HomeMy WebLinkAbout2415 Palomino Dr - Special Inspections/Engineering - 07/01/2016A.G.
enaar
Geotechnical and Environmental Consultants
D R Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 2415 Palomino Drive
Lot 9, Block 2
Bucking Horse, Filing 2
Project Number 131274
Reference: A.G. Wassenaar Report
Project Number 131274, Dated 8/26/2014
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax303-756-2920
July 01, 2016
www.agwassenaar.com
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that the observed portions of the foundation system were found to
be in substantial conformance with the foundation plan and requirements of the soil report for the
subject site. Observations were conducted on a periodic, on -call basis.
Date:
Observation:
03/14/16
Excavation and Pier Observation (100%)
03/16/16
Excavation and Pier Observation (100%)
03/17/16
Deck and/or Patio Pier Observation
03/17/16
Excavation and Pier Observation (100%)
04/15/16
Foundation Wall Reinforcing Steel Observation
04/22/16
Community Underdrain Extension Observation
04/22/16
Damp -Proofing Observation
04/22/16
Foundation Void Observation
05/20/16
Crawl Space Observation
05/20/16
Perimeter Drain Observation
05/24/16
Perimeter Drain Observation
Sincerely,
A. G. WASSENAAR, INC.
Kenneth R. Broseghini, P.E.
Senior Engineer