HomeMy WebLinkAbout3405 S Timberline Rd - Special Inspections/Engineering - 10/11/2019Soilogic, Inc.
3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
October 11, 2019
2001 Danfield, LLC
1430 Twin Oak Court
Fort Collins, Colorado 80525
Attn: Mr. Troy Peterson
Re: Construction Materials Testing Observations Summary Report
Madwire 3405 South Timberline Road, Fort Collins, Colorado
Soilogic Project # 19-2015
Mr. Peterson:
During the period of December 4, 2018, through June 29, 2019, Soilogic Inc. (Soilogic)
provided observation services for the referenced project. Our services were provided on a
part-time basis and included the footing foundations, reinforcing steel observations and
subcontracted structural steel observations and the observation and testing of fly-ash
treated subgrade and aggregate base course materials, concrete delivered to the site for
placement and asphaltic concrete placed during paving of the site roadways. The results
of our observations are included with this report.
On December 4, 2018, a Soilogic field engineer observed the reinforcing steel for the
transformer pads at the south side of the existing building at the referenced site prior to
concrete placement. At the time of our site visit, the footing areas and concrete void forms
observed appeared to have been placed in substantial compliance with the provided
construction plans (Kenney Lee Architecture Group).
On February 21, 2019, a Soilogic field engineer observed the reinforcing steel placed for
the foundation footing and column pads for the canopy addition on the existing buildings
north east portion prior to concrete placement. At the time of our site visit, the reinforcing
steel observed appeared to have been placed in substantial compliance with the provided
construction plans.
Construction Materials Testing & Site Observations Report
Building Additions and Site Improvements
Madwire 3405 South Timberline Road, Fort Collins, Colorado
Soilogic Project # 19-2015
2
On February 22, 2019, a Soilogic field engineer observed drilled and epoxy reinforcing
steel for the eastern curtain wall. At the time of our site visit, the drilled areas were
observed to have been cleaned and free of excess dirt and concrete debris. After
verification of depth and clean bearing surfaces, an epoxy bonding agent was observed to
be applied to the bearing surfaces prior to placement of reinforcing steel.
On February 28, 2019, a Soilogic field engineer observed the reinforcing steel placed for
the foundation footings for the west deck addition on the existing buildings north west
portion prior to concrete placement. At the time of our site visit, the reinforcing steel
observed appeared to have been placed in substantial compliance with the provided
construction plans (Larsen Structural Design, 12/5/18).
On March 1, 2019, a Soilogic field engineer observed drilled and epoxy reinforcing steel
for the deck addition. At the time of our site visit, the drilled areas were observed to have
been cleaned and free of excess dirt and concrete debris. After verification of depth and
clean bearing surfaces, an epoxy bonding agent was observed to be applied to the bearing
surfaces prior to placement of reinforcing steel.
On March 11, 2019, a Soilogic field engineer observed the reinforcing steel placed for
column pads for in the north west portion prior to concrete placement. At the time of our
site visit, the reinforcing steel observed appeared to have been placed in substantial
compliance with the provided construction plans.
During the referenced period, Soilogic subcontracted personnel completed structural steel
observations for the referenced project. Copies of the observation reports are attached.
Based on the provided information, the structural steel observed for the referenced project
appear to have been completed in substantial compliance with the project plans and
specifications.
On March 29, 2019, a Soilogic field engineer observed the reinforcing steel placed for the
east shade structure stem wall prior to concrete placement. At the time of our site visit, the
reinforcing steel observed appeared to have been placed in substantial compliance with the
provided construction plans.
Construction Materials Testing & Site Observations Report
Building Additions and Site Improvements
Madwire 3405 South Timberline Road, Fort Collins, Colorado
Soilogic Project # 19-2015
3
On April 2, 2019, a Soilogic field engineer observed the reinforcing steel placed for the
north east shade structure stem wall prior to concrete placement. At the time of our site
visit, the reinforcing steel observed appeared to have been placed in substantial compliance
with the provided construction plans.
On June 24, a Soilogic field engineer re-observed a ¾ full water truck make overlapping
passes in a for the parking lot road base in the south west corner the referenced project. No
evidence of instability in forms of pumping, rutting, surface cracking or subgrade
deformation was observed during the proof roll observation.
On June 27, a Soilogic field engineer re-observed a ¾ full water truck make overlapping
passes in a for the parking lot road base in the south east corner the referenced project. No
evidence of instability in forms of pumping, rutting, surface cracking or subgrade
deformation was observed during the proof roll observation.
During the referenced period, Soilogic subcontracted personnel completed structural steel
observations for the referenced project. Copies of the observation reports are attached.
Based on the provided information, the structural steel observed for the referenced project
appear to have been completed in substantial compliance with the project plans and
specifications.
