Loading...
HomeMy WebLinkAbout821 W Lake St - Disclosures/Blower Door Test - 06/01/2018 (2)BUILDING LEAKAGE TEST GS Services LTD 2000 S College Ave Suite 308 Fort Collins, CO 80525 Email: buildingperformance@gsservices.com Website: gsservices.com Date of Test: 6/1/2018 Technician: Nick Hiseler Test File: Brinkman Construction - 821 W Lake Street Project Unit 404 Number: -Type H.2 - BDexp Customer: Brinkman Construction Phone: Fax: Building Address: Stadium Apartments 821 W Lake Street Unit 404 Fort Collins, CO Test Results at 50 Pascals: cfm50 Airflow 717 ( +/- 1.2 %) ACH50 cfm/ft² (Floor Area) 0.4076 cfm/ft² (Surface Area) 0.1380 Leakage Areas: 55.5 in² ( +/- 3.7 %) Canadian EqLA @ 10 Pa or 0.0107 in²/ft² Surface Area 25.0 in² ( +/- 6.1 %) LBL ELA @ 4 Pa or 0.0048 in²/ft² Surface Area Building Leakage Curve: Flow Coefficient (C) = 27.9 ( +/- 9.7 %) Exponent (n) = 0.830 ( +/- 0.026 ) Correlation Coefficient = 0.99937 Test Standard: E779-10 Test Mode: Depressurization 4 5 6 7 8 9 10 20 30 40 50 60 70 80 Building Pressure (Pa) 80 90 100 200 300 400 500 600 700 800 900 1000 Building Leakage (cfm) Depressurize _____ BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 6/1/2018 Test File: Brinkman Construction - 821 W Lake Street Unit 404 -Type H.2 - BDexp Building Information Volume (ft³) Surface Area: (ft²) 5200 Floor Area: (ft²) 1760 Height (ft) 10 Year of Construction 2017 Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) 19247 1/23/2017 Micromanometer Energy Conservatory DG700 19028-7 9/9/2014 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 6/1/2018 Test File: Brinkman Construction - 821 W Lake Street Unit 404 -Type H.2 - BDexp Depressurization Test: Environmental Data Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft) Pre-Test 78.0 82.0 Post-Test 78.0 82.0 Average 78.0 82.0 5000.0 Data Points Nominal Building Pressure (Pa) Baseline Adjusted Building Pressure (Pa) Fan Pressure (Pa) Nominal Flow (cfm) Adjusted Flow (cfm) % Error Fan Configuration -8.1 n/a n/a -70.8 -64.2 191.7 820 893 1.2 Ring B -64.3 -57.7 156.5 742 808 0.0 Ring B -59.4 -52.7 136.4 693 755 0.6 Ring B -53.8 -47.1 109.4 621 677 -1.0 Ring B -48.6 -41.9 90.7 566 616 -0.6 Ring B -42.7 -36.1 72.0 505 550 0.5 Ring B -37.6 -31.0 52.5 432 470 -2.5 Ring B -31.0 -24.3 37.2 364 396 0.4 Ring B -25.9 -19.2 174.4 302 329 1.3 Ring C -5.2 n/a n/a Deviations from Standard ASTM E779-10 - Test Parameters - Pressurization test not included. BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 6/1/2018 Test File: Brinkman Construction - 821 W Lake Street Unit 404 -Type H.2 - BDexp Comments None