Re: Construction Observation and Testing — Final Summary Letter
Lemay Self Storage —Building "D2" Permit No. B1704323
1057 Buckingham Street
Fort Collins, Colorado
EEC Project No. I t74099
Ms. Martinez:
As you are aware, during various construction phases for Building "132", recently completed
within the Lemay Self -Storage Facility, located at the southwest corner of Lemay Avenue and
Buckingham Street in Fort Collins, Colorado, Earth Engineering Consultants, LLC (EEC)
personnel, provided observation and testing services of requested items on a part-time, as-
needed/on-call basis. Reports concerning the services provided by EEC personnel were
submitted to McCauley Constructors, Inc. (the project's General Contractor) and to other project
design team members' attention during the appropriate time periods as the test results became
available.
We have recently been asked by Mr. Lauren McCauley, Project Superintendent with McCauley
Constructors, Inc., to provide a summary letter addressing the services performed by EEC's
personnel during the construction phase from August 2017 through June 2018, regarding but not
limited to the following items: foundation observations, reinforcement observations of the
foundation system, (i.e., spread footings/turn down slab and walls), non-destructive testing
(NDT) observations and services associated with the structural steel erection components and
light gauge framing elements for the project, earthwork related elements associated with the
proposed development including building pad and foundation bearing strata preparation, utility
trench backfill and site improvements, along with testing of cast -in -place concrete
During the foundation construction phase for the referenced project, EEC personnel provided site
observations and testing services for foundation/footing system and interior floor slab for
Building "132". The site observations and testing services during the foundation and interior
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
(970) 545-3908 (FAX) 663-0282
www.earth-engineering.com
Earth Engineering Consultants, LLC
Lemay Self Storage — Final Summary Letter for Building "D2"
EEC Project No. 1174099
June 19, 2018
Page 2
floor slab construction phases were performed and completed, as recommended in the project -
specific subsurface exploration report, (please refer to EEC's "Subsurface Exploration Report"
dated April 26, 2016, EEC Project No. 1 162031).
EEC personnel provided site observations/foundation excavation observation of the bearing
strata, and field density testing of engineered fill material placed and compacted to enhance the
bearing strata and underslab subgrades as per the project specifications. EEC personnel provided
reinforcement observation of the foundation system including the conventional spread
footings/turn-down slab placed on approved engineered/controlled fill material, cast -in -place
concrete elements and interior floor slab. EEC personnel also provided testing of all cast -in -
place concrete for the foundation system, interior floor slab(s), along with the exterior concrete
flatwork areas.
Based on our review of the outlined testing, as directed by the general contractor and completed
by EEC personnel on an as -needed basis, the final field density test results within the building
footprint's foundation and floor slab areas, and sitework/utilities, met the project compaction
requirements for fill materials placed and compacted to redevelop foundation bearing strata,
interior floor slab elevations, and backfill placed adjacent to foundation walls. Laboratory
compressive strength tests completed on the cast -in -place concrete for the foundation related
elements and floor slabs (both interior and exterior) conformed to the project specified minimum
28-day compressive strengths requirements.
Observations of reinforcement within the foundation system, and the interior and exterior
flatwork areas for the project, were completed by EEC personnel and reports were submitted to
your attention during the appropriate periods as the results became available. Based on our
review of the outlined observations, we believe the reinforcement within the foundation system,
and interior and exterior slabs were placed and constructed in general compliance with the
project plans and specifications.
Observations for the structural steel erection, welding and bolt connections and light gauge
framing were completed by EEC's in-house ICC Bolt and Weld *Inspector, and reports were
submitted to your attention during the appropriate period as the results became available. The
work that was visually observed in the areas of the referenced gridlines as previously reported,
appeared to be in general accordance with the project plans and details dated December 6, 2016.
Earth Engineering Consultants,LLC
Lemay Self Storage - Final Summary Letter for Building "D2"
EEC Project No. It 74099
.Tune 19. 2018
Page
Additional copies of our sixteen (1,6) periodic/bi-monthly construction materials testing
(CMT)/quality control (QC) test reports dated August 31, 2017 - Submittal No. 1, October 11,
2017 - Submittal No. 2, November 17, 2017 - Submittal No. 3, November 29, 2017 - Submittal
No. 4, December 13, 2017 - Submittal No. 5, December 28, 2017 - Submittal No. 6, January 9,
2018 - Submittal No. 7, January 19, 2018 - Submittal No. 8, February 13, 2018 - Submittal No.
9, February 14, 2018 - Submittal No. 10, March 5, 2018 - Submittal No. 11, April 5, 2018 -
Submittal No. 12, April 23, 2018 - Submittal No. 13, May 11, 2018 - Submittal No. 14,June 5;
2018 - Submittal No. 15, and June 7, 2018 - Submittal No. 16 are available upon request.
We appreciate the opportunity to be of service to you on this project. If you have any questions
regarding this report or if we can be of further service to you in any other way, please do not
hesitate to contact us.
Very truly yours,
Earth Engineering Consultants, LLC
David A. Richer, P.E.
Senior Geotechnical Engineer
-htspector/Inspection: The visual observation of construction to permit the Consultant (FF.C), «s an experienced
raid qualified professional, to determine that the Work, when completed by the Contractor, generally conforms to the
Contract Documents. In making such inspections, the Consultant makes no guarantees fort and has no authority or
control over, the Contractors performance or failure to perform the Work in accordance with the Contract
Documents. The Consultant has no responsibility for the means, methods, techniques, sequences or procedures
selected by the Contractor or fart• the Contractor's sgfe(l, precautions and programs nor for failure by the
Contractor to comply with any hnvs at- regulations relating to the petfornnance or fntrnishing of the Work by the
Contractor.
cc: McCauley Constructors, Inc. - Garvin.westhoffa.mecaulevconstructors.com
McCauley Constructors, Inc. - lauren a,mccaulevconstructors.com
McCauley Constructors, Inc. - Barry(tushermans3.ccnn
Momentum Ft Collins, LLC - jamesmteniple a)msn.com
Momentum Ft Collins, LLC - jeff((i�momentumdevco.com