Loading...
HomeMy WebLinkAbout607 Ramah Dr - Special Inspections/Engineering - 08/13/2020Engineering Studio Denver DBA Veradvn, LLC 441 Wadsworth Blvd — Unit 206 Lakewood, CO 80226 720.612.7553 92-0a Z'oq Final Observation for: Dream Style Remodeling Date: 08/13/20 Job Number: g 6 0 0 Property Address: 607 Ramah Drive, Fort Collins, Colorado, United States of America Reference: Observation of Residence Report Date of Observation: 08/07/20 Completed by: Dustin Randle by Engineering Studio Denver dated 08/13/20 Scope of Observation: To make a determination of structural integrity of holes cut in floor joists. The joist were cut and reinforced in a way that is structurally sound. LL Observations • The observed new construction, described in the scope above, meets the requirements indicated in the above referenced ES Denver report. ES Denver was not on site during the installation but observed the completed construction to be structurally sound. Based on our limited observations, it appears that the observed new construction was performed in general compliance with the recommendations. • Additional Notes: The performance of the new construction is dependent upon maintaining the proper grading and drainage of surface water. The property, owner should be made aware of the importance of providing and maintaining proper grading and drainage around the perimeter of the structure. Page 1 of 3 Images The following images detail the observations made at the work site: y 7 Page 2 of-3 Deliverables All items observed were found to be structurally sound and up to building code and the standards of ES Denver. Contractor Responsibilities Engineering Studio Denver performed a full observation of the work site and thoroughly examined all new construction areas in accordance with the engineering standards of ES Denver. Limitations of Services a. This report is based on the available data and the limited accessibility of the elements and compounds of the structure. No invasive testing was conducted. b. The opinions and assessment of this structure are based on accepted general practice and are limited to the data available to our office. ES Denver makes no warranty on the continued structural integrity of the property. c. Stability of soils in Colorado are unpredictable and unknown for what future condition may exist. d. Based on this information, the value of the observation given is mutually agreed to be limited to the cost of the observation report. Thank you for having ES Denver perform this observation. Please contact us at 720.612.7553 for any questions regarding this report. Regards, Dustin Randle, PE President/CEO f Digitally signed by Dustin -- Randle — DN: C=US, j J — E=d-ustin@esdenver.com, Du$+ln i Rand@ O=Engineering Studio l , R Denver, OU=Engineering i ---Studio Denver, i CN=Dustin Randle ----- ---Date: 2020.08.13 10:00:30-06'00' Page 3 of