Temporary Certificate of Occupancy
Permit #: B1601313
Work Description: NEW 3 STORY, 22,366 SQ FT, 18 UNIT MULTI- FAMILY BUILDING. CITY WATER. ENERGY
COMPLIANCE: COMCHECK. JOB CONTACT: GREGORY PAVLICH 303-860-6660.
This is to certify that the building, structure, or land located at 3331 STANFORD RD Fort Collins, CO has been
inspected and temporary occupancy is hereby authorized, effective on 01/26/2018 and conditional upon the
following requirements being completed and approved upon final inspection.
Bldg Dept Req Docs Rcvd Requirements to be Completed By:
01262018 Received and approved: Foundation/Footing/Formwork Engineers Letter, Pre/Post Tension Slab Engineers Letter,
Welding/Bolting Engineers Letter; Mechanical'System Test Report (1 per dwelling unit); Multifamily Blower Door Test Report
(20% of units = 4 units min). The following documents are still required prior to CO: Final Construction Waste Recycling Form
with Receipts.
Fire Authority Final Requirements to be Cor' mpleted By:, 01/31/2018
01242018 Finish up sprinkler issues.,.
WWW Irrigation Final Re uirements to be Corn Ieted4B� : 04/16/20.,4�'
g i_ q P y
11/142017 AaronSa`rtatyFoothillsjobsite
C303.912.0187Eaamn.sarfaty@weftz.com
Zoning Final Requirements -to. be Completed By:
If such work is not completed within the time set forth above and approved on final inspection, or unless the
time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a
violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be
issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation.
Contractor/Owner/Lessee Date
Ac-� yvv�
Authorized By: Date of Issuance: 01/26/2018
NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owners name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City utilities to the owners name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
012612018 09:01:01 AM Page 1 of 1