During the referenced period, Soilogic personnel observed and tested cast-in-place
concrete delivered to the site for construction of curb & gutter and footings. The testing
completed in the field included slump, air content, unit weight, concrete temperature, and
ambient air temperature at the time of placement. Test cylinders were molded from
representative samples of the plastic concrete for laboratory curing and compressive
strength testing. Results of the field and laboratory tests performed during the referenced
period are included with this report. Results of laboratory concrete compressive strength
tests completed during the referenced period are also included and will be provided as they
become available.
Construction Materials Testing & Site Observations Report
Building Additions and Site Improvements
Madwire 3405 South Timberline Road, Fort Collins, Colorado
Soilogic Project # 19-2015
4
During the referenced period, Soilogic personnel performed field moisture/density tests on
fly-ash treated subgrade and aggregate base course materials that had been placed and
compacted prior to and during our site visits. The field moisture/density tests were
completed at random locations and elevations within the backfill areas and random
locations within the subgrade and base course areas and were performed in general
accordance with ASTM Specification D-2922. Results of the field moisture/density tests
completed during the referenced period are included with this report. The field
moisture/density test results met the project compaction requirement of at least 95% of the
material’s standard Proctor maximum dry density and ±2% of the materials optimum
moisture content.
During the site paving operation, Soilogic personnel obtained two (2) representative
samples of the asphaltic concrete being placed for laboratory evaluation. The laboratory
testing performed on the obtained samples included Rice value (ASTM D-2041) asphalt
content by ignition (ASTM D-6307) and washed sieve analysis/gradation (ASTM C-117
and C-136) tests. Results of the completed Rice value and asphalt content and gradation
tests are outlined on the attached summary sheets. The completed laboratory testing
performed on the asphaltic concrete samples indicated those materials met the project
gradation and asphalt content specifications.
During and after compaction of the asphaltic concrete, density tests were completed on the
in-place pavement using a portable nuclear density gauge in general accordance with
ASTM specification D-2950. The nuclear density tests were completed at random
locations across the pavement surface. Results of the completed field density tests are
outlined on the attached summary sheet. The final completed asphaltic concrete field
density tests met the project compaction requirement of 92 to 96% of the materials Rice
value.
Construction Materials Testing & Site Observations Report
Building Additions and Site Improvements
Madwire 3405 South Timberline Road, Fort Collins, Colorado
Soilogic Project # 19-2015
5
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning this report or if we can assist you in any other way, please do not
hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Jason Horner, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
MADWIRE
Density
Fort Collins, Colorado
Project # 19-2015
March - June 2019
Field Moisture/Density Testing Summary
Material Tested and Location
Project Date Daily Depth
Number Number ID Moisture Compaction
Percent
Compaction
Test Test Proctor Moisture (Pass/Fail)
Moisture
Variability
Field Results
Dry
1 6/13 1 SG Fly Ash Treated Subgrade - NEC of Building - 75' S 50' E Pass
2 6/13 2 SG Fly Ash Treated Subgrade - NEC of Building - 25' S 58' E A 14.5% 112.8 -1.5%
A 14.7% 113.3 -1.3% 99% Pass
99% Pass Pass
99% Pass Pass
4 6/13 4 SG Fly Ash Treated Subgrade - NEC of Building - 78' S 90' E A 14.0% 113.2 -2.0% 99% Pass Pass
3 6/13 3 SG Fly Ash Treated Subgrade - NEC of Building - 120' S 61' E A 14.8% 113.0 -1.2%
