HomeMy WebLinkAbout226 Lorien Ln - Special Inspections/Engineering - 04/17/2020March 19, 2020
Signature Construction, LLC
720 31 Avenue SW
Carmel, IN 46032
Attn: Mr. Matt Boyle
P: (317) 208-3761
E: mboyle@pedcor.net
ate-, l a 2'Z&-;0J LJ
Re: Construction Materials Compliance Summary
Lakeview on the Rise Retaining Wall
6740 South College Avenue
Fort Collins, Colorado
Terracon Project No. 20191092.0096
Dear Mr. Boyle,
Terracon Consultants, Inc. (Terracon) provided construction materials testing, observation, and
inspection services for the Lakeview on the Rise Retaining Wall project starting on November
12, 2019 through March 3, 2020. The purpose of this letter is to state to Signature Construction,
LLC and the retaining wall design Engineer of Record that, to the best of our knowledge, the
construction on the project referenced above has been completed in substantial conformance
with the approved contract documents and with the provisions of the applicable building code.
Terracon issued periodic reports throughout the project, which detailed the on -site special
inspection and testing. Terracon reported that the work requiring special inspection was, to the
best of the inspector's knowledge, in general conformance with the approved plans,
specifications, and applicable workmanship provisions of the code. Exceptions and outstanding
discrepancies (if any) noted for the project are presented in each of the following items. This
Conformance Letter confirms the content and conclusions of the periodic and final reports
issued by Terracon.
Our scope of services for this project included testing, observations, and inspections of
earthwork, foundation excavations, and wall construction for retaining walls 1 through 6.
Terracon has issued periodic reports throughout the duration of the construction summarizing
the results of our testing and inspection services for this project. We recommend the project
Engineer of Record review the observation and test reports for acceptance as meeting
the project criteria including the outstanding discrepancies (if any) listed in each of the
items listed below.
Terracon Consultants, Inc. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado 80525
P [970] 484-0359 F [970] 484-0454 www.terracon.com
nvironmenta onstruction Material Facilities
Construction Materials Compliance Summary
Lakeview on the Rise Retaining Wall o Fort Collins, CO 1 r�rr�con
March 19, 2020 o Terracon Project No. 20191092.0096
Retainina VVall Construction 7estina and Obsenrations
Our services for the project included laboratory testing of the soils for compliance with the
project spec'rfications and Geotechnical Engineering Report performed by Terracon (Project No.
20165101; dated January 12, 2017). As recommended in the Construction Plans from Anchor
Wall Engineering, LLC (dated December 3, 2019), approved imported soils were suitable for
placement during construction in select, designated areas as defined in the plans and
specifications., Laboratory test results indicated fill materials tested by Terracon were in general ,
accordance with the recommendations presented in the project specifications.
Terracon also observed the construction procedures, performed in-place field density
compaction testing during placement of the fill to check percent compaction and water content
of prepared backfill areas on a full-time basis. Terracon performed a total of ninety-two (92) in-
place field density tests during placement of wall backfill. The test results were within and/or
accepted as meeting the specified limits for percent compaction and percent water content.
Terracon observed the placement of geosynthetic reinforcement, retaining wall units, gravel fill
in the retaining wall cores and 1 foot behind the units, leveling pad materials, and wall
components were in general accordance with the retaining wall plans.
Our test results represent only the materials at the location and time of testing. Terracon did not
direct or control the fill placement and compaction at the site. _
Foundation Excavation Observations
Terracon was requested to observe the completed foundation excavation(s) for the retaining
walls. As stated in our Excavation Observation reports, we believe the subsurtace conditions
were consistent with those described in the Geotechnical Engineering Report performed by
Terracon (Project No: 20165101; dated January 12, 2017).
Conclusion
This report has been prepared for the exclusive use of providing test data and observations to
document the retaining wall construction and foundation operations conducted for the proposed
project. The opinions and conclusions presented have been derived in accordance with
generally accepted materials engineering practice. No other warranty, express or implied, is
made. It should be noted that our testing and observation services were performed on an as-
requested basis, and only when requested by the above-listed client or their designated
representative. We offer no opinion regarding materials not tested or observed by Terracon
representatives.
This letter is prepared for the exclusive use and reliance of our client. Use or reliance by any
other party is prohibited without the written authorization of our client and Terracon. This letter
Responsive o Resourcefui o Reliable 2
} . . �
Construc2ion AAat�ri�ls Coeropliance Sumeanary ���������
Lakeview on the Rise Retaining Wall s Fort Collins, CO
March 19,2020 e Tercacon Project No. 20199092.0096
does not impact in any way the rights and obligations of third parties, including contractors and
subcontractors who may have provided the construction materials and/or construction services
tested orobserved.
It has been our pleasure to work with you on this project and to continue providing services
during your ongoing construction. Should you have any questions, or need additional
information, please contact us at your convenience.
� i a O REG+
Sincerel '�• �S
Terrac n Consultants Inc. p;•'.'J E��•.,'���
' �� ��� i�s�
U.i� �38829 �,�=�"
�q ,�,:
`��/� !7i' , ?►`;: �: ,,
, '�,.
Cra�g . �e�on Eric D. Bernhardt, P.E. .•/((j�yqLE�
Project Manager Geotechnical Department er