HomeMy WebLinkAbout812 Cherokee Dr - Disclosures/Mechanical - 02/01/2018City of Fort Collins Residential Mechanical Systems Performance Report
Updated 3/7/2014
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools
"Residential
City of
Fort Collins
and testing techniques, see the New Construction Mechanical Systems Testing Guide." The guide and
this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency; and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Tar et
g
Measured value
Other
or limit
to compare with
Pass
Fail
Caution
data
target or limit
As -built changes
mach design submi
Testingdate(s) 2/1/18
Bath exhaust
ADCF = Air Density Correction Factor, based on tool,
ADCF altitude (5000% air temperature through tool
Volumetric flow (CFM 5000) = ADCF x Indicated flow (CFM)
Testing tech (initials) nh
Flow x Flow box _ Pilot tube duct traverse Air temp
67
ADCF 1.095
tool _ Passive flow hood _ Other (note below) through tool (F)
Measured Airflow
Design
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
avow
(CFM 5000')
Flow
Flow
Pass
Fail
(CFM
+ Type of Operation
(CFM)
(CFM 50001
5000'
Master toilet
X 50 Intermittent _ 20 Continuous
49
54
R1
❑
Bath 2
X 50 Intermittent _ 20 Continuous
51
56
10
❑
Bath 2 toilet
X 50 Intermittent _ 20 Continuous
53
58
R]
❑
lower bath
X 50 Intermittent _ 20 Continuous
53
58
9
❑
laundry
X 50 Intermittent _20Continuous
49
54
R)
❑
50 Intermittent 20 Continuous
❑
❑
50 Intermittent 20 Continuous
❑
❑
Testing
notes
Kitchen exhaust N/A - hood does not vent to outside Testing tech (initials)=
Oven fuel X Gas _Electric Minimum airflow requirement (CFM 5000) + operation X 100 Intermittent _ 25 Continuous
Measured airflow
Flow = Flow box = Flow tube traverse Tool _Interior grille Air temp
_ Passive Flow hood _Flow grid Exhaust duct through [67 ADCF 1.095
tool Powered flow hood Other (note below) location (Exterior termination not OK) tool (F)
Indicated flow 347 CFM Volumetric flow 380 CFM 5000' 0 Pass II I', Fail
Testing
notes
Residential Mechanical Design Submittal V20140307 Page 1
Systems other than sub -structural floor exhaust
Code -minimum ventilation airflow, Design ventilation
53
(based on CFA and # of BR) CFM 5000' airflow, CFM 5000'
Target ventilation eirflow range 53 to 64 CFM 5000,
(code -minimum) (120%ol design Flow)
Testing tech (initials) nh
System X Exhaust -only
_Supply -only
type Balanced
Measured Airflow
Air Temp
Indicated
Volumetric
Measurement Method
Tool Location
Through
ADCF
Flow
Flow
Pass
Fail
Tool(F)
(CFM)
(CFM 50001
Total
N/A Passive flow hood
exhaust
_ _
X Flow box _ Pilot tube traverse
Master Bath
67
1.095
54
59
❑
airflow
Flow collar Other (note below)
Total
N/A Passive flow hood
supply
_ _
_ Flow box _ Pilot tube traverse
❑
❑
airflow
Flow collar Other (note below)
When supply eirflow is circulated by air handler fan, fan speed for measurement
_ Heating _ Cooling _ Continuous fan
Balanced airflow, in balanced systems
Average of measured CFM Target flow range to CFM �
supply + exhaust flows 5009 (average +/-15%) 5000, El Pal
ILIIFail
Substructural floor exhaust ® N/A— no substructural floor exhaust system Testing tech (initials) nh
Design exhaust airflow (based onCFM 5000' Target airflow limits to CFM 5000,
approved design) (design +/_ 15%)
Measured airflow
Flow box _ Pilot tube traverse Air temp
Flow — Passive flow hood _ Flow collar Tool through ADCF