5 6/14 1 SG Fly Ash Treated Subgrade - SEC of Building - 45' S A 14.2% 113.0 -1.8% 99% Pass Pass
99% Pass Pass
7 6/14 3 SG Fly Ash Treated Subgrade - SEC of Building - 46' S150' E A 14.2% 111.0 -1.8% 97% Pass Pass
6 6/14 2 SG Fly Ash Treated Subgrade - SEC of Building - 45' S 45' E A 14.5% 112.5 -1.5%
99% Pass Pass
9 6/14 5 SG Fly Ash Treated Subgrade - SWC of Building - 75' S A 14.3% 114.9 -1.7% 101% Pass Pass
8 6/14 4 SG Fly Ash Treated Subgrade - SEC of Building - 44' S 100' W A 14.0% 113.2 -2.0%
10 6/14 6 SG Fly Ash Treated Subgrade - SWC of Building - 73' S 100' E A 14.2% 117.0 -1.8% 103% Pass Pass
11 6/14 7 SG Fly Ash Treated Subgrade - SWC of Building - 109' S 30' W A 14.5% 119.6 -1.5% 105% Pass Pass
99% Pass Pass
13 6/14 9 SG Fly Ash Treated Subgrade - SWC of Building - 130' S 10' W A 14.0% 113.0 -2.0% 99% Pass Pass
12 6/14 8 SG Fly Ash Treated Subgrade - SWC of Building - 120' S 80' E A 15.0% 113.2 -1.0%
99% Pass Pass
15 6/14 11 SG Fly Ash Treated Subgrade - SEC of Building - 24' S 180' W A 14.1% 96.0 -1.9% 84% Pass *FAIL*
14 6/14 10 SG Fly Ash Treated Subgrade - NEC of Building - 50' S 105' E A 14.2% 113.0 -1.8%
16 6/15 1 SG Retest of Test #18 A 14.5% 113.5 -1.5% 100% Pass Pass
17 6/18 1 BG Parking Lot Road Base - SWC of Building - 150' S 51' W B 6.4% 134.9 0.4% 99% Pass Pass
99% Pass Pass
19 6/18 3 BG Parking Lot Road Base - SWC of Building - 78' S B 7.2% 135.0 1.2% 99% Pass Pass
18 6/18 2 BG Parking Lot Road Base - SWC of Building - 75' S 10' W B 6.0% 135.0 0.0%
99% Pass Pass
21 6/20 1 BG Parking Lot Road Base - SWC of Building - 75' S 75' E B 5.7% 133.7 -0.3% 98% Pass Pass
20 6/18 4 BG Parking Lot Road Base - SWC of Building - 76' S 27' E B 6.9% 134.8 0.9%
22 6/20 2 BG Parking Lot Road Base - SWC of Building - 120' S 11' W B 6.2% 134.0 0.2% 99% Pass Pass
23 6/20 3 BG Parking Lot Road Base - SWC of Building - 150' S 51' W B 5.1% 133.5 -0.9% 98% Pass Pass
98% Pass Pass
25 6/20 5 BG Parking Lot Road Base - SWC of Building - 150' S 78' E B 4.2% 133.9 -1.8% 98% Pass Pass
24 6/20 4 BG Parking Lot Road Base - SWC of Building - 125' S 95' E B 5.5% 133.5 -0.5%
99% Pass Pass
27 6/21 2 BG Parking Lot Road Base - NEC of Building - 33' S 42' E B 7.1% 133.2 1.1% 98% Pass Pass
26 6/21 1 BG Parking Lot Road Base - NEC of Building - 39' E B 7.0% 134.0 1.0%
28 6/21 3 BG Parking Lot Road Base - NEC of Building - 75' S 41' E B 6.4% 134.5 0.4% 99% Pass Pass
29 6/21 4 BG Parking Lot Road Base - NEC of Building - 100' S 40' E B 6.5% 134.7 0.5% 99% Pass Pass
98% Pass Pass
31 6/24 2 BG Parking Lot Road Base - SEC of Building - 46' S 27' E B 6.0% 133.1 0.0% 98% Pass Pass
30 6/24 1 BG Parking Lot Road Base - SEC of Building - 45' S B 6.2% 132.8 0.2%
99% Pass Pass
3 of 30
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
General
Set # 1 Application
Location NWC of East Pad - 3' S 3' E Mix Code A4785
Transformer Pads
Placement Date 12/4/18 Supplier Martin Marietta
1716
Sample Time 8:18 AM Water Added On Site 0
Placement Type Chute Ticket # 49151458
Batch Time 7:24 AM Truck #
Sampled At (yards) Field Personnel LK
Project Specifications and Test Results
Test Specifications Results
Slump (in) ASTM C-143 3-5" 5"
Air Content (%) ASTM C-231 3.5-6.5% 5.5%
Unit Weight (pcf) Field - 145.2
Air Temperature @ Time of Placement - 16 °F
Concrete Temperature ASTM C-1064 90˚ Max 65 °F
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
-
70135 Cone/Shear 5581
5520
68540 Cone/Shear 5454
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
6285
6200
76910 Cone/Shear 6120
- - -
-
- - -
78980 Cone/Shear
-
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
3 of 20
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
7875
7900
99465 Cone/Shear 7915
- - -
-
- - -
98965 Cone/Shear
-
76660 Cone/Shear 6100
6100
76625 Cone/Shear 6098
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Unit Weight (pcf) Field - 145.1
Air Temperature @ Time of Placement - 50 °F
Concrete Temperature ASTM C-1064 90˚ Max 66 °F
Slump (in) ASTM C-143 3-5" 4"
Air Content (%) ASTM C-231 3.5-6.5% 5.8%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel LK
1918
