HomeMy WebLinkAbout2502 Nancy Gray Ave - Special Inspections/Engineering - 05/12/2020May 13,2020
Nico Carnpana
ncami)ana(a)bellisimoinc.com
"Project .'.-Sabino
Location: 2-502'��cy Gra Y,,. Fort LCollin" Colorado
TDSE Proje�c* No.: 19-418,
.0ilyservation Datesc May, 1A%2020'-
f.
TD 5TRUGTUKA,L
ENGINEERING INC
6 r � / � ?(0/()
Plans/Details: Plans by TD Structural Engineering Inc. dated 11/7/19
Per your request I have reviewed the strapping installation at the stairs. The strapping has been
corrected and Is in general conformance with our recommendations.
Sincerely,
oO L
Wendy, Thomas. Dworak" R E-
President
TD'Structural'EnglineeCing Inc.
TD Structural Engineering, Inc. 1 2909 Oxford Ct., Fort Collins, CO 80525 1970.372.1140 1 www.tdstructural.com