Loading...
HomeMy WebLinkAbout217 Cordova Rd - Disclosures/Blower Door Test - 05/02/2017, Bldg: 39 Multi-Family Inspection Summary Report by Unit 05/02/2017 Inspection Performed By: Neal Girard 970-556-0711 neal.girard@nrglogic.com Subdivision: Capstone Collegiate Communities Supervisor: Robert Ambrose Buildings: Inspected for the following programs/codes: INSPECTION RESULTS: Builder Sign Off Required Builder sign-off items must be corrected. See details on following pages for explanation of items requiring re-inspection. Units Passed: Units to Address: Bldg: 39 Unit: 1 Bldg: 39 Unit: 2 Bldg: 39 Unit: 3 EnergyLogic, Inc (970) 556-0839 · www.nrglogic.com PO Box N, Berthoud, CO 80513 Thank you for using EnergyLogic, Inc for your home inspections. Prepared for: Cottage Builders, Inc. 217 Cordova Road - Units 1-3 Builder Rough Energy Inspection Report Rater Notes: All units have builder sign off items. All systems pass with allowable tolerance. Please install gasket at wire penetrations in furnace boxes. Target at 4% = 22 CFM. Tested: Unit A - 22 Unit B - 24 Unit C - 25 Bldg: 39 Unit: 1 Inspection Item Program Codes Staircase framing at exterior wall/attic: air barrier installed and sealed Result: IECC 09/12/15 ESv3 - 2.2 RFC Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam around OSB under stair landing on main floor. Air barrier present but not sealed well Inspection Item Program Codes Tub, shower, and shower pans at exterior wall: air barrier installed and sealed Result: IECC 09/12/15 ESv3 - 2.2 RFC Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam edges of OSB behind showers. Air barrier present but not sealed well Inspection Item Program Codes Foundation to sill plate: Connection between foundation and sill plate has foam gasket AND completely sealed with caulk, foam, or equivalent. Result: IECC 2015 ESv3 - 4.3 RFC XCEL Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam sill plates to concrete and sub floors. Foam sill plate to foundation per ENERGY STAR requirement. Inspection Item Program Codes Mechanical System #1 2012 IECC Total Duct Leakage: Max leakage is 4% of conditioned floor area. (Does not apply if 100% of ducts in conditioned space.) Result: IECC 2012 IECC 2015 Inspection Date Action Needed Photo 05/02/2017 Where/Description Install gasket at wire penetrations in furnace boxes. All systems pass with allowable tolerance. Target at 4% = 22 CFM. Tested: Unit A - 22 Unit B - 24 Unit C - 25 Bldg: 39 Unit: 2 Inspection Item Program Codes Staircase framing at exterior wall/attic: air barrier installed and sealed Result: IECC 09/12/15 ESv3 - 2.2 RFC Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam around OSB under stair landing on main floor. Air barrier present but not sealed well Inspection Item Program Codes Tub, shower, and shower pans at exterior wall: air barrier installed and sealed Result: IECC 09/12/15 ESv3 - 2.2 RFC Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam edges of OSB behind showers. Air barrier present but not sealed well Inspection Item Program Codes Foundation to sill plate: Connection between foundation and sill plate has foam gasket AND completely sealed with caulk, foam, or equivalent. Result: IECC 2015 ESv3 - 4.3 RFC XCEL Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam sill plates to concrete and sub floors. Foam sill plate to foundation per ENERGY STAR requirement. Inspection Item Program Codes Mechanical System #1 2012 IECC Total Duct Leakage: Max leakage is 4% of conditioned floor area. (Does not apply if 100% of ducts in conditioned space.) Result: IECC 2012 IECC 2015 Inspection Date Action Needed Photo 05/02/2017 Where/Description Install gasket at wire penetrations in furnace boxes. All systems pass with allowable tolerance. Target at 4% = 22 CFM. Tested: Unit A - 22 Unit B - 24 Unit C - 25 Bldg: 39 Unit: 3 Inspection Item Program Codes Staircase framing at exterior wall/attic: air barrier installed and sealed Result: IECC 09/12/15 ESv3 - 2.2 RFC Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam around OSB under stair landing on main floor. Air barrier present but not sealed well Inspection Item Program Codes Tub, shower, and shower pans at exterior wall: air barrier installed and sealed Result: IECC 09/12/15 ESv3 - 2.2 RFC Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam edges of OSB behind showers. Air barrier present but not sealed well Inspection Item Program Codes Foundation to sill plate: Connection between foundation and sill plate has foam gasket AND completely sealed with caulk, foam, or equivalent. Result: IECC 2015 ESv3 - 4.3 RFC XCEL Inspection Date Action Needed Photo 05/02/2017 Where/Description Foam sill plates to concrete and sub floors. Foam sill plate to foundation per ENERGY STAR requirement. Inspection Item Program Codes Mechanical System #1 2012 IECC Total Duct Leakage: Max leakage is 4% of conditioned floor area. (Does not apply if 100% of ducts in conditioned space.) Result: IECC 2012 IECC 2015 Inspection Date Action Needed Photo 05/02/2017 Where/Description Install gasket at wire penetrations in furnace boxes. All systems pass with allowable tolerance. Target at 4% = 22 CFM. Tested: Unit A - 22 Unit B - 24 Unit C - 25 Passed Builder Sign Off - Builder will correct item without re-inspection Failed Failed - Builder must submit photo of correction in lieu of re-inspection Prepared By: Neal Girard 970-556-0711 · neal.girard@nrglogic.com EnergyLogic, Inc · www.nrglogic.com · (970) 556-0839 PO Box N, Berthoud, CO 80513