4.8750
4.6250
4.5000
4.7500
4.5000
4.5000
4.7500
4.6250
4.6250
4.7500
4.6250
4.7500
4.8750
4.8750
5.0000
5.0000
4.8750
0.25
0
0.125
0
0.25
0.125
0.125
0.125
0.25
0.125
0.25
0.25
0
0.125
0
0.125
0.125
0.125
0.125
0
0.125
0.125
0
0.125
0.125
0.25
0.25
0.125
0.125
0.25
105.41%
102.63%
100.00%
97.30%
102.70%
97.30%
97.30%
100.00%
97.37%
97.37%
100.00%
97.37%
100.00%
100.00%
97.30%
100.00%
94.74%
97.37%
97.37%
95.12%
95.12%
97.56%
97.56%
95.12%
97.37%
94.74%
97.37%
95.12%
95.12%
97.56%
49
31
32
33
34
35
38
39
40
41
60
54
55
56
57
58
59
PT8-31
PT8-32
PT8-33
PT8-34
PT8-47
PT8-48
PT8-49
PT8-50
PT8-51
PT8-52
PT8-41
PT8-42
PT8-43
PT8-44
PT8-45
PT8-46
PT8-35
PT8-36
PT8-37
PT8-38
PT8-39
PT8-40
PT8-59
PT8-60
PT8-53
PT8-54
PT8-55
PT8-56
PT8-57
PT8-58
3 1/2
3 1/2
2
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
5 1/4
2
1 5/8
1 5/8
2 3/8
2 3/8
5 1/4
5 1/8
4 5/8
4 5/8
5 1/4
5 1/4
5 1/4
5 1/8
5 1/8
5 1/8
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
3.3750
5.0000
5.0000
5.1250
5.0000
5.1250
5.0000
2.3750
5.1250
5.1250
5.2500
3.5000
2.0000
2.0000
1.6250
1.5000
2.2500
5.0000
5.0000
5.0000
4.7500
4.7500
5.1250
5.0000
5.0000
5.1250
5.1250
5.0000
0
0.25
0.25
0.125
0.25
0.125
0.125
0
0.125
0.125
0.125
0
0
0
0
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.25
0.125
0.25
0.25
0.125
0.125
100.00%
97.62%
97.62%
100.00%
100.00%
100.00%
100.00%
100.00%
92.31%
94.74%
96.43%
97.56%
97.56%
97.56%
102.70%
102.70%
97.62%
95.24%
95.24%
97.62%
97.62%
97.56%
95.24%
95.24%
97.62%
95.24%
97.62%
95.24%
PT8-16
28
29
18
PT8-3
12
13
14
15
16
17
6
7
8
9
10
11
1 PT8-1
2
3
4
5
30
24
25
26
27
PT8-4
PT8-5
PT8-6
PT8-7
PT8-8
PT8-9
PT8-10
PT8-29
PT8-30
PT8-23
PT8-24
PT8-25
PT8-26
PT8-27
PT8-28
PT8-17
PT8-18
PT8-19
PT8-20
PT8-21
PT8-22
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
3
3
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
9 3/4
9 5/8
9 5/8
3 1/2
9 5/8
9 5/8
9 5/8
9 5/8
9 5/8
9 5/8
9 3/4
9 5/8
9 5/8
9 5/8
9 5/8
9 5/8
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
5600
9.7500
9.3750
9.5000
9.8750
9.6250
9.7500
2.8750
2.7500
9.3750
9.3750
9.5000
9.5000
9.5000
9.3750
9.5000
9.3750
3.3750
9.3750
9.8750
9.7500
9.2500
9.2500
9.5000
9.3750
9.6250
9.6250
9.6250
9.3750
9.3750
0.25
0
0.375
0.25
0.125
0.125
0.25
0.125
0.375
0.375
0.25
0.125
0.125
0.25
0.125
0.25
0.125
0.25
0.25
0.25
0.125
0.375
0.375
0
0.375
0.125
0.125
0
0.25
91.67%
95.83%
96.15%
96.15%
97.44%
97.44%
97.40%
102.60%
101.30%
96.10%
96.10%
98.70%
96.15%
98.72%
98.72%
100.00%
97.40%
97.40%
100.00%
96.15%
97.44%
101.28%
98.72%
100.00%
98.70%
97.40%
98.70%
97.40%
96.43%
Plant: 751 Rioden
Mix Design: N4513SP
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 148.6 (lb/ft³) (C138)
Air Content: 1.5 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 5-1/2 (C143)
Air Temperature (F): 45 Concrete Temp (F): 65 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24953
Report #: CC-000302
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
Plant: 751 Rioden
Mix Design: N4513SP
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 149.2 (lb/ft³) (C138)
Air Content: 1.7 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 5-3/4 (C143)
Air Temperature (F): 42 Concrete Temp (F): 65 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24952
Report #: CC-000306
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
Plant: 751 Rioden
Mix Design: N4513SP
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 148.1 (lb/ft³) (C138)
Air Content: 1.7 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 6-1/4 (C143)
Air Temperature (F): 40 Concrete Temp (F): 64 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24948
Report #: CC-000310
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
Plant: 751 Rioden
Mix Design: N4513SP
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 148.6 (lb/ft³) (C138)
Air Content: 2.0 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 5-1/2 (C143)
Air Temperature (F): 35 Concrete Temp (F): 64 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24947
Report #: CC-000300
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
Plant: 751 Rioden
Mix Design: N4513SP
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 149.2 (lb/ft³) (C138)
Air Content: 1.7 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 6 (C143)
Air Temperature (F): Concrete Temp (F): 62 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24946
Report #: CC-000308
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
Plant: 751 Rioden
Mix Design: N4513SP
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 148.7 (lb/ft³) (C138)
Air Content: 1.7 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 5-1/2 (C143)
Air Temperature (F): 35 Concrete Temp (F): 64 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24945
Report #: CC-000299
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
On-Site Admixtures: 10.00 Gal Water (10 yd³)
Location
Field Measurements
Plastic Unit Weight:
Air Content: 3.5 (C231)
Load Volume: 10 (yd³)
Weather: Sunny Slump (in): 6-1/4 (C143)
Air Temperature (F): 54 Concrete Temp (F): 68 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24356
Report #: CC-000279
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight:
Air Content: 3.3 (C231)
Load Volume: 11 (yd³)
Weather: Sunny Slump (in): 4-1/4 (C143)
Air Temperature (F): 48 Concrete Temp (F): 69 (C1064)
Lab Test Results
Testing Lab: Denver, 3990 Fox Street, Denver, CO, 80216
Page 1 of 1
Client:
FMFPE, LLC
Loveland, CO 80538
2725 Rocky Mountain Ave Ste 200
Project:
McWhinney Foothills Mall Multifamily
016-1668
Fort Collins, CO
Compressive Strength of Concrete
Test Method: ASTM C39; C31; C172
Sample: 24346
Report #: CC-000281
Denver
3990 Fox Street
Denver, CO 80216
Phone: 303-237-2072
Fax: 303-237-2659
Braden Hirsch
Project Manager
Denver
Braden Hirsch
Project Manager
Project Manager