Loading...
HomeMy WebLinkAbout2415 Palomino Dr - Special Inspections/Engineering - 07/01/2016A.G. enaar Geotechnical and Environmental Consultants D R Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 2415 Palomino Drive Lot 9, Block 2 Bucking Horse, Filing 2 Project Number 131274 Reference: A.G. Wassenaar Report Project Number 131274, Dated 8/26/2014 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax303-756-2920 July 01, 2016 www.agwassenaar.com As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that the observed portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 03/14/16 Excavation and Pier Observation (100%) 03/16/16 Excavation and Pier Observation (100%) 03/17/16 Deck and/or Patio Pier Observation 03/17/16 Excavation and Pier Observation (100%) 04/15/16 Foundation Wall Reinforcing Steel Observation 04/22/16 Community Underdrain Extension Observation 04/22/16 Damp -Proofing Observation 04/22/16 Foundation Void Observation 05/20/16 Crawl Space Observation 05/20/16 Perimeter Drain Observation 05/24/16 Perimeter Drain Observation Sincerely, A. G. WASSENAAR, INC. Kenneth R. Broseghini, P.E. Senior Engineer