HomeMy WebLinkAbout1080 W Lake St - Disclosures/Blower Door Test - 03/24/2020Air Infiltration Test Packet The Sunshine House 1080 W. Lake Street Fort Collins, CO 80521 GCH Construction Phone: (970) 449-1612 Email: buildingperformance@gsservices.com March 24, 2020 Executive Summary Building Name: The Sunshine House Building Address: 1080 W. Lake Street, Fort Collins, CO 80521 Prime Contractor: GCH Construction Contact: Rocky Ernest (719) 651-8228 Date Built: 2020 Elevation: 5000 Ft. Usage Type: Childcare Center Floor Area of Conditioned Space: 10,955 Sq. Ft. Volume for Conditioned Space: 164,325 Ft3 Surface Area: 27018 Sq. Ft. Type of Construction & Air Barrier Material: Wood consgruction, slab on grade, air barier was exterior sheathing, stego underslab * roof decking with TPO at RTU well. Building Enclosure Area includes: Open building with framed walls. Tested prior to interior drywall – All holes & penetrations through air barrier were in place. Testing Agency: GS Services, LTD. Phone: (970) 698-1069 Address: 309 Lincoln Court, Ft. Collins, CO 80524 Testing Agency Contact: Paul Higman Phone: (970) 698-1069 Test Date: March 24, 2020 Testing Protocol: E779-10 Test Targets: Metric: CFM75/Sq. Ft. Requirement: Actual <0.25 CFM75/Sq. Ft. Deviations from Test: None ___________________________________________________________________________________________ Combined Results: Metric: CFM75/Sq. Ft. Actual: 0.179 CFM75/Sq. Ft. PASS: ____X_____ FAIL:__________ Table of Contents Cover Sheet Executive summary Reports Pictures Weather Data & Checklist Testing Conditions: Beautiful, clear & sunny day. ____________________________________________________________________________________ Weather Data: Time Indoor Temp Outdoor Temp Delta T Wind Speed Wind Direction RH% Pre: 10:00 AM 50 48 2 0 0 48 Post: 10:50 AM 50 50 0 3 East 44 Set Up Checklist: 1 Confirm HVAC shutdown/disabling X 7 Confirm all outlets at the enclosure perimeter are sealed or isolated X 2 Confirm all dampers in the enclosure perimater are closed and/or isolated X 8 Note rain or snow conditions that may be affecting leakage of walls X 3 Confirm exhaust fans & dryers are off & isolated at the enclosure level X 9 Confirm exteriror doors & windows are enclosed and latched X 4 Confirm combustion appliances are on pilot or are disabled X 10 Confirm ambient conditions provided are outside of air barrier envelope X 5 Confirm all air inlets at the enclosure perimeter are sealed & isolated X 11 Confirm all plumbing traps are filled with water X 6 Confirm all interior doors are propped open X 12 Confirm dropped ceiling tiles are removed at specified rate X Multi - Fan Pressure Measurement Location Configuration Project: GCH - 1080 W. Lake Street Date: 3/24/2020 Time: 10:00 AM Envelope Pressures Device Name Channel Location wrt Location 22712 A Bldg. North wrt North 1818 A Bldg. South wrt East 41761 A Bldg. South wrt South 22712 B Bldg. North wrt West Uniform Building Interior Pressure verification at Pascals Building Interior Location Pressure reading Bldg. South -39.6 Bldg. South -39.0 Bldg. North -39.3 Bldg. North -39.5 Label Name South Exterior East Exterior West Exterior North Exterior Within 10% of induced envelope pressure Yes Yes Yes Yes OPEN BUILDING EQUIPMENT & CALIBRATION SHEET Gage Model Serial # Accuracy Calibration Date 1 DG 700 41761 98% 12/26/18 2 DG 700 1818 100% 11/5/18 3 DG 700 22712 100% 3/1/19 Fan Model Serial # Accuracy Calibration Date 1 Model 3 (110 V) 33874 100% 3/13/20 2 Model 3 (110 V) 29628 100% 3/13/20 USACE Airtightness Report Building Details Building Name Building Address Prime Contractor Contact Testing Agency Testing Agency Address Testing Agency Contact Additional Building Details: Lead On-Site Personnel Testing Agency E-mail Testing Agency Phone # Name Organization Phone Number Witnesses Sunshine House 1080 West Lake Street GCH Construction Company Rocky Ernest GS Services LTD 309 Lincoln Ct Paul Higman (970) 698-1069 BuildingPerformance@GSServices.com Wood with TPO construction, at RTU well. Slab on Grade, Air Barrier was exterior sheathing, Stego underslab, and roof decking Phone Page 1 Results Depressurization Coefficient Depressurization Exponent (nD) CFM @ -75 Pa CFM @ -75/Sq ft Correlation Coefficient (r^2) Confidence Depressurization Interval ONLY (for test) Depressurization Test Average CFM75 Confidence Interval (for both tests) Pass/Fail