HomeMy WebLinkAbout750 Jerome St - Special Inspections/Engineering - 05/26/2016May 26, 2016 tENGINEERING
Project No: 2873-01-15
Tikchik LLC
238 Cajetan Street
Fort Collins, Colorado 80524
Attn: Jesse and Amy Laner
Re: Lots G-1 to G-6, Block 5, Old Town North; Fort Collins, Colorado
750 Jerome Street — Detached Garages a4eo
¢ /# S
Bldg. Permit #Is B1508508 / B1508510 / B1508512 / B1508521 / B1508524 / B1508543
Dear Mr. and Mrs. Laner,
Excavation observations were completed by Soilogic, Inc. during the period of Tuesday, May 3,
2016 to Saturday, May 7, 2016. It is our understanding that during these observations, Soilogic,
Inc. directed the excavation to extend through all undocumented near -surface fill material and as
a result, the excavation was deeper than anticipated, requiring taller foundation walls. In lieu of
installing taller foundation walls, the contractor decided to place approved, compacted backfill
material in order to raise the elevation of the excavation. Testing of the overexcavation/backfill
materials was also completed by Soilogic, Inc. during the above referenced period. A residential
site observations report summarizing the observations and testing results was prepared by
Soilogic, Inc., titled "Residential Site Observations Report; Lots M1 — M6 and GI — G6, Block
5, Old Town North Subdivision; Jerome Street, Fort Collins, Colorado"; Soilogic Project # 15-
1216; report dated May 18, 2016. Allowable soil bearing capacities noted include a maximum
net allowable soil bearing pressure of 1,500 pounds per square foot (dead load plus full live
load), and a minimum dead load pressure of 500 pounds per square foot. The above referenced
residential site observations report by Soilogic, Inc. has been attached for immediate reference.
These lots are suitable for a spread footing foundation system. The foundation plan for the
proposed detached garages prepared by Shear Engineering Corporation dated December 2015
was used. Footings were designed for a maximum allowable bearing capacity of 1,500 pounds
per square foot (dead load plus full live load) and a minimum dead load of 500 pounds per
square foot according to the recommendations of the site -specific geotechnical exploration report
prepared by Soilogic, Inc. titled "Geotechnical Subsurface Exploration Report; Lots M1 - M6
and G1 - G6, Old Town North Subdivision; Jerome Street; Fort Collins, Colorado'; Soilogic
Project #15-1216; report dated September 9, 2015.
Shear Engineering Corporation was present on Wednesday, May 18, 2016 and Thursday, May
19, 2016 for fi2gtjpg formwork and footing reinforcing placement observations. Shear
Engineering Corporation was present on Wednesday, May 25, 2016 for foundation wall
reinforcing placement observations. These observations were made to confum that footing
formwork and reinforcing placement and foundation wall reinforcing placement were completed
in substantial compliance with the direction, details and specifications noted on the foundation
plan and with modifications approved by Shear Engineering Corporation during construction.
9 N A R, 17 3*05FP1
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com
PAGE 2
May 26, 2016
Project No: 2873-01-15
Re: Lots G1— G6, Block 5, Old Town North; Fort Collins, Colorado
750 Jerome Street —Detached Garages ✓
Bldg. Permit #'s B1508508 / B1508510 / B1508512 / B1508521 / B1508524 / B1508543
All footing formwork and footing reinforcing placement and foundation wall reinforcing
placement was completed in substantial compliance with the direction, details and specifications
noted on the foundation plan and with modifications approved by Shear Engineering Corporation
during construction.
During footing formwork and footing reinforcing placement observations, Shear Engineering
Corporation noted that the detached garage footings are being installed in two separate pours.
The first footing pour, on Wednesday, May 18, 2016 consisted of the rear detached garage
footings only. The rear detached garage footings were formed to be twelve inches (12") thicker
than specified on the plans (i.e. 20" thick vs. 8" thick). This is so the concrete contractor can use
three foot (3') tall wall forms at the rear foundation wall. Due to site limitations and access
issues, three foot (3') tall wall forms must be used at the rear foundation wall otherwise the
exterior wall form would have to be abandoned in place. Shear Engineering Corporation directed
the installation of additional rebar extending from the rear footing forms so that the second
footing pour is sufficiently tied to the first footing pour. The second footing pour, on Thursday,
May 19, 2016, consisted of the remainder of the detached garage footings. The remainder of the
detached garage footings installed with the second pour were installed per plan.
During footing formwork and footing reinforcing placement observations, Shear Engineering
Corporation verified that Ufer ground rods were sufficiently tied to the strip footing
reinforcement mats and extend vertically to meet generally accepted Ufer ground installation
requirements. The Ufer ground rods placed with footing reinforcement meet generally accepted
Ufer ground installation requirements.
If you have any questions concerning our observations, please call us at (970) 226-5334
Sincerely,
Brian A. Bruckbauer, P.E.
Shear Engineering Corporation
BAB / bws
attachment
INDU
ZJ Oct,
aRG�s�,
O
Z 50077
cc: City of Fort Collins Building Department
Dave Phillips; Philgreen Construction, Inc.