Loading...
HomeMy WebLinkAbout3319 Green Lake Dr - Special Inspections/Engineering - 10/04/2019400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 March 14, 2019 Trailhead Homes 37019 Kingfisher Ct. Windsor, Colorado 80550 Attention: Mr. Ceri Jones Subject: Summary of Residential Construction Observations Townhomes on Vine Lots 9-10, Block 2, 3319 Green Lake Fort Collins, Colorado CTL Project No.: FC08156.900 As requested, we provided residential construction observations for Lots 9-10, Block 2, 3319 Green Lake, at the Townhomes on Vine Subdivision. We were scheduled for the following observations to date: Observation Date Result/Remarks Excavation/Footing 9-18-19 Pass Foundation Wall Steel/UFER 9-19-19 Pass Drain/Dampproof 9-26-19 Pass The information in our project files indicated there are no outstanding discrepancies for the items listed above and that each was installed in general conformance with the project plans. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL │ THOMPSON, INC. Reviewed By: Heather Grubb Ryan Beck, PE Field Department Manager Project Engineer Attachments: Excavation/Footing Observation Report Foundation Wall Reinforcement Observation Report Foundation Wall Drain/Waterproofing Observation Report Cc via email: ceri@trailheadhomes.com Tr Tr Tr