Loading...
HomeMy WebLinkAbout1408 S Shields St - Correspondence/Plans Approval - 11/30/2016O'EX Of Community Development & Neighborhood Services �®rt Collins 281 N. College Ave. Fort Collins, CO 80522; Voice: 970-221-6760 FAX: 970-224-6134 CONSTRUCTION WASTE MANAGEMENT PLAN and DOCUMENTATION Note: Environmental Services staff is able to assist with questions about getting a recycle program implemented, and will also provide education and site visits upon request (call Caroline Mitchell at (970) 221-6288). Address Permit No General Contractor & Contact Info: Material Vendor hauling the materia12 Facility recycling the material3 Total volume or weight of materia14 Concrete/Masonry rZ �� �C�� Wood/Lumber Metals Cardboard Trash N/A Other (describe) (J n dJ e.312 `� 9A �e ��, 41 Required Documentation4: Provide signed documentation from the hauling company that the volumes & weights listed above are accurate. If you hauled the materials yourself, attach tickets from locations receiving the recyclables. Documentation is required in order to receive final project approval from the CitV. I and my Ci -licensed hauler certify that the above materials from my construction site were recycled in the volume eight describe nd were taken to the facilities described. Si nature (Contractor or Owner) Date Signature (Licensed Hauler) Date 'At minimum, the four listed materials must be recycled. 2 Enter vendor name and phone number. If the applicant will haul the material themselves, state such. 3 Where will applicant or vendor take the material for recycling? Enter facility name and address. 4 To be completed at the end of the project. Please re -submit this form at end of project with these sections completed. Rev 1/15/14