Warranty Track
1. Notice of Avrarcl NOA).r ROOFING INSPECTION
2" Acceptance of NOA (ANOA) V
3. Field Installation Reporter FOR WARRANTY REPORT Samar/'
4. Inspection for Warranty Report
S. Warranty
BUILDING TRUST
Project Name
(As it Appears on ANOAI: Anheuser-Busch Buildings 5 A,B and C building 4, A. Date: Wednesday, Februe
Address: 2351 Busch Drive ZZ, Project No.: 0000028688
City: Fort Collins
State: CO Region: Mountain
Applicator: B&M Roofing City/State: Fredrick/Co
Original Inspection?: ®Yes ❑No - (Date of Previous Inspections)
System:
Sikacoat Dry Mils Thickness (Note: 1 test per 3 squares):
General Punch List Items: 2 man crew onsite during Inspection.
Sika Corporation Representative: Daniel Brown Applicator Representative: Kerry Schmitt
ROOFING INSPECTION
® Sarnafi/® FOR WARRANTY REPORT
Project No.: 0000028688 Date: Wednesday, February 15, 2017
Accepted For Warranty:
❑ Yes - Warranty start date will be today's date.
❑ No - Re -Inspection required — Major punch list items_.
Make corrections then call for re -inspection - Phone No.: 303-817-9946
® Yes - With minor punch list items — See below.
Sign below and return to Sika Corporation Regional Office when punch list is complete - Fax No.: 801-355-4407
I CERTIFY THAT THE PUNCH LIST ITEMS SHOWN ABOVE HAVE BEEN CORRECTED AS REQUIRED BY SIKA SARNAFIL
Date: 3 1 2tt [1-1 %( ,�( (this will
-b-e.the warranty start date)
Name: rrS f 1l� Signature:
H per uiem cnarge plus expenses may be charged whenever inspections subsequent to the original are required. * *
2017
Areas marked in blue need to be corrected.
1. Starts and stops of machine welds.
2. Insufficient welds at base of pipes.
3. Scuff marks left by the automatic welder
4. Inside corners need to be corrected due to light welds and voids.
Most of the items found during final inspection can be avoided by doing these things daily.
(1) Finish your details daily, you eliminate the possibility of welding contaminated dirty or wet membrane.
(2) Probe your seams daily; don't put it off until the project is done. By waiting, the seams never get the attention they would by doing them
the same day, resulting in items getting missed, like seam voids