Loading...
HomeMy WebLinkAbout3491 Stanford St - Special Inspections/Engineering - 03/26/2018RFI #680 THE WEITZ COMPANY, LLC 4725 S Monaco St. Suite #100 Denver, Colorado 80237 Phone: (303) 860-6600 r✓� Ibo i3o5, Project: D112060 -Foothills 344 E. Foothil ay Ft. Collins, redo 80 5 �. 7-&-cs Building 17 Breezeway Framing Penetrations TO: Benjamin Compton (JNS) FROM: Aaron Sarfaty (THE WEITZ COMPANY - ROCKY MOUNTAIN ) 4725 South Monaco Street, Suite 100 Denver, Colorado 80237 DATE INITIATED: 03/12/2018 STATUS: Closed LOCATION: DUE DATE: 03/19/2018 COST CODE: REFERENCE: COST IMPACT: SCHEDULE IMPACT. DRAWING NUMBER: SPEC SECTION: LINKED DRAWINGS: RECEIVED FROM: COPIES TO: v — Greg Atencio (THE WEITZ COMPANY - ROCKY MOUNTAIN ), Michael Boettcher (WEITZ COMPANY - SENIOR LIVING ), Mike Corbin (WEITZ COMPANY - SENIOR LIVING ), Kent Douglas (THE WEITZ COMPANY - ROCKY MOUNTAIN ), Ahmed El Kharbotly (THE WEITZ COMPANY - ROCKY MOUNTAIN ), Jason Greco (THE WEITZ COMPANY . ROCKY MOUNTAIN ), John Malanca (THE WEITZ COMPANY - ROCKY MOUNTAIN ), Adam Przeszlowski (MONROE NEWELL ENGINEERS INC), Aaron Sarfaty (THE WEITZ COMPANY -ROCKY MOUNTAIN), Shane Sleere (THE WEITZ COMPANY - ROCKY MOUNTAIN), Jesse Stockwell (THE WEITZ COMPANY - ROCKY MOUNTAIN) • • ROCKY MOUNTAINt 03/12/2018 Please reference S01.01A and attached photo. The attached photo shows a typical installation where SER cable is run through the breezeway ledger boards. Please confirm the attached photo does not represent a structural concern. If so, please provide fix Information. Attachments: FHMF - RFI #680 - Backup DoFpmentation.odf Official Response: Benjamin Compton (JNS) responded on Tuesday, March 20th, 2018 at 9:OOAM MDT JNS has reviewed. Proceed per direction of Structural Engineer's response. If a condition is discovered requiring the fix prescribed, provide thorough documentation showing the problem and the corrective measures taken. 'Contractor to review with Ownership for approval if this response results in any change to project cost and / or construction schedule impact. Attachments: Official Response: Adam Przeszlowski (MONROE NEWELL ENGINEERS INC) responded on Tuesday, March 20th, 2018 at 8:39AM MDT The cables installed mid depth of joists, away from supports are acceptable without repairs. If any joists exhibit cracking at the holes before finishes are installed, additional 2x6 framing will need to be sisterred to the top or bottom of any cracked joists above/ below the conduits, full length of the joists. Attachments: �(�� The Weitz Company Page 1 of 2 rm :.• r r:03 Pa