December 17, 2018
Anchor Development
1450 Bubbling Brook Court
Fort Collins, Colorado 80521
w1alamS
Sc G1550C2GlTMS
STRUCTURAL ENGINEERS
Re: Footigg and Foundation Wall Steel - Duplex and Detached Garage
802 pex Drive
Fort Collins, Colorado
Project No. 216068
Gentlemen:
On December 131" and 17"', 2018, a representative of Weeks & Associates observed
footings foundation wall steel at the referenced site. Observations indicate the footing,
foundation steel reinforcement are in substantial accordance with the engineered
foundation plan for the project by Weeks & Associates. In addition, the electrode had
been placed in the duplex and detached garage in accordance with the
recommendations by NEC.
If we can be of further assistance please contact us.
Sincerely,
Weeks & Associates, Inc.
Patrick Sanders, E.I.T.
Staff Engineer
4,"-,012 'n .
Weeks, P.E. 4
al?E�ngineer.•
4730 South College Ave, Suite 201, Fort Collins. CO 80525
Phone (970) 225.2422 - Fax (970) 225.2622
z 19JD Cb5al
January 2, 2019
Anchor Development
1450 Bubbling Brook Court
Fort Collins, Colorado 80521
Re: Perimeter Drain & Damproofing
802 Apex Drive
Fort Collins, Colorado
Project No. 216068
Gentlemen:
WGCLFiS
S E1SS0C=G1TI2S
STRUCTURAL ENGINEERS
On December 281', 2018, Weeks & Associates observed the perimeter drain at the
referenced site. Observations indicated a 4" diameter perforated pipe had been
placed around the exterior perimeter of the basement foundation at each unit and
sloped to a sump pit in each unit. The drainpipe installation is in substantial
accordance with the perimeter drain recommendations for the project. In addition, the
exterior of the foundation walls had been damproofed.
If we can be of further assistance please contact us.
Sincerely,
Weeks & Associates, Inc.
Patrick Sanders, E.I.T.
Staff Engineer
i
23+�
feeks, P.E. : 4,c
eer .•' c
C�
NXII.
4730 South College Ave, Suite 201, Fort Collins, CO 80525
Phone (970) 225.2422 - Fax (970) 225.2622