HomeMy WebLinkAbout1820 S College Ave - CO/LOC/Other - 11/02/2018City of Community Development & Neighborhood Services
Fort Collins r College Ave
Fort
Collins,Fort CCO 80522
97o.221.676o 970.224.6134 -fax
Temporary Certificate of Occupancy
Permit #: B1803510
Work Description: TENANT FINISH OF'EYEMART EXPRESS' (PREVIOUSLY VISION EYELAND SUPER
OPTICAL) TO INCLUDE REMOVAL OF EXISTING INTERIOR WALLS, CEILING LIGHTS AND
GRIDS. INSTALLATION OF NEW WALLS, FINISHES, FIXTURES, AND CEILING LIGHTS.
WORK ALSO TO INCLUDE INSTALLATION OF NEW FURNACE, NEW DUCTS, AND RELATED
MEP WORK. EXISTING REAR ROOF TOP UNIT TO REMAIN. ** UNITL LEVEL ADDRESSING
WAS CREATED FOR MAILING PURPOSES(SUITES A AND B), ONLY ONE TENANT IN
SPACE. ** JOB CONTACT: RANDY GILLEN 970-214-0976
This is to certify that the building, structure, or land located at 1820 S COLLEGE AVE Fort Collins, CO has been
inspected and temporary occupancy is hereby authorized, effective on 11/02/2018 and conditional upon the
following requirements being completed and.approved upon final inspection.
Bldg Dept Req Docs Rcvd Requirements to be Completed-Bw-11 /09/2018
111/0212018 Hold for., AC test and balance(on new fumdce system min)..,
I i
- I
If such work is not completed withihith'e time set forth above and approved onffinal inspection, or unless the )
time for.completion is extended by the Buildirig and Zoning ,Office; anbrder to vacate the premises, orLal
violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be
issued. Such violatjon'is subject to a maximum fine of $1000 00-per day of r every day of violation.
.A.'" #"4"Slze
Authorized By:
<<_2-l9
Date
Date of Issuance: 11/02/2018
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owners name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owners name, utilities will continue to befumished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
11/022018 09:11:34 AM Page 1 of 1