Loading...
HomeMy WebLinkAbout417 N Grant Ave - Special Inspections/Engineering - 05/17/2018Robinson Engineering, Inc (970) 217-4960 319 South Grant Avenue, Fort Collins, Colorado 880521 PO Box 2459, Fort Collins, Colorado 80522 May 17, 2017 Fort Collins Building Department and Torey Lenoch 417 N Grant Avenue Fort Collins, Colorado 80521 Dear Sirs. RE: Foundation Inspections. Footings and Wall, Garage at 417 North Grant Avenue, Fort Collins. CO. REI Proiect 16-081 Robinson Engineering, Inc. was asked by the owner, Torey Lenoch to review garage plans by an architect resulting in our signing and stamping the plans. The garage excavation was over dug with respect to depth, but after exploring an option, returned to the stamped design with the garage over excavation filled and compacted. The review was in October 2016. In early November 2016, I inspected the garage footings prior to concrete placement. The forms appeared to match the dimensions on the plans. The continuous rebar and verticals were correctly spaced and installed. The footer preparation met the intent of our design. A few days later I returned to the site and inspected the wall forms. Again, the forms appeared to meet the geometry of the plans. The vertical and horizontal rebar grid was tied to the footer verticals. Anchors were on sight ready to stab. Everything I observed indicated that the foundation met the intent of the specified design. In my opinion, as a structural engineer, having reviewed the garage foundation plans then visited the site several times during construction, that the foundation meets the intent of the plan specifications. It is my opinion that the garage foundation will provide support for the site loads for the design life of the structure. If there are any questions, please call. Sincerely, Geoff Robinson, PE Civil / Structural Engineer Wood Technologist `p 0 C. Oe:P�V •R'�s� CI e Oeti � C�; o N 10 (D�4�a�56 z; MAY 17 2011 Inspection and comments are limited to the specific items listed in this letter and in no way implies a certification or complete inspection of the structure, its systems or site work No liability is assumedforfumre loss of value, marketability or any other loss claims. May 17, 2017