Loading...
HomeMy WebLinkAbout230 N Loomis Ave - Applications/Electrical - 10/07/2019of 281Planning, Development & Transportation Fort Collins For N. College Ave P.O. Box 580 Fort Collins, CO 80524 Phone 970-41616-2740 Fax 224-6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air ConditioningA Electrical Alteration ❑ Gas Lighter ElGas Log ❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Sewer Line ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). C2L°`t Complete all applicabble�infor itiion N n thhee'application. PPA lication # ) ✓ 7 � ) For olfice use only Incomplete applications will not be accepted. Date 10 1-7 1 \ c� Job Site Address (required) Value of Construction (labor, materials, profiit)18oV•°'0 a30 Q- Loomis Property Owner Name Address City/State Zip Phone ke-• i Wa NnQ r 23o 4�i. Lod*hiS rL Co 530SIA -M3112-sei 11 - Applicant Name Address City/State Zip Phone I C' . 0.,�.� 2-2 2.0 �rc.n FlYl RJR �C-co 205Z�t p 7c,-SV-H05-7 Contractor Address City/State Zip Phone L6LV0,io ElecFric Sow as a Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report?Here ❑ Report Sales tax number is required by all contractors Are you paying with your trust account? ❑ Yes 32�No Is this a residential or c mmercial project? Residential ❑ Commercial If residential, is it: 1SSingle Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex ❑ Multifamily (apartment) ❑ Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building 50 years of age or more? ❑ Yes ❑ No If yes, you mayneed to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? Description of work SC-rUL c,e- WAln i50 avnV rno fr. ,man CDw � � 4-1. <ann HA *If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electrician Plumber Mechanical Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Applicant: Print Name: 1,4 La'L Signature Date I' I `1 It