Sample Time 12:00 AM Water Added On Site 0
Placement Type Chute Ticket # 49151847
Batch Time 11:36 AM Truck #
Location SEC of Building - 16' S Mix Code A4780
Curb & Gutter
Placement Date 12/10/18 Supplier Martin Marietta
General
Set # 2 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
1 of 20
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
7144
7210
91305 Cone/Shear 7266
- - -
-
- - -
89780 Cone/Shear
-
65595 Cone/Shear 5220
5470
71925 Cone/Shear 5724
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Unit Weight (pcf) Field - 147.3
Air Temperature @ Time of Placement - 32 °F
Concrete Temperature ASTM C-1064 90˚ Max 53 °F
Slump (in) ASTM C-143 3-5" 3 1/2"
Air Content (%) ASTM C-231 3.5-6.5% 5.0%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel JG
1735
Sample Time 9:10 AM Water Added On Site 0
Placement Type Chute Ticket # 49151920
Batch Time 8:41 AM Truck #
Location NEC of Building - 100'S - 10' E Mix Code A4780
Curb & Gutter
Placement Date 12/11/18 Supplier Martin Marietta
General
Set # 3 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
2 of 20
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
7265
7140
88030 Cone/Shear 7005
- - -
-
- - -
91300 Cone/Shear
-
72420 Cone/Shear 5763
5690
70485 Cone/Shear 5609
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Unit Weight (pcf) Field - 148.8
Air Temperature @ Time of Placement - 20 °F
Concrete Temperature ASTM C-1064 90˚ Max 51 °F
Slump (in) ASTM C-143 3-5" 3"
Air Content (%) ASTM C-231 3.5-6.5% 5.0%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel JG
743
Sample Time 9:20 AM Water Added On Site 0
Placement Type Chute Ticket # 49152074
Batch Time 8:23 AM Truck #
Location SEC of Building - 10' N 50' E Mix Code A4780
Curb & Gutter
Placement Date 12/13/18 Supplier Martin Marietta
General
Set # 4 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
1 of 10
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
5769
6000
78350 Cone/Shear 6235
- - -
-
- - -
72490 Cone/Shear
-
55250 Cone/Shear 4397
4540
58740 Cone/Shear 4674
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Unit Weight (pcf) Field - 146.0
Air Temperature @ Time of Placement - 39 °F
Concrete Temperature ASTM C-1064 90˚ Max 58 °F
Slump (in) ASTM C-143 3-5" 3"
Air Content (%) ASTM C-231 3.5-6.5% 6.5%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel JG
210
Sample Time 11:20 AM Water Added On Site 0
Placement Type Chute Ticket # 49152207
Batch Time 10:40 AM Truck #
Location East Lot Mix Code A4780
Curb & Gutter
Placement Date 12/14/18 Supplier Martin Marietta
General
Set # 5 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
1 of 10
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
5886
6170
80995 Cone/Shear 6445
- - -
-
- - -
73970 Cone/Shear
-
45310 Cone/Shear 3606
4160
59260 Cone/Shear 4716
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Unit Weight (pcf) Field - 146.0
Air Temperature @ Time of Placement - 39 °F
Concrete Temperature ASTM C-1064 90˚ Max 58 °F
Slump (in) ASTM C-143 3-5" 3"
Air Content (%) ASTM C-231 3.5-6.5% 6.5%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel JG
210
Sample Time 11:20 AM Water Added On Site 0
Placement Type Chute Ticket # 49152207
Batch Time 10:40 AM Truck #
Location East Lot Mix Code A4780
Parking Pad
Placement Date 12/20/18 Supplier Martin Marietta
General
Set # 6 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
1 of 6
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
5537
5250
62360 Cone/Shear 4962
- - -
-
- - -
69580 Cone/Shear
-
55195 Cone/Shear 4392
4530
58640 Cone/Shear 4666
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Unit Weight (pcf) Field - 146.4
Air Temperature @ Time of Placement - 34 °F
Concrete Temperature ASTM C-1064 90˚ Max 54 °F
Slump (in) ASTM C-143 3-5" 4"
Air Content (%) ASTM C-231 3.5-6.5% 5.3%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel JG
1917
Sample Time 1:30 PM Water Added On Site 0
Placement Type Chute Ticket # 49154594
Batch Time 12:40 PM Truck #
Location Pylaster O Mix Code A3714
Footings
Placement Date 2/21/19 Supplier Martin Marietta
General
