Re: Foundation & Exterior Lateral Treatment Compliance Letter
Mail Creek Crossing
Plan D725/A/Full/3-Car Right
Lot 5, Block 10
5914 Piney Creek Drive
To Whom It May Concern:
We hereby state that the foundation and framing portion for the above referenced address
was constructed in general conformance with the construction documents designed for
this address.
Inspection Type: Date: Inspected By:
Footing Inspection
Foundation Wall Inspection
Concrete — Encased Electrode
Finished Wall Void Inspection
Exterior Lateral Treatment Inspection
Please contact us
Respectfully,
Ronald
Green (
0:41b
07/05/18
G.C.C.
07/20/18
G.C.C.
07/20/18
G.C.C.
07/25/18
G.C.C.
09/11/18
G.C.C.
A . Wassenaar
W Rp.W Gnrua�
Residential
2180 South Ivanhoe Street, Suite 5
Denver, CO 80222
Phone: (303) 759-8100
FIELD OBSERVATION REPORT Report#: DR-000002
Client: Project:
Richmond American Homes of Colorado, Inc. 165073R
4350 South Monaco Street 5914 Piney Creek Drive, Lot 5, Block 10
Denver, CO 80237 Mail Creek Crossing
Fort Collins, CO
PERIMETER DRAIN OBSERVATION
Activity Date: 07/27/2018
Technician: Henninger, Don
As requested, we arrived on site on this date to observe visible portions of the perimeter drain line. It is our opinion that the portions of
the perimeter drain observed on this date were in general conformance with our recommendations. If you have any questions
regarding this information, please call. Observations were conducted on a part-time, on -call basis.
:? 32593
07/31/2018
Kenneth R. Broseghini, P.E.
Senior Engineer
Observations are conducted on a part-time, on -call basis (unless noted otherwise). Information obtained by our Page 1 of 1
field representative pertain only to the portions of the foundation/construction items observed during our site visit.
Our opinions presented in this report are based on our knowledge of this project, our experience with similar
conditions and the standard of care normally practiced by other geotechnical engineers in this area and upon a
reasonable presumption that unobserved conditions were properly constructed.
A.G.w ssenaar FIELD OBSERVATION REPORT Refiort#:DP-000003
RNab] nnw.
Residential Client: Project:
2180 South Ivanhoe Street, Suite 5
Denver, CO 80222 Richmond American Homes of Colorado, Inc. 165073R
Phone: (303) 759-8100 4350 South Monaco Street 5914 Piney Creek Drive, Lot 5, Block 10
Denver, CO 80237 Mail Creek Crossing
Fort Collins, CO
DAMP -PROOFING OBSERVATION
Activity Date: 07/30/2018
Technician: Anderson, Tammy
As requested, we arrived on site on this date to observe the applied dampproofing material on below -grade living space foundation
walls. The portions of the dampproofing we observed were applied to the foundation walls that are planned to be below -grade, finished
space areas and we believe the observed dampproofing was applied in general conformance with our recommendations. If you have
any questions regarding this information, please call. Observations were conducted on a part-time, on -call basis.
� pDO��
1��������
32593
07/31 /2018
Kenneth R. Broseghini, P.E.
Senior Engineer
Observations are conducted on a part-time, on -call basis (unless noted otherwise). Information obtained by our Page 1 of 1
field representative pertain only to the portions of the foundation/construction items observed during our site visit.
Our opinions presented in this report are based on our knowledge of this project, our experience with similar
conditions and the standard of care normally practiced by other geotechnical engineers in this area and upon a
reasonable presumption that unobserved conditions were properly constructed.