Loading...
HomeMy WebLinkAbout3331 Stanford St - CO/LOC/Other - 01/26/2018City of Community Development & Neighborhood Services F. College Ave ort Collins 281 Collins,O8o Fort Collin, CO So522 970.221.676o 970.224.6134 -fax Temporary Certificate of Occupancy Permit #: B1601313 Work Description: NEW 3 STORY, 22,366 SQ FT, 18 UNIT MULTI- FAMILY BUILDING. CITY WATER. ENERGY COMPLIANCE: COMCHECK. JOB CONTACT: GREGORY PAVLICH 303-860-6660. This is to certify that the building, structure, or land located at 3331 STANFORD RD Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 01/26/2018 and conditional upon the following requirements being completed and approved upon final inspection. Bldg Dept Req Docs Rcvd Requirements to be Completed By: 01262018 Received and approved: Foundation/Footing/Formwork Engineers Letter, Pre/Post Tension Slab Engineers Letter, Welding/Bolting Engineers Letter; Mechanical'System Test Report (1 per dwelling unit); Multifamily Blower Door Test Report (20% of units = 4 units min). The following documents are still required prior to CO: Final Construction Waste Recycling Form with Receipts. Fire Authority Final Requirements to be Cor' mpleted By:, 01/31/2018 01242018 Finish up sprinkler issues.,. WWW Irrigation Final Re uirements to be Corn Ieted4B� : 04/16/20.,4�' g i_ q P y 11/142017 AaronSa`rtatyFoothillsjobsite C303.912.0187Eaamn.sarfaty@weftz.com Zoning Final Requirements -to. be Completed By: If such work is not completed within the time set forth above and approved on final inspection, or unless the time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation. Contractor/Owner/Lessee Date Ac-� yvv� Authorized By: Date of Issuance: 01/26/2018 NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owners name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City utilities to the owners name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 012612018 09:01:01 AM Page 1 of 1