Loading...
HomeMy WebLinkAbout2502 Nancy Gray Ave - Special Inspections/Engineering - 05/12/2020May 13,2020 Nico Carnpana ncami)ana(a)bellisimoinc.com "Project .'.-Sabino Location: 2-502'��cy Gra Y,,. Fort LCollin" Colorado TDSE Proje�c* No.: 19-418, .0ilyservation Datesc May, 1A%2020'- f. TD 5TRUGTUKA,L ENGINEERING INC 6 r � / � ?(0/() Plans/Details: Plans by TD Structural Engineering Inc. dated 11/7/19 Per your request I have reviewed the strapping installation at the stairs. The strapping has been corrected and Is in general conformance with our recommendations. Sincerely, oO L Wendy, Thomas. Dworak" R E- President TD'Structural'EnglineeCing Inc. TD Structural Engineering, Inc. 1 2909 Oxford Ct., Fort Collins, CO 80525 1970.372.1140 1 www.tdstructural.com