Loading...
HomeMy WebLinkAbout829 Laporte Ave - Special Inspections/Engineering - 07/09/2020STRUCTURAL OBSERVATION REPORT Job No. H3LT14-20129 Date signed: July 9, 2020 This is a verified password secured signature H3 Construction and Design 102 S. St. Louis Ave, Loveland, CO Re: Open excavation, rebar, and concrete encased electrode observation at observation at the residence at 829 La Porte Ave, Fort Collins Dear Sir or Madam: On June 30 and July 1, 2020, Crown Jade Design and Engineering personnel under my supervision and in direct contact with me observed the soil at the bottom of the three feet deep excavation for the foundation system designed by our firm for the above project. This soil consisted of a firm gravelly sand, confirming our assumption that this soil is capable of supporting a maximum soil bearing pressure of 2,000 pounds per square foot per the 2018 International Residential Code Table R401.4.1. Accordingly, there is no need to change the balanced spread footing type foundation system designed by CJDE. I also observed the footing widths, reinforcing steel, and the concrete encased electrode (UFER) placed in the foundation forms at the subject site. All observed footing widths, foundation wall reinforcement, and UFER met the specifications for size, type and installation as per the plans on file at the project site. Please feel free to contact our office if you have any questions. Very truly yours, MARK BENJAMIN, PE, MSCE, SECB, CPHC Certified in the practice of structural engineering Certified Passive House Consultant Copies: (1) verified password secured document. If submitting to a building department, provide CJDE with an email contact so that we may send it directly per most building department’s request.