Loading...
HomeMy WebLinkAbout2239 Joseph Allen Dr - Disclosures/Mechanical - 09/09/2016E 1�0 aqq/ �,q-1-010 City of Fort Collins Residential Mechanical Systems Performance Report updated 3nn014 This forth is a record of testing targets and results, with PassXsil Oukumes. For information on measurement tools CC and testing techniques, sea Ore "Residential New Construction Mechanical Systems Testing Guide." The guideand� ,,..,, 7 ins this form may be periodically updated; dhedt the Building Services web she for the anent version aeon. This form must be completed and signed by an'Approved Agency," and submitted to Building Services as a requitement for receiving a C.O. Color key Tepet Measured value i " ; ; Other or limit to oompare, with Pass A I date dataor Omit w. JADCF = Air Density Correction Fader, based on tool. ADCF altitude (5000% air temperature through tool Volumetric flow (CFM 500(Y) = ADCF x Indicated flow (CFM) 1. 1-101.1se Data Address '7 C/ // r Date of "Residential d� / Mechanical Systems Builder Design Submittal'e // ithfomhetion referenced HVAC contractor tJ?� by testing tecMinians As-buih dargea mach design submil Testing date(s) Local• Bath exhaust Testing tech (inlliets)="� FbwUZFlowbox Ptta tube dud traverse Air tamp toe _ Passive now hood _ Other (note below) through tool (F)� ADCF Measured Airflow O0sign MinimumAiAbwRequimment Indicated Volumetric Exhaust Pickup Loeatiori kilo (CFM (CFM 6000') Flow Flow Type of Oparadon (CFM) (CFM 500(n 20 ContinuareJ—O ✓50 hdo., ft t 20 Continuous D 11 _ 50 trdernittsnt _ 20 ContinuousC2 jo Ira _ 501;e mittem _ 20 Continuous %60trdermittent 20 Coredrama 60 trdertnittent 20 Continwus50 trdemittent 20 Continuous Testing ) ✓0 �q/rrel6� notes P I r n/ i_ 1 Kitchen exhaust WA - hood does not vent to outside11 Testing tech (6nitials)MZ Oven fuel Gas14fiectric Minimum airflow requirement (CFM 50001 + operationj — Q Intermitlenl 25 Cartlnuous Measured airflow F Flow box _ Pas" Raw hood _Fbvgrid Pilot bibs traverse Tcol grate uffiduct Air tamp through �/ ADCF / f001_powered Dow hood (note below) rot OK) too[(F) I _Other indicated flowl�7 CFM Volumetric fbw�3 CFM 5O0' ass ,Fail Testing notes Ix Residential Mechanical Design Submittal V20140307 Page 1 3. Whole -House Ventilation Systems other than sub -structural floor exhaust Testing tech (initials) Code•m nimum ventilation ai CFM 5000 Design ventilation CFM 5000' (based on CFA and # of SR) airflav® System — u -only type _ Supply-0nly 6aiTarget ventilation aiAbw range to Y CFM5000' —Balanced (mEsmwmun) (120%ot seeks �l Alr Temp Indicated Volumetric MeasurementMethod Tool Location Through ADCF Flow Flow Pass Fail Tool (F) (CFM) (CFM 8000') a Total y ✓F]ow box — � brie — �o!✓✓! ;KO i airflow _ Flow collar Other (tote belwu) i y Total NIA Passive lbw hood supply _ _ — Flow box _ Pilot tuts traverse ❑ airflow Flow collar Ocher (rote below) When supply ahfbw is circulated by air handler tan, fan speed for messurement_ Heaflrg Cooling Ccnl:,Zous fan Balanced airflow in balanced systems Average of measured CFM + flows 5000' Target flow range ((aver/age +H 15%1 m t CFM 5000' ❑ Pass 'Fail supply exhaust Testing ,,// / �NY! T"'y �Y Gpl► �. �%ItS pEsGGi1�d�Gf� ',? G Sub -structural floor exhaust 21WA -- no substructural floor exhaust system Testing tech (in WIs)® Design