Set # 7 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
1 of 6
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
General
Set # 8 Application
Location S F - 5 Pad Mix Code A3714
West Deck Foundation
Placement Date 2/28/19 Supplier Martin Marietta
1724
Sample Time 2:05 PM Water Added On Site 0
Placement Type Chute Ticket # 49154890
Batch Time 1:31 PM Truck #
Sampled At (yards) Field Personnel JG
Project Specifications and Test Results
Test Specifications Results
Slump (in) ASTM C-143 3-5" 5"
Air Content (%) ASTM C-231 3.5-6.5% 4.0%
Unit Weight (pcf) Field - 145.6
Air Temperature @ Time of Placement - 48 °F
Concrete Temperature ASTM C-1064 90˚ Max 70 °F
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
-
65770 Cone/Shear 5234
5120
62795 Cone/Shear 4997
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
6429
6310
77710 Cone/Shear 6184
- - -
-
- - -
80785 Cone/Shear
-
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
1 of 20
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
General
Set # 9 Application
Location NW Corner Mix Code A3714
Column Pads
Placement Date 3/11/19 Supplier Martin Marietta
1732
Sample Time 1:15 PM Water Added On Site 0
Placement Type Chute Ticket # 49155145
Batch Time 12:22 PM Truck #
Sampled At (yards) Field Personnel JG
Project Specifications and Test Results
Test Specifications Results
Slump (in) ASTM C-143 3-5" 4"
Air Content (%) ASTM C-231 3.5-6.5% 4.5%
Unit Weight (pcf) Field - 143.2
Air Temperature @ Time of Placement - 52 °F
Concrete Temperature ASTM C-1064 90˚ Max 65 °F
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
-
52230 Cone/Shear 4156
3890
45550 Cone/Shear 3625
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
5020
5040
63515 Cone/Shear 5054
- - -
-
- - -
63085 Cone/Shear
-
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
1 of 32
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
6337
6550
85090 Cone/Shear 6771
- - -
-
- - -
79635 Cone/Shear
-
60620 Cone/Shear 4824
5240
70950 Cone/Shear 5646
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Air Temperature @ Time of Placement - 50 °F
Concrete Temperature ASTM C-1064 90˚ Max 70 °F
5.3%
Unit Weight (pcf) Field - 144.0
Slump (in) ASTM C-143 3-5" 4"
Air Content (%) ASTM C-231 5-8%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel GR
1623
Sample Time 11:05 AM Water Added On Site 0
Placement Type Chute Ticket # 49155517
Batch Time 10:36 AM Truck #
Location Danfield Court Mix Code HE4348
Crosspan
Placement Date 3/22/19 Supplier Martin Marietta
General
Set # 10 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
12 of 22
Age
Specimen (days)
1.3a 2
1.3b 2
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
5798
5660
69460 Cone/Shear 5527
- - -
-
- - -
72860 Cone/Shear
-
57660 Cone/Shear 4588
4590
- - -
Load (lbs) Failure Type (psi) (psi)
37175 - 2958
2960
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 3,000 PSI See Below
Air Temperature @ Time of Placement - 45 °F
Concrete Temperature ASTM C-1064 90˚ Max 50 °F
5.5%
Unit Weight (pcf) Field - 146.4
Slump (in) ASTM C-143 5" Max 4"
Air Content (%) ASTM C-231 4.5-7.5 %
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel KR
709
Sample Time 10:45 AM Water Added On Site 0
Placement Type Chute Ticket # 49155978
Batch Time 10:05 AM Truck #
Location S end of Wall Mix Code A3714
Wall
Placement Date 4/2/19 Supplier Martin Marietta
General
Set # 11 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
3 of 12
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
5805
5750
71620 Cone/Shear 5699
- - -
-
- - -
72945 Cone/Shear
-
61540 Cone/Shear 4897
4870
60790 Cone/Shear 4838
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Air Temperature @ Time of Placement - 43 °F
Concrete Temperature ASTM C-1064 90˚ Max 66 °F
5.0%
Unit Weight (pcf) Field - 144.4
Slump (in) ASTM C-143 3-5" 4"
Air Content (%) ASTM C-231 3.5-6.5 %
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel LK
743
Sample Time 10:15 AM Water Added On Site 0
Placement Type Chute Ticket # 49156492
Batch Time 9:46 AM Truck #
