Permit # B1602248
Work Description CONSTRUCTION OF A 1-STORY 37 621 SQ FT MEMORY CARE FACILITY' WINDSONG AT
ROCK CREEK " GREASE INTERCEPTOR TO BE INSTALLED WITH COMMERCIAL
KITCHEN ENERGY COMPLIANCE COMCHECK CITY WATER JOB CONTACT JUSTIN
DAVIS 970-682-5667
This is to certify that the building structure or land located at 3160 ROCK CREEK DR Fort Collins, CO has been
inspected and temporary occupancy is hereby authorized effective on 11/16/2017 and conditional upon the
following requirements being completed and approved upon final inspection
Bldg Dept Req Docs Rcvd Requirements to be Completed By
11/132017 Received Hvac test and balance special inspection on foundation & steel construction waste receipts
Need Budding airtightness test
Engineering Final Requirements to be Completed By
11/1612017 TCO per Kim Keiswetter
Fire Authority Final Requirements to be Completed By 11/20/2017
11/06/2017 OK to move in furniture and equipment
WWW Irrigation Final Requirements to be Completed By 04/16/2018
11/162017 Hurr Landscape
Brinkman John 970-342-0129
Escrow received on landscape and imgaton
Zoning Final Requirements to be Completed By
11/15W17 TCO still need completed site and landscape
If such wor of completed within t time set forth above and approved on final inspection or unless the
time f complete n is,*xtende,$by tF�Building and Zoning Office an order to vacate the premises or a
iI. 1U.17
Date
f
Ill" 1171��
Authorized By Date of Issuance 11/16/2017
NOTE The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owner's name Construction power rates
maybe substantially higher than the rate to which the owner is entitled Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills
11/16Q017 01 1116 PM Page 1 of 2
Community Development & Neighborhood Services
281N College Ave
Fort Collins, CO 80522
970 221 676o 970 224 6134 -fax
violation notice for occupying the building structure or land without a Certificate of Occupancy will be
Issued Such violation Is subject to a maximum fine of $1000 00 per day for every day of violation
Contractor/Owner/Lessee Date
94-44 #04",.Ce
Authorized By Date of Issuance 11/16/2017
NOTE The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility senace in the owners name Construction power rates
maybe substantially higher than the rate to which the owner is entitled Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owners name utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills
11/16/2017 01 11 16 PM Page 2 of 2