Loading...
HomeMy WebLinkAbout1726 Feltleaf Ct - Special Inspections/Engineering - 08/28/2020WLLFiS B& MSSUC2CITGES STRUCTURAL C"MINEERS August 28, 2020 DPM Construction Attn. Dan Mulder Re: 1726 Felt Leaf Ct Fort Collins, Colorado As requested I visited the site to determine the feasibility of removing a portion of a wall at the kitchen. The existing opening to the kitchen is to be widened to 7'. The second floor is supported at the wall line. It is recommended a (2)-1 3/4X9 1/4" LVL flush header be used to span the 7'. The 2x10 hoists should be hung to the face of the header. The existing double LVL flush beam should be hung to the header with a Simpson U410 or approved. Provide a 2-2x4 built up post each end of the header. If I can be of further assistance please contact me. Sincerely, Weeks & Associates, Inc. �. :GIST r Q r t j, DiBital',,Ipedb,GaryWeeks OV �. DN:m=Gary o=Weeks& V Weeks, • �� Gary WeeksAssedale,.lac,e�, 0N: , l.email-garyweeks@weekslncmm, c=U5 el Date: 2020.08.281255:44-0600' Q30i t/ Gary G. Weeks, P.E. A.•, � ? �, Structural Engineer pp�A, .•`�� S . 1.11unt rc�`�t�' 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622 0