tool _ Powered flow hood — Other (note below) location tool (F)
Indicated flow CFM Volumetric Flow CFM 5000' ❑ Pass F❑ Fail
Testing
WA — No ductwork Testing notes
No ductwork outside conditioned space (ind multoe eye)
Duct leakage Energy rater (name,
I ata source company, testing date)
House conditioned floor area asem2350
(Include full bent)
Test Parameter and Conditions
sf Air temp 53 ADCF 1.08
through tool (F)
Maximum Allowed Duct Leakage
Normalized Absolute
(CFM25 5000' / 100 sf) (CFM25 5000')
Measured Dud Leakage
Indicated Volumetric
(CFM25) (CFM25 5000')
System #1
SysRFall
Leakage Type
Timing
Air Handler
Pass
Fail
PasTotal
leakage
Rough -in
Excluded
3
❑
❑
❑
Total leakage
Rough -in
Included
4
94
66
71
❑
❑
❑
Total leakage
Complete
Included
4
❑
❑
❑
❑
Residential Mechanical Design Submittal V20140307 Page 2
For multiple systems, attach one page per system
System #a Which parts of house does it serve? Entire Home
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials) nh
Furnace or Boller
AC or Heat Pump Condenser
AC or Heat Pump Coll
Manufacturer
Amana
Amana
Alumacoil
Model#AMSS9606036NAA
ASX130241CG
CAPF363066DB
Basic fiberglass Electrostatic
Filter — — ThicknessR
MERV
brand Flanders Type —Basic pleated —Other:
High-effic pleated (inches)(optional) F I
Static pressures
Setup
Speed: _ Heating X Cooling — Cont. fan
High -stage for multi -stage equipment
Blower speed lap: hi
Humidifier damper: X N/A
— Open (Heating)
Closed (Cooling)
X All registers open
X Zone dampers open
SP1 ,17
AP Filter 09
(SP7 - SP2)
SP2 ,26
Testing tech (initials) nh
SP4.cation
OS fforor NS NSOP,
TFSOP)
AP Coil
(SP3-SP4) /
-., SP3 n0 hole
' �;
OP Total ESP
(SP3-SP2)
Cooling: Measured air flow through indoor coil ❑ N/A — no AC installed Testing tech (initials) nh
Design cooling airflow Target airflow limits
(high stage) 880 CFM 5000' (design +/-15%) 748 to Q Z CFM 5000'
Measured airflow
Flow grid X 14 Air tern Flow Resistance
plate size - 20 through 67 ADCF 1 ,Q95 NSOP 12,2 TFSOP 9,7 Correction Factor DG700
tool(F)
Measured airflow, no Indicated airflow Volumetric airflow CFM EJPass
adjustment/correction DG700 CFM Measured AF x FRCF 924 CFM Indlcated AF x nnCF I998
5000'
Fail
Heating: Gas manifold pressure
(high stage)
Testing tech (initials) nh
Manifold pressure 3 5 IWC
OEM 5000'
Target manifold P
limits +/- 5%)
3 2
to 3 7
IWC Measured 3 5 Pass
IWC❑
spec Q
(spec
pressure Fail
Heating: Temperature rise
Testing tech (initials) nh
OEM temperature rise limits 20 to cJ0 F
(high stage)
Supply 113
Measured temps (F): air
Return
— air 67
_ Temp(��11
rise 46
Caution: within 10F
Pass Fail Cof top of range
Residential Mechanical Design Submittal V20140307 Page 3
u
Testing tech (initials)
Testing approach and targets
❑ N/A: No complete AC system 8 N/A: House completed November - April (Installing wntrecter responsible ter testing In warm weather)
❑ TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -spade: Approach ❑ Other OEM -specific (documentation required)
Temperatures Condenser Non-TXV: bReturn
tamp Target Target
Target Target
=
(F): entering eir temp air wet -bulb temp superheat subcooling approach
Subcooling
Discha aCondenser Liquid
Actual ❑ TXV Pass: Actual SC within +/-
rA q
pressuresaturation TF-1 F line F subcooling F 3 F of target SC, 2 F min
(PSI)F](5atm duet) tamp (CondT-IlgAne1) UTXVFail
Superheat
Suction Evaporator Suction Actual ❑ Non-TXV Pass: Actual SH
