Loading...
HomeMy WebLinkAbout2400 Coventry Ct - Correspondence/Solar - 12/05/2016i r (EiVI_i _S� - - -3 1R, :U-q r December 5, 2016 To: Ecomark Solar 4665 Paris St. g300-C Denver, CO.80239 Subject: Certification Letter Palmer Residence 2400 Coventry Ct. Ft. Collins, CO. 80526 To Whom It May Concern, Domus Structural Engineering, LLC 1210 Birch Street Broomfield, CO 80020 303-466-3014 Domusstructural@gmaii.com by John _._5 09.0556 -0Too' A jobsite observation of the condition of the existing framing system was performed by an audit team of Ecomark Solar as a request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review only applys to the section of the roof that is directly supporting the solar PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to notify engineer prior to starting construction. The roof structure of (All MP's) consists of composition shingle on roof plywood that is supported by pre -manufactured trusses that are spaced at @ 24"o.c.. The top chords, sloped at 27 degrees, are 2x4 sections, the bottom chords are 2x4 sections and the web members are 2x4 sections. The truss members are connected by steel gusset plates. The max unsupported projected horizontal top chord span is approximately 7'-4". The existing roof framing system of (All MP's) are judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The spacing of the solar standoffs should be kept at 72" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered pattern to ensure proper distribution of loads. Design Criteria: • Applicable Codes = 2012 IBC/IRC, ASCE 7-10, and NDS-12 • Roof Dead Load = 7 psf (All MP's) • Roof Live Load = 20 psf • Wind Speed = 130 mph, Exposure C, Risk Category II • Roof Snow Load = 30 psf • Attachments: (1) 5/16" dia lag screw with 2.25" min embedment depth, at spacing shown above. Please contact me with any further questions or concerns regarding this project. Sincerely, John Calvert, P.E. Project Engineer 61701346 Palmer Residence, Ft. Collins, CO 1 6" T H U 0 T 1) R A 1' 1:5NG t N I P RJ Nc n I'C Gravity Loading PV System Weight Domus Structural Engineering LLC 1210 Birch Street Broomfield CO 80020 303 466 3014 Domusstructural@gmail com Weight of PV System (Per Eoomark Solar) 3 0 psf X Standoff Spacing = 4 00 ft Y Standoff Spacing = 2 67 ft Standoff Tributary Area = 10 68 sft Point Loads of Standoffs 32 lb Note PV standoffs are staggered to ensure proper distribution of loading Roof Live Load = 20 psf Note Roof live load is removed in area s covered by PV array Roof Dead Load (All MP s) Composition Shingle 400 Roof Plywood 200 2x4 Top Chords @ 24 o c 073 Vaulted Ceding 000 Miscellaneous 027 Total Roof DL (All MP s) 7 0 psf DL Adjusted to 27 Degree Slope 7 9 psf (Ceding Not Vaulted) B1701346 Palmer Residence Ft Collins CO 1 ID o n� i1 ti Domus Structurel Engmeenng LLC �c 1210 Birch Street �d7 T R U C' T [,I K A I� Broomfield CO 80020 =�.�-,� n G 1 1 1 1 It ,I N C, 1 I�(' 303 466 3014 Y Domusstructural@gmad com W�nd Calculations Per ASCE 7-30 Components and Cladding , Input Vanables - � in pee mp Exposure Category C Roof Shape GablelHip Roof Slope 27 degrees Mean Roof Height 20 ft Effective Wind Area 19 3 ft ( — Design Wmd Pressure Calculahons - - - - i m ressure =q n qh=0 00256'Kz'Kzt`Kd'V^2 (Eq 30 3 1) Kz(Exposure Coeffiaent)= 0 9 (Table 30 31) Kzt(topographic factor)= 1 (Fig 26 8 1) Kd(Wmd Direchonality Factor)= 0 85 (Table 26 61) V(Design Wind Speed)= 130 mph (Fig 26 51A) Risk Category= II (Table 1 51) qh= 3310 O6*qh= 1986 � Standoff Uphft Calculahons PoRrait , one one one osi ive GCp= -0 86 1 51 2 37 0 42 (Fig 30 4 1) Uplrft Pressure= 1712 psf 29 99 psf -0710 psf 14 0 psf X Standoff Spaang= 4 00 4 00 2 67 Y Standoff Spaang= 2 67 2 67 2 67 Tnbutary Area= 10 68 10 68 712 Footmg Uplift= 1831b 3201b 3351b i Standoff Uphft Calculations Landscape one one one ositive GCp= -0 S6 1 51 2 37 0 42 (Fig 30 4 1) Uplift Pressure= 1712 psf 29 99 psf �710 psf 10 0 psf (Mirnmum) X Standoff Spaang= 6 00 6 00 4 00 Y Standoff Spacing= 1 67 1 67 1 67 Tnbutary Area= 10 02 10 02 6 68 FootingUplift= 1721b 3001b 3151b , Standoff Uplift Check aximum esign p i = Standoff Uplift Capacity = 400 Ib 400 Ib capaaty>335 Ib demand Therefore OK Fastener Capacity Check as ener= ia ag , .. �Number of Fasteners= 1 �� �+, � � t ; � " �y r g Embedment Depth=2 25 ' Pullout Capaaty Per Inch= 250 Ib Fastener Capaaty= 563 Ib w/F S of 1 5= 376 Ib 376 Ib capaaty>335 Ib demand Therefore,OK Palmer Residence Ft Collins CO 2