HomeMy WebLinkAbout217 Cordova Rd - Disclosures/Blower Door Test - 05/02/2017,
Bldg: 39
Multi-Family Inspection Summary Report by Unit
05/02/2017
Inspection Performed By:
Neal Girard
970-556-0711
neal.girard@nrglogic.com
Subdivision:
Capstone Collegiate Communities
Supervisor:
Robert Ambrose
Buildings:
Inspected for the following programs/codes:
INSPECTION RESULTS: Builder Sign Off Required
Builder sign-off items must be corrected. See details on following pages for explanation of items requiring re-inspection.
Units Passed: Units to Address:
Bldg: 39 Unit: 1
Bldg: 39 Unit: 2
Bldg: 39 Unit: 3
EnergyLogic, Inc
(970) 556-0839 · www.nrglogic.com
PO Box N, Berthoud, CO 80513
Thank you for using EnergyLogic, Inc for your home inspections.
Prepared for:
Cottage Builders, Inc.
217 Cordova Road - Units 1-3
Builder Rough Energy Inspection Report
Rater Notes:
All units have builder sign off items.
All systems pass with allowable tolerance.
Please install gasket at wire penetrations in furnace boxes.
Target at 4% = 22 CFM.
Tested:
Unit A - 22
Unit B - 24
Unit C - 25
Bldg: 39 Unit: 1
Inspection Item Program Codes
Staircase framing at exterior wall/attic: air barrier installed
and sealed
Result:
IECC 09/12/15
ESv3 - 2.2 RFC
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam around OSB under stair
landing on main floor.
Air barrier present but not sealed
well
Inspection Item Program Codes
Tub, shower, and shower pans at exterior wall: air barrier
installed and sealed
Result:
IECC 09/12/15
ESv3 - 2.2 RFC
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam edges of OSB behind showers.
Air barrier present but not sealed
well
Inspection Item Program Codes
Foundation to sill plate: Connection between foundation
and sill plate has foam gasket AND completely sealed with
caulk, foam, or equivalent.
Result:
IECC 2015
ESv3 - 4.3 RFC
XCEL
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam sill plates to concrete and sub
floors.
Foam sill plate to foundation per
ENERGY STAR requirement.
Inspection Item Program Codes
Mechanical System #1 2012 IECC Total Duct Leakage:
Max leakage is 4% of conditioned floor area. (Does not
apply if 100% of ducts in conditioned space.)
Result:
IECC 2012
IECC 2015
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Install gasket at wire penetrations in
furnace boxes. All systems pass with
allowable tolerance. Target at 4% = 22
CFM. Tested: Unit A - 22 Unit B - 24
Unit C - 25
Bldg: 39 Unit: 2
Inspection Item Program Codes
Staircase framing at exterior wall/attic: air barrier installed
and sealed
Result:
IECC 09/12/15
ESv3 - 2.2 RFC
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam around OSB under stair
landing on main floor.
Air barrier present but not sealed
well
Inspection Item Program Codes
Tub, shower, and shower pans at exterior wall: air barrier
installed and sealed
Result:
IECC 09/12/15
ESv3 - 2.2 RFC
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam edges of OSB behind showers.
Air barrier present but not sealed
well
Inspection Item Program Codes
Foundation to sill plate: Connection between foundation
and sill plate has foam gasket AND completely sealed with
caulk, foam, or equivalent.
Result:
IECC 2015
ESv3 - 4.3 RFC
XCEL
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam sill plates to concrete and sub
floors.
Foam sill plate to foundation per
ENERGY STAR requirement.
Inspection Item Program Codes
Mechanical System #1 2012 IECC Total Duct Leakage:
Max leakage is 4% of conditioned floor area. (Does not
apply if 100% of ducts in conditioned space.)
Result:
IECC 2012
IECC 2015
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Install gasket at wire penetrations in
furnace boxes. All systems pass with
allowable tolerance. Target at 4% = 22
CFM. Tested: Unit A - 22 Unit B - 24
Unit C - 25
Bldg: 39 Unit: 3
Inspection Item Program Codes
Staircase framing at exterior wall/attic: air barrier installed
and sealed
Result:
IECC 09/12/15
ESv3 - 2.2 RFC
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam around OSB under stair
landing on main floor.
Air barrier present but not sealed
well
Inspection Item Program Codes
Tub, shower, and shower pans at exterior wall: air barrier
installed and sealed
Result:
IECC 09/12/15
ESv3 - 2.2 RFC
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam edges of OSB behind showers.
Air barrier present but not sealed
well
Inspection Item Program Codes
Foundation to sill plate: Connection between foundation
and sill plate has foam gasket AND completely sealed with
caulk, foam, or equivalent.
Result:
IECC 2015
ESv3 - 4.3 RFC
XCEL
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Foam sill plates to concrete and sub
floors.
Foam sill plate to foundation per
ENERGY STAR requirement.
Inspection Item Program Codes
Mechanical System #1 2012 IECC Total Duct Leakage:
Max leakage is 4% of conditioned floor area. (Does not
apply if 100% of ducts in conditioned space.)
Result:
IECC 2012
IECC 2015
Inspection Date Action Needed Photo
05/02/2017
Where/Description
Install gasket at wire penetrations in
furnace boxes. All systems pass with
allowable tolerance. Target at 4% = 22
CFM. Tested: Unit A - 22 Unit B - 24
Unit C - 25
Passed
Builder Sign Off - Builder will correct item without re-inspection
Failed
Failed - Builder must submit photo of correction in lieu of re-inspection
Prepared By: Neal Girard
970-556-0711 · neal.girard@nrglogic.com
EnergyLogic, Inc · www.nrglogic.com · (970)
556-0839
PO Box N, Berthoud, CO 80513