exhaust airflow (based on Target airflow limits approved design) CFM 5000' (design +l-15%) to CFM 5000' Measured airflow Flaw box _ Ptulle traverse Air temp F — Pilot tube Nlocation ow hood _ Flow collar Tthrong ADCF tool _ Powered Now hood _ OMer (note below) locaon tool (F) Indicated flow CFM Volumetric flow CFM 5000' ❑ Pass t Fail W _ dueh�oh Teatlng notes , o ducMork outside acnditioned apace (rnd mduple m) Duct leakage Energy rater (creme, _ data source company, We" date): House conditioned floor area Air tamp ADCF pncwetuibsm")� though toal(F) Residential Mechanical Design Submittal V20140307 Page 2 Cooling For multiple systems. attach one page per system systems® Which parts of house does it serve? Installed equipment (Be dear about which AC components are installed at time of testing) Testing tech (Initials) Furnace or Boller AC or Heat Pump Condenser I AC or Heat Pump Coil Manufacture ^f Mosel q/aS OS/ d,411 o G 3 oz Flier brand Vie Static pressures Setup Speed: _ Heating _Cooling _ Corti. (an _ Hlgh-slage for muefstage equipment lower speed tap: umidifier damper. _ WA Open (Hedng) registers open ///_///Zone dampers open Owed __�[j SP1 AP Filter lsPf- spat ` SP2 Thitlmess MERVz (inches)V] (optional) Testing tech (initials)= (Same acM.wn for NSOP. TFSOP) Cooling: Measured air flow through Indoor coil ❑ WA -- no AC installed Testing tech (init ale) Design cooling Mon .awl / (�� CFM5DW la(deheimow n+/-15 )I (design +/-15% U!� m /,!7 D (j b ICFM5000' Measured airflow Air tam Flow grltl ^4 p /� i{ fire she 7 p through® ADCF �O[ NSOP 7� tool(F) Flow Reshce TFSOP 7/6Correction Factor �L Measured allow. no �4/�'� OFM Indicated a1rf1 W CFM adjustment1correction (/ "' NIMSN dAF:= � CFM Pass Volumetric eireowRil trhemtndAFcADCF5000' .Fall Testing Fr, l� s 131,M 004 edc, 947 �� 1 notes Crt 1 SvV- jr Heating: Gas manHold pressure lmga.lasat Testing tech (initials)® Manifold pressure ure OEM spec 5000' �•� Target manifold P 33 ! IWC limits (Spec 5%) ✓ 7 Measured ❑ Pass IWC IWC pressure r� .Fell Heating: Temperature rise Testing tech (nitlals)� OEM temperature rise limits 7r m J F (rich"O Measured temps (F): Supply — Retua"L.!!_L = T nse WJ LdPass EA 'Fail ❑ oft P� o age 10F Residential Mechanical Design Submittal V20140307 - Page 3 Testing tech Testing approach and targets ❑ NIA No complete AC system ❑ NIA House completed November - April (rutsmq am naor rmpongble for wtip in wam weesw() ❑ TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM-specifia Approach ❑ Other OEM-specific(docursentawn mquhM Targe Targat Temperatures enterkhgairtempens© air wetwet-bulb superheattFI sub000ling� approacth� Subcoaing Discharge CondenserKW L' is Actual ❑ TXV Pass: Actual SC within 4- pressure saturation TF G 76 F stdxoding O F 3 F of target SC, 2 Frain (PSq (sooamsrqtemp v (CmdT-ipanen MTXVFad Superheat Suction I Evaporator Suct `L Actual ❑ Non-TXV Pass: Actual SH pressure �riTf saturation T�F line 7 7 F superheat ?F ■within +I- 5 F of target SH PSI 11 (soar cnmV to C (Swr ino r - WaP T) Non-TXV Fag TXV dredcs: ❑ Pass: Field4nstalled TXV installed in accordance with OEM instructions ❑ Caution Actual SH otdside mfgr range Approach Liquid line�F Actual approach�F ❑ Approach Pass: Actual approach within +I- 1 F of target approach temp (Lrq ens T'-rmrrduaer EAT) ■Approach Fail