Loading...
HomeMy WebLinkAbout821 W Lake St - Disclosures/Blower Door Test - 07/02/2018 (4)BUILDING LEAKAGE TEST GS Services LTD 2000 S College Ave Suite 308 Fort Collins, CO 80525 Email: buildingperformance@gsservices.com Website: gsservices.com Date of Test: 7/2/2018 Technician: Nick Hiseler Test File: Brinkman Construction - 821 W Lake Street Project Unit 115 Number: - Type N - BDexp2 Customer: Brinkman Construction Phone: Fax: Building Address: Stadium Apartments 821 W Lake Street Unit 115 Fort Collins, CO Test Results at 50 Pascals: cfm50 Airflow 885 ( +/- 0.7 %) ACH50 cfm/ft² (Floor Area) 0.9457 cfm/ft² (Surface Area) 0.2844 Leakage Areas: 90.7 in² ( +/- 1.7 %) Canadian EqLA @ 10 Pa or 0.0291 in²/ft² Surface Area 48.1 in² ( +/- 2.8 %) LBL ELA @ 4 Pa or 0.0155 in²/ft² Surface Area Building Leakage Curve: Flow Coefficient (C) = 68.4 ( +/- 4.6 %) Exponent (n) = 0.655 ( +/- 0.013 ) Correlation Coefficient = 0.99971 Test Standard: E779-10 Test Mode: Depressurization 4 5 6 7 8 9 10 20 30 40 50 60 70 Building Pressure (Pa) 100 200 300 400 500 600 700 800 900 1000 2000 Building Leakage (cfm) Depressurize _____ BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 7/2/2018 Test File: Brinkman Construction - 821 W Lake Street Unit 115 - Type N - BDexp2 Building Information Volume (ft³) Surface Area: (ft²) 3112 Floor Area: (ft²) 936 Height (ft) 10 Year of Construction 2017 Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) 19247 1/23/2017 Micromanometer Energy Conservatory DG700 42530-7 1/22/2016 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 7/2/2018 Test File: Brinkman Construction - 821 W Lake Street Unit 115 - Type N - BDexp2 Depressurization Test: Environmental Data Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft) Pre-Test 74.0 70.0 Post-Test 74.0 70.0 Average 74.0 70.0 5000.0 Data Points Nominal Building Pressure (Pa) Baseline Adjusted Building Pressure (Pa) Fan Pressure (Pa) Nominal Flow (cfm) Adjusted Flow (cfm) % Error Fan Configuration -0.9 n/a n/a -60.6 -59.7 28.3 970 995 0.1 Ring A -55.5 -54.7 233.2 904 927 -1.2 Ring B -52.6 -51.8 217.7 874 896 -1.0 Ring B -45.5 -44.7 185.6 807 828 0.7 Ring B -42.2 -41.3 168.0 768 788 0.9 Ring B -38.0 -37.1 144.3 713 731 0.4 Ring B -32.1 -31.2 115.3 638 654 0.6 Ring B -26.0 -25.1 86.0 551 566 0.4 Ring B -20.5 -19.6 61.6 467 480 -0.2 Ring B -15.0 -14.1 39.4 375 385 -0.7 Ring B -0.9 n/a n/a Deviations from Standard ASTM E779-10 - Test Parameters - Pressurization test not included. BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 7/2/2018 Test File: Brinkman Construction - 821 W Lake Street Unit 115 - Type N - BDexp2 Comments None