pressure saturation T F line F superheat F within +/- 5 F of target SH
(PSI) (5eoa eha t) tamp (Suet One T - wap T) U Non-TXV Fail
TXV checks: ❑ Pass: Field -installed TXV Installed in accordance with OEM instructions IQ Caution: Actual SH outside mfgr range
Approach
Liquid Imp Actual approacherEAT) F ❑ Approach Pass: Actual approach within +/-1 F of target approach
temp (Uq One T- condenser EAT) roach Fail
�,APP
Register air flows
All registers are cut through finish materials and moving air 0 Pass FP -Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance
Testing tech (initials) nh
Testing tech (initials) nh
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pass
Fail
Master
-3to+3
2.5
❑
West Bed
-3 to +3
0.9
❑
East Bed
-3 to +3
0.6
0
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
Residential Mechanical Design Submittal V20140307 Page 4
r
® Combustion safety testing N/A — no natural -draft combustion appliances
(Appliance Types table must be completed for every home)
Appliance types
Testing tech (initials) nh
Appliance
Combustion T
N/A
Draft -hood
Natural -draft
Induced -draft
Natural -draft
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
El
❑
El
El
0
El
Furnace #2
El
El
❑
El
El
El
Boiler #1
El
El
❑
❑
El
Boiler #2
❑
El
❑
❑
❑
❑
Water heater #1
❑
❑
❑
❑
❑
0
❑
Water heater #2
❑
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
❑
Other.
❑
❑
❑
❑
❑
❑
❑
Worst -case depressurization performance
# of bath fans on
_ Vented range hood on
Clothes dryer on
_ Air handler on
Other fans on:
Outdoor temperature= F
CAZ pressure
doors are closed:
setup notes:
BPI depressurization limit
(Pa wrt outside)
Measured net CAZ depressurization
(Pa wrt outside)
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit
(seconds
Measured spillage duration
(seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit
(Pa wrt CAZ
Measured
(Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit
(ppm
Measured CO
(ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
❑ OK ❑ Caution ❑ OK I ❑ I Caution ❑ OK ❑ Caution
60
60
60
0
jPass 1
❑ Fail
❑
Pass
❑ Fail
❑
Pass I
❑ Fail
❑ Pass I ❑ Fail ❑ 1 Pass I ❑ I Fail ❑ Pass ❑ Fail
100
100
100
0
jPass I ❑ Fail
0
JPass I ❑ Fail
0
Pass I ❑ Fail
❑
Caution
❑
Caution
❑
Caution
Residential Mechanical Design Submittal
V20140307
Page 5
9 SSystem Controls
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
N/A
0
Pass
❑
Fail
Whole -house ventilation
❑
N/A
0
Pass
❑
Fail
Sub -structural floor exhaust
0
N/A
❑
Pass
❑
Fail
Heating (all systems)
❑
N/A
0
Pass
❑
Fail
Cooling (all systems)
❑
N/A
0
Pass
❑
Fail
Signatures
Testing tech (initials) nh
Testing Notes
Technician #1 performing Inspection and testing documented on this report (Approved Agency)
1 certify that the tests referenced above, In sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
� Name (print) Nick Hiseler
Site Services Technician
GS Services
Nick
..,.
Hiseler 7o,,.m„ouo sr rC
Title
Company
Signature and Date
Technician 02 performing Inspection and testing documented on this report (Approved Agency)
11 certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
i
Na
Signature
HVAC Contractor (City of Fort Collins license holder)
I certify that I have reviewed this report and that the lest results are an accurate representation of the performance of the installed mechanical
systems.
Na
1 Signature
Residential Mechanical Design Submittal V20140307 Page 6