TestingA V ��/f'YC S G�V'�' � O ' notes 'fa: a, pr i s� Register air Bowe Testing tech All registers are cot through finish materials and moving air Pass .Fail (Remainder of register air now soction under dovelopment, not yet being enforced) Pressure balance Testing tech (initials)M Roam (match names on plans, include basement if there is a door) Roan -to -Core Pressure Drop Target Range (Pa) Measured Pressure Drop (Pa) Pass Fall 3to+3 `( 3 to +3 , 7-3to+3 , Idd 3 -3to+3 -3 to +3 , 02 -3 to +3 ❑ -3 to +3 ❑ -3 to +3 ❑ -3 to +3 ❑ -3 to +3 ❑ Residential Machartical Design Submittal V20140307 Page 4 �ambrstion safety testing WA - no natural -draft combustion appliances Tasting tech (Wtiels) J� (Appliance Types table must be completed for every home) Appliance types Appliance Combustion Tpe WA Draft -hood yuryl-drafl UMuceddraft Power- vent Direct- vent Powered sealed- combustion Electric Furnace fit ❑ ❑ ❑ ❑ ❑ ❑ ❑ Furnace 92 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Boiler #1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Boller fix ❑ ❑ ❑ ❑ ❑ ❑ ❑ Water heater #1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Water heater #2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Fireplace #1 01 ❑ ❑ ❑ ❑ ❑ ❑ Replace #2 ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ Other. ❑ ❑ ❑ ❑ ❑ ❑ ❑ Worst -case depressurlution performance # of bath fans on Vented range hood on CWtlms dryer on Air handler on r fens on: Outdoor temperature=F CAZ pressure BPI depressurization limit (Pa wn outside) Measured net CAZ depressurization (Pa wn outside) OK (less negative) l Caution (more negative) Spillage BPI madmum Emit (seconds) Measured spillage durstion (seconds) Pass - duration not exceeding lime 60 60 60 ❑ Pa99 Fad ❑ pm. Fail ❑ Pea9 F811 Draft pressure BPI Emit (Ps rat CAZ) Measured (Pa wn CAZ) Paso - pressure more negative Men Ihnil ❑ Pass Fail ❑ Pass =Fag I ❑ 11sass =Fall CO concentration in undiWted flue gas BPI nwdmum Emit (ppm) 100 100 100 Measured CO (ppm) Pass = CO level rat exceeding Emit ❑ 1pass Fall ❑ Pass Fad ❑ Pass Fall Caution = CO level 25 to 100 ppm � "' Caution r Caution1,�-,n-jcautlon Resldenbal Mechanical Design Submittal V20140307 Page 5 system Controls Operating Per Design Intent Local exhaust (all fare) ❑ WA Whole-house ventilation ❑ WA Sub•shucturalit=exhaust WA ❑ jPassFad Heating (all systems) ❑ WA Cooling (ell systems) ❑ WA Technician 01 performing Inspection and testing documented on this report (Approved Agency) Testing tech Testing Notes I certify that the tests referenced above, In sections bearing my htitials, were performed in accordance with protocols apefified by the City of Fort Collins Building Services Department, and that the feWrted results are accurate to the best of my knowledge. Na, c. Signature Technician 02 performing Inspection and testing documented on this report (Approved Agency) I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protooDls specified by the ° i City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Na .i Signature HVAC Contractor (City of Fort Collins license holder) .. I certify that I have reviewed this report and that the test results we an accurate representation of the performance of the installed mechanical systems. i :: Na 'i Signature Residential Merhardcai Design Submittal V20140307 Page 6