Location SWC of Building - 10' S 62' W Mix Code A4785
Curb & Gutter
Placement Date 4/16/19 Supplier Martin Marietta
General
Set # 12 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
3 of 17
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
* Joe with Neenan informed of high air content
- - -
-
- -
5019
5170
66800 Cone/Shear 5316
- - -
-
- - -
63070 Cone/Shear
-
55232 Cone/Shear 4395
4340
53905 Cone/Shear 4290
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Air Temperature @ Time of Placement - 77 °F
Concrete Temperature ASTM C-1064 90˚ Max 68 °F
*8.2%
Unit Weight (pcf) Field - 139.2
Slump (in) ASTM C-143 3-5" *5"
Air Content (%) ASTM C-231 3.5-6.5 %
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel LK
1918
Sample Time 10:35 AM Water Added On Site 0
Placement Type Pump Ticket # 49157594
Batch Time 10:01 AM Truck #
Location Main Lobby - SWC - 5' S 7' W Mix Code A4785
East Patio
Placement Date 5/13/19 Supplier Martin Marietta
General
Set # 13 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
2 of 29
Age
Specimen (days)
1.3a 1
1.3b 1
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
- - -
-
- -
5821
5880
74525 Cone/Shear 5931
- - -
-
- - -
73155 Cone/Shear
-
50895 Cone/Shear 4050
4290
56900 Cone/Shear 4528
Load (lbs) Failure Type (psi) (psi)
44330 - 3528
3530
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,500 PSI See Below
Air Temperature @ Time of Placement - 76 °F
Concrete Temperature ASTM C-1064 90˚ Max 67 °F
5.2%
Unit Weight (pcf) Field - 141.6
Slump (in) ASTM C-143 2-4" 4"
Air Content (%) ASTM C-231 5-8%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel LK
1950
Sample Time 10:30 AM Water Added On Site 0
Placement Type Chute Ticket # 49157780
Batch Time 9:53 AM Truck #
Location Drain Pan - SWC of Lot Mix Code HE4348
Perimeter Drain Pan
Placement Date 5/15/19 Supplier Martin Marietta
General
Set # 14 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
13 of 45
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
* Jim with Neenan informed of high slump
- - -
-
- -
5821
5880
74525 Cone/Shear 5931
- - -
-
- - -
73155 Cone/Shear
-
50895 Cone/Shear 4050
4290
56900 Cone/Shear 4528
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Air Temperature @ Time of Placement - 58 °F
Concrete Temperature ASTM C-1064 90˚ Max 74 °F
6.0%
Unit Weight (pcf) Field - 143.7
Slump (in) ASTM C-143 3-5" *6 1/4"
Air Content (%) ASTM C-231 3.5% - 6.5%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel LK
306
Sample Time 6:42 AM Water Added On Site 0
Placement Type Chute Ticket # 49158684
Batch Time 6:11 AM Truck #
Location NEC of Building - 45' S 21' E Mix Code A4785
Parking Area
Placement Date 6/6/19 Supplier Martin Marietta
General
Set # 15 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
3 of 50
Age
Specimen (days)
1.3a 3
1.3b 3
1.7a 7
1.7b 7
1.14a 14
1.14b 14
1.28a 28
1.28b 28
1.56a 56
1.56b 56 -
Specimen Diameter = 4 in Specimen Cross-Sectional Area = 12.57 sq in
* Jim with Neenan informed of high slump
- - -
-
- -
5845
6140
80885 Cone/Shear 6437
- - -
-
- - -
73450 Cone/Shear
-
59355 Cone/Shear 4723
4740
59660 Cone/Shear 4748
Load (lbs) Failure Type (psi) (psi)
- - -
-
- -
Compressive Strength Test Results (ASTM C-39/C-31)
Maximum Applied Compressive Strength Rounded Avg.
28-day Compressive Strength (min) 4,000 PSI See Below
Air Temperature @ Time of Placement - 60 °F
Concrete Temperature ASTM C-1064 90˚ Max 71 °F
6.4%
Unit Weight (pcf) Field - 141.6
Slump (in) ASTM C-143 3-5" *6"
Air Content (%) ASTM C-231 3.5% - 6.5%
Project Specifications and Test Results
Test Specifications Results
Sampled At (yards) Field Personnel LK
1916
Sample Time 6:30 AM Water Added On Site 0
Placement Type Pump Ticket # 49158779
Batch Time 5:20 AM Truck #
Location NWC of Building - 45' S 5' W Mix Code A4785
Slab for West Deck
Placement Date 6/7/19 Supplier Martin Marietta
General
Set # 16 Application
19-2015
Summary of Cast-In-Place Concrete Test
MADWIRE (3405 TIMBERLINE)
Fort Collins, Colorado
Maximum
6/29 6 1 Parking Lot - NEC of Building - 150' S 103' E F5BN20
6/29 5 1 F5BN20 153.2 95% 92-96% Pass