Target Airtightness? EqLA75 4379 cfm +/- 0.6 % 341.9 cfm/Pa^n +/- 4.7 % .591 +/- 0.012 4832 cfm +/- 0.7 % 0.162 +/- 0.001 0.9990 0.161 to 0.163 0.177 to 0.180 3.3 sq ft +/- 1.1 % Pass Average CFM75/Sq ft 0.179 +/- 0.002 Pressurization Coefficient Cp Pressurization Exponent (nP) CFM @ 75 Pa CFM @ 75/Sq ft Correlation Coefficient (r^2) Confidence Pressurization Interval ONLY (for test) Pressurization Test 5285 cfm +/- 1.1 % 356.6 cfm/Pa^n +/- 8.9 % .624 +/- 0.022 0.196 +/- 0.002 0.9974 0.193 to 0.198 * Depressurization test included an induced building envelope pressure less than -25 Pa Deviations From Standard Target CFM75/Sq ft 0.25 Page 2 Serial Number DG700-41761 DG700-22712 DG700-1818 Calibration Date 12/26/18 03/01/19 11/05/18 Instrumentation Details - Gauges Gauge 1 Gauge 2 Gauge 3 The Digital published Pressure accuracy Gauges of are The accurate Energy to Conservatory +/- 1% of reading instrumentation or 0.15 Pa, whichever is as follows: is greater. DG500/APT DG700/Test DG1000 Devices are +/- 2% accurate of reading to +/- from 1% of +/reading - 850 Pa or to 0.+2 /- Pa, 2000 whichever Pa. is greater, from 0 to +/- 850 Pa. The APT is accurate to Page 3 Serial Number Calibration Date BD Mod 3-33874 BD Mod 3-29628 Instrumentation Details - Fans N/A N/A Fan 1 Fan 2 The published accuracy of The Energy Conservatory fans is +/- 3% of reading. Page 4 Test Date 03-24-2020 Building Elevation (ft above sea level) Building Height Above Grade (ft) Exterior Pressures Configuration Operator Location Test Temperatures (F) Tests Conducted Test Conditions and Configuration Test Boundary Surface Area (sq ft) Pre-Test Inside Temperature 5000 15 27018 Electronically averaged Inside Pressurization and Depressurization Pre-Test Outside Temperature Post-Test Inside Temperature Post-Test Outside Temperature 50.0 48.0 50.0 50.0 48.0 50.0 48.0 50.0 Depressurization Test Pressurization Test Additional Test Notes: Tested after all penetrations were in the Air Barrier and Air Barrier was intact. Pre-Drywall Equipment Configuration DG700-DG700-41761 41761 DG700-DG700-22712 22712 DG700-DG700-1818 1818 Gauge Channel Channel Type Channel Label BA BA BA Envelope Model 3 Fan Pressure Flow (#33874) Envelope Envelope Pressure Pressure Envelope Model 3 Fan Pressure Flow (#29628) Ext Upper East Fan Ext Ext West North Ext Lower South Fan Page 5 Nominal Building Envelope Pressure Points and Fan Flows Test Point Envelope Average Pressure Nominal (Pa) Total Flow Nominal (CFM) Fan 1 2 ((D) D) 3 4 ((D) D) 5 6 ((D) D) 7 8 ((D) D) 10 9 ((D) D) 11 12 ((D) D) 13 14 ((D) D) 15 16 ((P) P) 17 18 ((P) P) 19 20 ((P) P) 21 22 ((P) P) --79.77.7 1 --74.68.1 2 --63.59.6 0 --57.53.4 9 --50.46.5 1 --40.34.4 7 --27.24.5 4 80.76.4 1 75.70.1 4 65.60.4 4 55.50.6 3 4536 4423 4310 4110 3943 3754 3647 3536 3404 3233 2996 2775 2375 2233 5466 5274 5270 4986 4842 4630 4417 4148 Baseline Building Envelope Pressure Points (Pa) Baseline Averages (Pa) --0.0.5 1 --0.0.4 2 0.0.1 2 -0.0.2 1 0.0.2 1 0.0.2 1 Depressurization Test Pressurization Test --0.0.4 7 --1.0.3 8 --0.0.7 5 --1.1.2 7 --1.2.8 7 --2.1.0 3 - 0.1 -1.3 --0.0.3 4 --0.1.1 1 --1.1.9 0 --0.0.9 3 --0.0.8 4 --1.0.1 9 -0.8 Pre-test Post-test 23 24 ((P) P) 25 26 ((P) P) 45.35.1 3 30.25.0 7 3938 3239 2998 2698 Page 7 Interior Building Pressures During Test (Pa) Interior Bulding Pressures Legend Page 8 ASTM E779-10 Corrected Envelope Pressures and Flows --79.76.3 7 --73.67.6 8 --63.58.2 6 --57.53.0 5 --50.45.1 7 --40.34.0 3 --27.24.1 0 80.76.9 6 75.70.6 9 65.60.9 8 56.50.1 8 45.35.6 8 30.26.5 2 Test Point 1 2 ((D) D) 3 4 ((D) D) 5 6 ((D) D) 7 8 ((D) D) 10 9 ((D) D) 11 12 ((D) D) 13 14 ((D) D) 15 16 ((P) P) 17 18 ((P) P) 19 20 ((P) P) 21 22 ((P) P) 23 24 ((P) P) 25 26 ((P) P) Envelope Average Pressure Induced (Pa) Total Flow Corrected (CFM) Fan 4568 4454 4340 4138 3970 3780 3672 3560 3428 3256 3016 2794 2392 2248 5511 5318 5314 5028 4882 4668 4454 4182 3971 3266 3022 2720 Page 9 Airtightness Test Graph Figure 1: Depressurization and Pressurization Tests Page 10 Command Station Exterior DG 700 - 22712 Blower Door Setup Upper DG 700 - 41761 West Elevation North Elevation Exterior North Exterior West East Elevation South Elevation Interior with sealed exhaust vents -0.0.1 3 0.0.4 4 0.0.0 5 0.0.1 3 0.0.6 2 0.0.3 8 Pre-test Post-test 0.3 Baseline Length (seconds) 120 120 120 120 Test Data Test Average (Pa) -0.4 Test Average (Pa) -0.5 Page 6