HomeMy WebLinkAbout5926 Tilden St - Special Inspections/Engineering - 03/12/2019Green City Consulting 3801 E. Florida Avenue, Suite 708 Denver, CO 80210 Phone: (303) 758-8880 March 12, 2019 Richmond American Homes 4350 S. Monaco Street Denver, CO 80237 Re: Foundation & Exterior Lateral Treatment Compliance Letter Mail Creek Crossing Plan D29A/A/Full/3-Car Right Lot 1, Plock 9 5926 Tilden Street - To Whom It May Concern: We hereby state that the foundation and framing portion for the above referenced address was constructed in general conformance with the construction documents designed for this address. Inspection Type: Date: Inspected By: Footing Inspection Foundation Wall Inspection Concrete — Encased Electrode Finished Wall Void Inspection Exterior Lateral Treatment Inspection Exterior Lateral Treatment Reinspection Exterior Lateral Treatment Reinspection Please contact us with any questions. Respectfully, Ronald Ngz Green City 11/30/18 G.C.C. 12/07/18 G.C.C. 12/07/18 G.C.C. 12/13/18 G.C.C. 02/22/19 G.C.C. 02/27/19 G.C.C. 03/11/19 G.C.C. A.G-w Cenaa1' FIELD OBSERVATION REPORT Report#:DP000002 �e c. Residential Client: 2180 South Ivanhoe Street, Suite 5 Denver, CO 60222 Richmond American Homes Phone: (303) 759-8100 4350 South Monaco Street Denver, CO 80237 DAMP -PROOFING OBSERVATION Activity Date: 12/19/2018 Technician: Anderson, Tammy Project: 165063R 5926 Tilden St, Lot 1, Block 9 Mail Creek Crossing Fort Collins, CO As requested, we arrived on site on this date to observe the applied dampproofing material on below -grade living space foundation walls. The portions of the dampproofing we observed were applied to the foundation walls that are planned to be below -grade, finished space areas and we believe the observed dampproofing was applied in general conformance with our recommendations. If you have any questions regarding this information, please call. Observations were conducted on a part-time, on -call basis. 32593. 12/20/2018 Kenneth R. Broseghini, P.E. Senior Engineer Observations are conducted on a part-time, on -call basis (unless noted otherwise). Information obtained by our Page 1 of 1 field representative pertain only to the portions of the foundation/construction items observed during our site visit. Our opinions presented in this report are based on our knowledge of this project, our experience with similar conditions and the standard of care normally practiced by other geotechnical engineers in this area and upon a reasonable presumption that unobserved conditions were properly constructed. A.Q. senaar FIELD OBSERVATION REPORT Report#: DR-000003 WPMIM fi�wy... Residential Client: Project: 2180 South Ivanhoe Street, Suite 5 Denver, CO 80222 Richmond American Homes 165063R Phone: (303) 759-8100 4350 South Monaco Street 5926 Tilden St, Lot 1, Block 9 Denver, CO 80237 Mail Creek Crossing Fort Collins, CO PERIMETER DRAIN OBSERVATION Activity Date: 12/19/2018 Technician: Anderson, Tammy As requested, we arrived on site on this date to observe visible portions of the perimeter drain line. It is our opinion that the portions of the perimeter drain observed on this date were in general conformance with our recommendations. If you have any questions regarding this information, please call. Observations were conducted on a part-time, on -call basis. Pao �icFt� %o 12/20/2018 Kenneth R. Broseghini, P.E. Senior Engineer Observations are conducted on a part-time, on -call basis (unless noted otherwise). Information obtained by our Page 1 of 1 field representative pertain only to the portions of the foundation/construction items observed during our site visit. Our opinions presented in this report are based on our knowledge of this project, our experience with similar conditions and the standard of care normally practiced by other geotechnical engineers in this area and upon a reasonable presumption that unobserved conditions were properly constructed.