144.3 153.2 94% 92-96% Pass
Parking Lot - NEC of Building - 195' S 69' E
153.2 94% 92-96% Pass
144.8
6/29 4 1 F5BN20 145.0 153.2 95% 92-96% Pass
6/29 3 1 Parking Lot - SWC of Building - 185' S 100' W F5BN20
Parking Lot - SWC of Building - 186' S 250' W
153.2 94% 92-96% Pass
144.1
6/29 2 1 F5BN20 143.0 153.2 93% 92-96% Pass
6/29 1 1 Parking Lot - SWC of Building - 186' S F5BN20
Parking Lot - SWC of Building - 186' S 15' W
153.2 95% 92-96% Pass
143.3
6/27 5 1 F5BN20 145.3 153.2 95% 92-96% Pass
6/27 4 1 Parking Lot - NEC of Building - 230' S 58' E F5BN20
Parking Lot - NEC of Building - 105' S 60' E
153.2 94% 92-96% Pass
145.5
6/27 3 1 F5BN20 144.8 153.2 95% 92-96% Pass
6/27 2 1 Parking Lot - NEC of Building - 100' S 39' E F5BN20
Parking Lot - NEC of Building - 200' S 30' E
151.6 95% 92-96% Pass
143.5
145.3 153.2 95% 92-96% Pass
144.1
6/27 1 1 F5BN20
6/25 8 1 F5BN20
6/25 6 1 F5BN20
6/25 7 1 F5BN20
Parking Lot - SWC of Building - 110' S 90' E
Parking Lot - SWC of Building - 60' S 69' E
Parking Lot - SWC of Building - 80' S
Parking Lot - NEC of Building - 33' E
151.6 96% 92-96% Pass
144.3 151.6 95% 92-96% Pass
151.6 96% 92-96% Pass
144.8
142.9 151.6 94% 92-96% Pass
6/25 4 1 F5BN20 145.0
6/25 5 1 F5BN20
Parking Lot - SWC of Building - 126' S 62' E
Parking Lot - SWC of Building - 150' S 20' W
Pass
6/25 3 1 F5BN20 142.8 151.6 94% 92-96% Pass
6/25 2 1 Parking Lot - SWC of Building - 70' S 60' E F5BN20 144.7 151.6 95% 92-96%
Parking Lot - SWC of Building - 100' S 29' W
6/25 1 1 Parking Lot - SWC of Building - 75' S 11' W F5BN20 144.8 151.6 96% 92-96% Pass
Correction Gravity Required
Percent Percent
Gauge Specific Compaction Compaction (Pass/Fail)
Fort Collins, Colorado
Project # 19-2015
June 2019
Field Asphaltic Concrete Density Test Summary
MADWIRE
Approximate Test Location
Lift Top
Supplier Asphalt Specialties Co.
Truck # TSD06
Ticket # 265188
Sample Date/Time 6/25/2019 @ 10:55 AM
Location SWC of Building - 100' S 50' E
Asphalt Mix F5BN20
No. 100 - 11%
No. 200 - 7.4%
No. 30 - 28%
No. 50 - 18%
52%
No. 16 - 39%
No. 4 - 65%
No. 8 -
3/8" - 92%
1/2" - 98%
3/4" - 100%
1" 100%
SIEVE ANALYSIS (ASTM C-136 & C-117)
SIEVE SIZE SPECIFICATION PERCENT PASSING
1 1/2" 100%
5.5% - +/- -
EXTRACTION (ASTM D-2172)
ASPHALT CONTENT (%) MIX DESIGN SPECIFICATION
ASPHALT EXTRACTION/GRADATION TEST SUMMARY
MADWIRE
Fort Collins, Colorado
Project # 19-2015
June 2019
Sample Date/Time 6/25/2019
Location Sampled by Asphalt Specialties
Asphalt Mix F5BN20
Lift Top
Supplier Asphalt Specialties Co.
Truck # TSD04
Ticket # 265202
No. 100 - 10%
No. 200 - 6.8%
No. 30 - 27%
No. 50 - 17%
3/8" - 83%
No. 4 - 70%
No. 8 - 54%
No. 16 - 40%
3/4" - 99%
1/2" - 87%
SIEVE ANALYSIS (ASTM C-136 & C-117)
SIEVE SIZE SPECIFICATION PERCENT PASSING
1 1/2" 100%
1" 100%
EXTRACTION (ASTM D-2172)
ASPHALT CONTENT (%) MIX DESIGN SPECIFICATION
5.3% - +/- -
MADWIRE
Fort Collins, Colorado
Project # 19-2015
June 2019
ASPHALT EXTRACTION/GRADATION TEST SUMMARY
Technician: Pappert, Jack Date: 01/16/2019
Type of Inspection:
Visual Weld (AWS D1.1 Table 6.1) / High Strength Bolt (AISC Spec. for Structural Joints Using ASTM A325 or A490 Bolts, Sect. 8,9) /
Anchor Bolts (Project Specifications)
Weld Locations:
At the Mad Wire remodel, we inspected the 1/4inch fillet welds of the plates between the added north tube column and the W8 x 40
existing column. We also inspected the 1/4inch fillet welds of the angles to the south tube column. 7018 electrodes, 1/4 inch fillet
welds in the H. V and O positions. We inspected approximately 40 lineal inches of welds. We accepted 100% of the welds we
inspected.
Bolt Locations:
At the Mad Wire remodel, we inspected the 3/4 inch diameter Nucor A325TC bolts for the added beam to the added tube column
connections. All of the bolts had been tensioned to snapoff and had washers installed at the time of our inspection.
We also inspected the 5/8inch diameter anchor bolts at the added tube column base plates. All of the anchor bolts were in the snug
tight condition or greater with washers installed at the time of our inspection.
