Loading...
HomeMy WebLinkAbout1206 Gold Dr - Disclosures/Mechanical - 06/20/2017, Bldg: 36 Multi-Family Inspection Summary Report by Unit 06/20/2017 Inspection Performed By: Trevor Donnelly trevor.donnelly@nrglogic.com Subdivision: Capstone Collegiate Communities Supervisor: Robert Ambrose Buildings: Inspected for the following programs/codes: INSPECTION RESULTS: Builder Sign Off Required Builder sign-off items must be corrected. See details on following pages for explanation of items requiring re-inspection. Units Passed: Units to Address: Bldg: 36 Unit: 3 Bldg: 36 Unit: 1 Bldg: 36 Unit: 2 EnergyLogic, Inc (970) 556-0839 · www.nrglogic.com PO Box N, Berthoud, CO 80513 Thank you for using EnergyLogic, Inc for your home inspections. Prepared for: Cottage Builders, Inc. 1206 Gold Drive - Units 1 - 3 Builder Rough Energy Inspection Report Bldg: 36 Unit: 1 Inspection Item Program Codes Continuous sealed top & bottom plates or sealed blocking using silicone caulk, latex foam, or equivalent material Result: IECC 09/12/15 ESv3 - 4.4 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Bottom plates can use a second application of foam once fully cleaned and right before drywall/ after if they leave a gap Inspection Item Program Codes Party walls: gap between common wall and structural framing between units fully sealed (Fire code issues may apply) Result: IECC 2012/2015 ESv3 - 4.8 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Party wall bottom plate not foamed!! Inspection Item Program Codes Window & Door Frames foam, caulked, or sealed to house framing Result: IECC 09/12/15 ESv3 - 4.6 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description windows not installed yet Inspection Item Program Codes Mechanical System #1 2012 IECC Total Duct Leakage: Max leakage is 4% of conditioned floor area. (Does not apply if 100% of ducts in conditioned space.) Result: IECC 2012 IECC 2015 Inspection Date Action Needed Photo 06/20/2017 Where/Description Great job! Target 34 Tested 25 Bldg: 36 Unit: 2 Inspection Item Program Codes Electric wiring: Penetrations to unconditioned space sealed Result: IECC 09/12/15 ESv3 - 4.1 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description I missed this in the first two units so please check there as well but the front dropped ceiling/ attic area has wire penetrations that are not foamed Inspection Item Program Codes Plumbing/piping: Penetrations to unconditioned space sealed Result: IECC 09/12/15 ESv3 - 4.1 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Plumbing into attic platform needs foam Inspection Item Program Codes Continuous sealed top & bottom plates or sealed blocking using silicone caulk, latex foam, or equivalent material Result: IECC 09/12/15 ESv3 - 4.4 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Bottom plates can use a second application of foam once fully cleaned and right before drywall/ after if they leave a gap Inspection Item Program Codes Party walls: gap between common wall and structural framing between units fully sealed (Fire code issues may apply) Result: IECC 2012/2015 ESv3 - 4.8 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Wire pens into party wall on first floor- please check on other units as well Party wall bottom plate not foamed!! Inspection Item Program Codes Window & Door Frames foam, caulked, or sealed to house framing Result: IECC 09/12/15 ESv3 - 4.6 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Some windows could use touch ups- please review all windows Inspection Item Program Codes Mechanical System #1 2012 IECC Total Duct Leakage: Max leakage is 4% of conditioned floor area. (Does not IECC 2012 IECC 2015 apply if 100% of ducts in conditioned space.) Result: Inspection Date Action Needed Photo 06/20/2017 Where/Description Great job! Target 34 Tested 26 Bldg: 36 Unit: 3 Inspection Item Program Codes Continuous sealed top & bottom plates or sealed blocking using silicone caulk, latex foam, or equivalent material Result: IECC 09/12/15 ESv3 - 4.4 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Bottom plates can use a second application of foam once fully cleaned and right before drywall/ after if they leave a gap Inspection Item Program Codes Party walls: gap between common wall and structural framing between units fully sealed (Fire code issues may apply) Result: IECC 2012/2015 ESv3 - 4.8 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Party wall bottom plate not foamed!! Inspection Item Program Codes Window & Door Frames foam, caulked, or sealed to house framing Result: IECC 09/12/15 ESv3 - 4.6 RFC Inspection Date Action Needed Photo 06/20/2017 Where/Description Some windows could use touch ups Inspection Item Program Codes Mechanical System #1 2012 IECC Total Duct Leakage: Max leakage is 4% of conditioned floor area. (Does not apply if 100% of ducts in conditioned space.) Result: IECC 2012 IECC 2015 Inspection Date Action Needed Photo 06/20/2017 Where/Description Great job! Target 34 Tested 19 Passed Builder Sign Off - Builder will correct item without re-inspection Failed Failed - Builder must submit photo of correction in lieu of re-inspection Prepared By: Trevor Donnelly · trevor.donnelly@nrglogic.com EnergyLogic, Inc · www.nrglogic.com · (970) 556-0839 PO Box N, Berthoud, CO 80513