HomeMy WebLinkAbout315 Parker St - Special Inspections/Engineering - 09/04/2020I N C O R P O R A T l D August 26, 2020 r_ _ A oil,*( Mr. Zack Liesenfeld 5'-Y.zO 315 Parker Street B Z 00 $p'/ Fort Collins, CO 80525 Subject: Modified Framing Around New Basement Egress Windows 315 Parker Street, Fort Collins, CO CTL Thompson Project Number: FC09452 L2 Mr. Liesenfeld, CTL Thompson previously prepared framing plans for the new egress window openings on the east and west sides of the basement at 315 Parker Street. Those plans are dated August 5, 2020. During installation of these windows, the framing had to be modified. Specifically, the double trimmers shown on the plan were revised to a single trimmer, and a 6"x4" continuous steel angle was installed as the header over the opening. That steel angle header bears on the foundation walls at either side of the opening. Below the steel header, a double 2x6 wood header was also installed. Refer to the photo below. Based on our review of the revised framing and the design loads on these window headers, the revised headers are sufficient to support the design load. Therefore, the design intent of our original plans has been met and the change is acceptable. 400 North Link Lane i Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 If you have any questions, please contact our office. Very truly yours, CTLITHOMPSON, INC Wayne Thompson, PE Project Manager Aug 26 2020 7:37 AM 2 Zack Liesenfeld 315 Parker Street, Fort Collins, CO CTL I T PROJECT NO. FC09452-500 L2