Plans By: Metal Solutions, no. 18039, dated 121218
At the time of our observation, the items observed met the quality standards listed above: Yes
Discrepancies were observed, see attached discrepancy list: No
Visual Weld and Bolt
Observation
Report Date: 1/23/2019
Fort Collins
400 North Link Lane
Fort Collins, CO 80524
Phone: 9702069455
Client:
Soilogic
3522 Draft Horse Court
Loveland, CO 80538
Project:
FC08728.000F390
Madwire
3405 S Timberline
Ft Collins, CO
Page 1 of 2 1
Technician: Pappert, Jack Date: 01/24/2019
Type of Inspection: Visual Weld (AWS D1.1 Table 6.1)
Weld Locations:
We inspected the groove welds of the #4 rebar to the P900 precast embed plates for the Madwire remodel at gridlines 8 @ Q P. We
inspected approximately 18 lineal inches of welds, and accepted 100% of the welds we inspected.
Plans By: Encon Design LLC, no. 6283, dated 6118.
At the time of our observation, the items observed met the quality standards listed above: Yes
Discrepancies were observed, see attached discrepancy list: No
Visual Weld and Bolt
Observation
Report Date: 2/6/2019
Fort Collins
400 North Link Lane
Fort Collins, CO 80524
Phone: 9702069455
Client:
Soilogic
3522 Draft Horse Court
Loveland, CO 80538
Project:
FC08728.000F390
Madwire
3405 S Timberline
Ft Collins, CO
Page 1 of 2 1
Technician: Pappert, Jack Date: 02/13/2019
Type of Inspection: Visual Weld (AWS D1.1 Table 6.1)
Weld Locations:
At the northeast and southeast corners of the main entry tower, we inspected the 1/4inch fillet welds of the trellis extension beams to
the columns. 7018 electrodes, 1/4inch fillet welds in the H, V, and O positions. We inspected approximately 108 lineal inches of
welds and accepted 100% of the welds we inspected.
Plans By: Metal Solutions, no. 18039, dated 122618.
At the time of our observation, the items observed met the quality standards listed above: Yes
Discrepancies were observed, see attached discrepancy list: No
Visual Weld and Bolt
Observation
Report Date: 3/5/2019
Fort Collins
400 North Link Lane
Fort Collins, CO 80524
Phone: 9702069455
Client:
Soilogic
3522 Draft Horse Court
Loveland, CO 80538
Project:
FC08728.000F390
Madwire
3405 S Timberline
Ft Collins, CO
Page 1 of 2 1
Technician: Pappert, Jack Date: 04/15/2019
Type of Inspection:
Visual Weld (AWS D1.1 Table 6.1) / High Strength Bolt (AISC Spec. for Structural Joints Using ASTM A325 or A490 Bolts, Sect. 8,9)
Weld Locations:
At the east side trellis, gridlines 88.5 E 100 @ A ZZ, we inspected the butt welds of the tube beam splices, the 3/16inch fillet
welds of the tube beams and clips to the tube beams and of the tube beams to the columns. We also inspected the 3/16inch groove
welds of the tube beams to the columns and the 1/4inch fillet welds of the relocated beam hanger plates to the tube beams. Redd
Arc DX450 machine, 7018 electrodes, 3/16 and 1/4inch fillet and butt welds in the F, H, and V positions. We inspected
approximately 615 lineal inches of welds, of which approximately 2% were rewelded. We accepted 100% of the welds we inspected.
Bolt Locations:
For the east side trellis framing, gridlines 88.5 E 100 @ A ZZ, we inspected the 3/4inch diameter Nucor A325T bolts for the beam
to beam connections. All of the bolts were tensioned to snapoff with washers installed at the time of our inspection.
Plans By: Metal Solutions, no. 18039, dated 4319
At the time of our observation, the items observed met the quality standards listed above: Yes
Discrepancies were observed, see attached discrepancy list: No
Visual Weld and Bolt
Observation
Report Date: 5/2/2019
Fort Collins
400 North Link Lane
Fort Collins, CO 80524
Phone: 9702069455
Client:
Soilogic
3522 Draft Horse Court
Loveland, CO 80538
Project:
FC08728.000F390
Madwire
3405 S Timberline
Ft Collins, CO
Page 1 of 2 1
Density
Date Test # Lift Mix With Theoretical
33 6/24 4 BG Parking Lot Road Base - SEC of Building - 47' S 105' W B 5.8% 134.1 -0.2% 99% Pass Pass
32 6/24 3 BG Parking Lot Road Base - SEC of Building - 44' S 29' W B 6.0% 134.0 0.0%
Compaction Requirement
Proctor ID: A B
Moisture Content Requirement ±2% ±2%
Optimum Moisture Content (%) 16.0% 6.0%
Maximum Dry Density (pcf) 114.0 136.0
Procedure D-698 D-698
Compaction Requirement 95% Min 95% Min