Loading...
HomeMy WebLinkAbout6327 Fall Harvest Way - Special Inspections/Engineering - 01/30/2017 (2)IIII I NC O R P O R A T E D January 30, 2017 Toll Brothers, Inc. 10 Inverness Drive East, Suite 125 Englewood, CO 80112 Attention: Mr. Jon Hull - Construction Manager Subject: Basement Mono -Posts Lot 5, Block 25, Kechter Farm, Filing 2 Toll Lot 38, Estates 6327 Fall Harvest Way Fort Collins, Colorado Project No.: DN46390.127 As requested, we reviewed the structural plans for the referenced site (Project No. DN46390.127, dated August 26, 2016) to provide an opinion about the alignment of the mono -posts in the basement. In the basement, it is our understanding that some of the mono -posts are off center of the steel beams by up to about % inch. Provided that the columns are in a plumb condition, it is our opinion that the columns are still adequate to support the anticipated loads. Thank you for selecting CTLIThompson for your engineering needs. When we can be of further service, please contact us. Sincerely, CTL THOMPSO "0' '- �a, Justin A. Doleza ; Structural Project an�gerX� �vF,i_E �.G JAD via e-mail: ihull(cDtollbrothersinc.com 1971 West 121h Avenue I Denver, Colorado 80204 1 Telephone: 303.825-0777 Fax: 303-825-4252